Kebutuhan Material KBT

No Material Vol Sat


Pekerjaan Instalasi KBT
Pekerjaan MDP ke SDP Overbrengeen
1 Kabel NYY 4x25 mm² 300 m
2 skun 25 mm² (NYY) 10 bh
3 sleeve skun 25 mm² 10 bh
4 PVC 1,5 inch 20 m
5 shock pipa 1,5 inch 10 bh
6 knee 1,5 inch 10 bh
7 kabel ties 200 mm 2 pack

Pekerjaan MDP ke SDP Gate Pos 1


1 kabel LVTC 4x35 mm² 300 m
2 skun 35 mm² (LVTC) 12 bh
3 sleeve skun 35 mm² 12 bh

Pekerjaan KWH ke MDP


1 skun 16 mm² (NYY) 10 bh
2 sleeve skun 16 mm² 10 bh
3 kabel NYY 4x16mm² 35 m
4 PVC 1,5 inch 30 m
5 shock pipa 1,5 inch 20 bh
6 knee 1,5 inch 20 bh