Kebutuhan Material KBB

No Material Vol Sat


Pekerjaan Instalasi KBB
Pekerjaan KWH ke MDP
1 skun 16 mm² 10 bh
2 sleeve skun 16 mm² 10 bh
3 kabel LVTC 4x16mm² 35 m
4 PVC 1,5 inch 30 m
5 shock pipa 1,5 inch 20 bh
6 knee 1,5 inch 20 bh
7 kabel tray 20 m
Pekerjaan MDP ke SDP Pompa 3
1 Kabel LVTC 4x16 mm² 35 m
2 skun 16 mm² (LVTC) 10 bh
3 sleeve skun 16 mm² 10 bh
4 PVC 1,5 inch 20 m
5 shock pipa 1,5 inch 10 bh
6 knee 1,5 inch 10 bh
7 kabel ties 200 mm 2 pack

Pekerjaan MDP ke SDP Pompa 2


1 kabel LVTC 4x50 mm² 370 m
2 skun 50 mm² (LVTC) 12 bh
3 sleeve skun 50 mm² 12 bh
4 kabel ties 200 mm 2 pack
Pekerjaan MDP ke SDP Pompa 1
1 Kabel LVTC 4x70 mm² 670 m
2 skun 70 mm² (LVTC) 10 bh
3 sleeve skun 70 mm² 10 bh
4 kabel ties 200 mm 2 pack