N. Bacalso Avenue, Cebu City, Philippines
In Partial Fulfillment
of the Requirements for the Degree of
BACHELOR OF SCIENCE IN INDUSTRIAL ENGINEERING
By:
ERIKA A. ALBUERA
DARLA MAE P. CASERO
RYAN EUSEBIO
ANGELA KLARA B. RUEDT
1.1 Rationale
integration, complex interactions among system elements, and high capital costs. While
modeling and analysis are important to help ensure good system performance, the
integration and complexity of systems often makes purely analytic tools difficult to use.
Hence, simulation remains one of the most widely used tools to fill this need [1].
Simulation is the imitation of the operation of a real-world process or system over time
effective manner. It provides a safe way to explore different options to be able to make
the right decision before making real-world changes. Virtual investigations using
simulation models are less expensive and time consuming than real-world experiments,
with only the use of lesser resources. Simulation is frequently the technique of choice in
problem solving. Simulation is also being used to study systems in the design phase
before such systems are built so that the problem may be identified and resolved well
Many manufacturing firms use computer simulation to plan, develop, execute, and
frequently designed using simulation modeling. Simulation has been widely used in the
the impact of variability on system behavior as well as exploring various strategies to cope
with changes and uncertainty [3]. Using a valid simulation model gives several benefits
and advantages in developing a better system and in predicting the system behavior
● To show the process of the existing operation by the toy airplane manufacturing
company.
● To present the total number of machines and personnel needed in meeting the
Place Delimitation
Time Delimitation
This study will take place between November 23, 2021 and December 9, 2021
which is the second cluster of Academic Year 2021-2022 of Cebu Institute of Technology
– University.
conducted virtually. The face-to-face set-up was momentarily transformed into an online
set-up in which the CIT University strictly follows through the foundation MADE4Learners
Framework. This framework is designed to enable the students to still be creative and
innovative under the new normal using the Technology Support Tools in the comforts of
their homes.
Subject Delimitation
The focus of the researchers is solely on the manufacture of the Toy Airplane. The
existing set up of the manufacturing company will be analyzed for the provision of
and personnel needed to meet the daily requirements of the company will also be
presented.
producing; Plane A=1000, Plane B=1500, and Plane C= 1800. For the next six months
the company expects demand to increase by 30%. With the company’s conditions and
existing process, this study will provide the total number of machines and personnel in
This study will provide an actual simulation of the descriptive (existing) phase of
the company and prescriptive suggestions of the researchers using Promodel 7.5 for a
precise presentation. Companies can get an idea on how to make their production more
· Researchers
This study will provide a learning experience for the researchers as they will
provide solutions to the company’s problem and will present it using a simulation
model.
· Future Researchers
The future researchers can further improve the current study by filling the gap.
They will also gain some insight from this research on how to provide answers and
production-wise.
ASSUMPTIONS
DIE CASTING
Hours required = 3 min / 60 min/ hr x 717 raw material / .88 = 40.74 hours
CUTTING
Hours required = .35 min / 60 min/hr x 4300 raw materials / .88 = 28.50 hours
Hours required = .26 min / 60 min /hr x 4300 raw materials / .88 = 21.17 hours
COATING
Hours required = 12 min / 60 min/hr x 3300 raw materials /.88 / 24= 31.25 hours
Hours required = .40 min / 60 min/hr x 4300 raw materials / .88 = 32.58 hours
In this part of the study the utilization rate will be presented. To sum everything
up, here are the average utilization rate of the machines involved in each operation:
78.57% for Die Casting Machine, 19.26% for the Cutting Machine, 19.1% for the
Grinding Machine, 7.08% for the Coating Machine, 0.63% for the Inspection and
Packaging.
The average idle percentage of each machine involved in the operation are the
following: 21.43% for the Die Casting Machine, 80.47% for the Cutting Machine, 80.90%
for the Grinding Machine, 92.92% for the Coating Machine, and 99.37% for the Inspection
and Packaging.
The utilization average of the resources are the following: Automated Die Caster is
DIE CASTING
Hours required = 3 min / 60 min/ hr x 932 raw material / .88 = 52.95 hours
CUTTING
Hours required = .35 min / 60 min/hr x 5590 raw materials / .88 = 37.05 hours
GRINDING
Hours required = .26 min / 60 min /hr x 5590 raw materials / .88 = 27.53 hours
Hours available per machine = 8 hours x 1 = 8 hours available
COATING
Hours required = 12 min / 60 min/hr x 179 raw materials /.88 = 40.68 hours
Hours required = .40 min / 60 min/hr x 179 raw materials / .88 = 1.35 hours
For the proposed operation of the Toy Airplane Company, the following are the
utilization rate average of the machines involved: Die Casting Machine is 75.44%, Cutting
Casting Machine, 49.55% for Cutting Machine, 61.88% for Grinding Machine, 85.16% for
resources: Automated Die Caster is 63.48%, Cutter is 93.90%, Grinder is 74.54%, Coater
8.86%.
The idle rate of the resources for the proposed method are as follows: Automated Die
For the prescriptive operation of the machines, the following are the utilization
rate: Die Casting Machine is 80.03%, Cutting is 42.4%, Grinding is 28.13%, Coating is
Packaging is 98.16%.
Automated Die Caster average utilization rate is 25.23%, Cutter is 7.36%,
OUTPUT
Plane Type
EXISTING PROPOSED PRESCRIPTIVE
Plane A 1152 2592 1872
Plane B 2016 4320 2880
Plane C 2016 5328 3600
Recommendation
-It is also recommended to consult an expert who has better knowledge and skills in
-If promodel is used for simulation it is recommended to use the latest/updated version.
Conclusion
The team suggests that the prescriptive solution must be implemented, since the
output of the model produces batch airplanes with values of A, B, and C not far from each
other and at the same time meeting the demand nearer compared with the proposed
solution. In order to increase efficiency of both resources and machines, the same
number of resources must match locations. Reducing the overall number of machines in
the facility and resources will reduce machine costs, workforce costs, and material costs.