0 Pekerjaan Persiapan
1 Pekerjaan Plumbing
2 Pekerjaan Elektrikal
3 Pekerjaan Elektronik & Data
4 Pekerjaan AC

Sub Total Pekerjaan


PPN 10%
Total Pekerjaan
PEKERJAAN PLUMBING
Air Bersih, Buangan, & Air Kotor

# Item Description Brand & Model Remarks Unit Vol


Material Utama Air Bersih
1 Roof Tank (Toren) Kap. 2000 Liter PENGUIN Unit 1
2 Electric Water Heater 300 Liter ARISTON Unit 1
Pemipaan Water Heater Ls 1
3 Ground Tank Kap. 1000 Liter PENGUIN Unit 1
4 Paket Pompa Booster GRUNDFOS Set 1
Cap : 2x66 Lpm
Head : 8 Meter
Daya : 1,1 kW
Parallel Alternate Function
Booster Control Panel DIGI Unit 1
5 Pompa Transfer GRUNDFOS Unit 1
Cap : 9 CMH
Head : 36 Meter
Daya : 1,3 kW
Single Function
Water Level Control OMRON Unit 1

Material Utama Air Kotor


STP Biotech Kap 3 m3 BIOTECH SETARA Unit 1
Sumur Resapan LOKAL Unit 1
Pemipaan Septic Tankl & Sumur Resapan Ls 1

Material Pendukung Material Utama


Header Pompa Transfer ASIALING PIPA PPR PN10 Set 1
Header Pompa Booster ASIALING PIPA PPR PN10 Set 1
Header Pompa Air Panas ASIALING PIPA PPR PN20 Set 1

Valve & Accessories


Gate Valve
Dia 40mm GALA Unit 1
Dia 32mm GALA Unit 2
Dia 25mm GALA Unit 10
Dia 20mm GALA Unit 4

Check Valve
Dia 25mm GALA Unit 4

Strainer
Dia 25mm GALA Unit 4

Foot Valve
Dia 25mm GALA Unit 1

Floating Valve PDAM Dia 20mm YUTA Unit 1


Pressure Gauge VPG Unit 1

Pipa Riser
Supply & Install PPR PN10 With Spec,
M 20.33
Ls 1

Supply & Install PPR PN20 With Spec,


Dia 25mm ASIALING M 20.33
Fitting & Accessories Ls 1

Lantai Dasar
Pipa Mainline
Supply & Install PPR PN10 With Spec,
Dia 32mm ASIALING M 35.3
Fitting & Accessories Ls 1

Supply & Install PPR PN20 With Spec,


Dia 25mm ASIALING M 35.3
Fitting & Accessories Ls 1

Pipa Distribusi
Supply & Install PPR PN10 With Spec,
Dia 25mm ASIALING M 9.34
Dia 20mm ASIALING M 26.1
Fitting & Accessories Ls 1
Supply & Install PPR PN20 With Spec,
Dia 25mm ASIALING
Fitting & Accessories M 29.11
Ls 1
Valve & Accessories
Ball Valve
Dia 32mm GALA Unit 1
Dia 25mm GALA Unit 6

Pemasangan Sanitary
Toilet Duduk DIGIGUARD Unit 3
Jet Washer DIGIGUARD Unit 3
Wastafel DIGIGUARD Unit 4
Kran Standar DIGIGUARD Unit 3
Kran Taman DIGIGUARD Unit 2

Lantai Dua
Pipa Mainline
Supply & Install PPR PN10 With Spec,
Dia 32mm ASIALING
Fitting & Accessories M 35.81
Ls 1

Supply & Install PPR PN20 With Spec,


Dia 25mm ASIALING M 27.812
Fitting & Accessories Ls 1

Pipa Distribusi
Supply & Install PPR PN10 With Spec,
Dia 25mm ASIALING M 24.5
Dia 20mm ASIALING M 23.31
Fitting & Accessories Ls 1
Supply & Install PPR PN20 With Spec,
Dia 25mm ASIALING
Fitting & Accessories M 23
Ls 1

Valve & Accessories


Ball Valve
Dia 32mm GALA Unit 1
Dia 25mm GALA Unit 5

Pemasangan Sanitary
Toilet Duduk DIGIGUARD Unit 2
Jet Washer DIGIGUARD Unit 2
Wastafel DIGIGUARD Unit 4
Kran Standar DIGIGUARD Unit 1

Pekerjaan Air Buangan & Hujan

Pipa Riser
Supply & Install PVC AW With Spec,
Dia 80mm ~ Air Buangan PRALON M 35.3
Dia 80mm ~ Air Kotor PRALON M 29.19
Dia 80mm ~ Air Hujan PRALON M 35.3
Fitting & Accessories Ls 1

Lantai Dasar
Pipa Mainline
Supply & Install PVC AW With Spec,
Dia 65mm ~ Air Buangan PRALON M 49.7
Dia 80mm ~ Air Hujan Ke Saluran Kota PRALON M 28
Dia 65mm ~ Air Kotor PRALON M 40
Fitting & Accessories Ls 1

Pipa Cabang
Supply & Install PVC AW With Spec,
Dia 65mm ~ Air Buangan PRALON M 27
Dia 50mm ~ Air Kotor PRALON M 12
Fitting & Accessories Ls 1

Floor Clean Out Dia 80 KHARISMA Unit 1


Floor Clean Out Dia 65 KHARISMA Unit 2
Ceiling Clean Out Dia 65mm RUCIKA Unit 2

Lantai Dua
Pipa Mainline
Supply & Install PVC AW With Spec,
Dia 65mm ~ Air Buangan PRALON M 35
Dia 65mm ~ Air Kotor PRALON M 6
Fitting & Accessories Ls 1

Pipa Cabang
Supply & Install PVC AW With Spec,
Dia 65mm ~ Air Buangan PRALON M 32.99
Dia 50mm ~ Air Kotor PRALON M 14
Fitting & Accessories Ls 1

Lantai Roof
Pipa Mainline
Dia 65mm ~ Air Hujan PRALON M 29
Fitting & Accessories Ls 1

Pipa Cabang
Dia 65mm ~ Air Hujan PRALON M 8.8
Fitting & Accessories Ls 1
Roof Drain 3 Inch LOKAL Unit 3

Total Pekerjaan Plumbing


PEKERJAAN ELECTRICAL

# Item Description Brand & Model Remarks Unit Vol Unit Price Total Price

Material Utama Electrical


Pengadaan & Instalasi Panel
1 LVMDP ABB Unit 1
2 PP-LT2 ABB Unit 1
4 PP-CAFE ABB Unit 1
5 PP-GENSET ABB Unit 1

Genset 80 kVA CUMMINS Unit 1


Pemipaan Muffler
Pengkabelan
Supporting Material & Accessories

Pekerjaan Grounding DIGI Ls 1


Copper Rod
NYA 70
Control Box
Supporting Material & Accessories

Pekerjaan Penangkal Petir DIGI Ls 1


Copper Splitzen 60cm + Base Plate
Copper Rod
NYA 70
Control Box
Supporting Material & Accessories

Kabel Feeder Electrical


Meteran PLN ~ LVMDP ; NYY 4x95 SUTRADO M 29
LVMDP - PP-LT2 ; NYY 4x70 + NYA 70 SUTRADO M 21.33
LVMDP - PP-CAFE ; NYY 4x6 + NYA 6 SUTRADO M 12

Lantai Dasar
Lighting & Armature
Downlight Panel 12W PHILIPS Unit 28
Downlight Panel 12W + Nicad Battery PHILIPS Unit 7
Downlight Recessed Spot 7,5W PHILIPS Unit 17
Downlight Recessed Spot 7,5W + Nicad Battery PHILIPS Unit 2
Led Strip 116lm/M PHILIPS M 27
Ground Uplight PHILIPS Unit 5

Single Switch BOSS Unit 7


Double Switch BOSS Unit 9
Dimmer BOSS Unit 1
Stop Kontak 16A BOSS Unit 20
Stop Kontak AC 32A BOSS Unit 8
Stop Kontak Meja Set BOSS Unit 12
Stop Kontak Lantai BOSS Unit 5

Pengkabelan
Lighting Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 59
LED Strip Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 1
Switch Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 17
Projector Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 2

Lantai Dua
Lighting & Armature
Downlight Panel 12W PHILIPS Unit 30
Downlight Panel 12W + Nicad Battery PHILIPS Unit 5
Downlight Recessed Spot 7,5W PHILIPS Unit 8
Downlight Recessed Spot 7,5W + Nicad Battery PHILIPS Unit 2
Led Strip 116lm/M PHILIPS M 0
Ground Uplight PHILIPS Unit 3
Single Switch BOSS Unit 5
Double Switch BOSS Unit 5
Dimmer BOSS Unit 1
Stop Kontak 16A BOSS Unit 15
Stop Kontak AC 32A BOSS Unit 6
Stop Kontak Meja Set BOSS Unit 38
Stop Kontak Lantai BOSS Unit 6

Pengkabelan
Lighting Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 48
LED Strip Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 0
Switch Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 76
Projector Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 0

Lantai Roof
Lighting & Armature
Ground Uplight PHILIPS Unit 2

Double Switch BOSS Unit 1

Pengkabelan
Lighting Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 2
Switch Cable ; NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 1

Total Pekerjaan Electrical


PEKERJAAN AIR CONDITIONING & FAN

# Item Description Brand & Model Remarks Unit Vol Unit Price Total Price

Material Utama AC
Pengadaan & Instalasi AC Split Wall Mounted

Lantai Dasar
1 AC Ruang Lobby & Resepsionis DAIKIN Unit 2
Type : Wallmounted Split
Kap : 12.000 Btu/H
Daya : 1,1kW
Bracket, Accessories & Penggantung Included

2 AC Ruang Meeting DAIKIN Unit 1


Type : Wallmounted Split
Kap : 18.000 Btu/H
Daya : 1,8kW
Bracket, Accessories & Penggantung Included

3 AC Ruang Kerja DAIKIN Unit 2


Type : Wallmounted Split
Kap : 18.000 Btu/H
Daya : 1,8kW
Bracket, Accessories & Penggantung Included

4 AC Ruang Server DAIKIN Unit 2


Type : Wallmounted Split
Kap : 5.000 Btu/H
Daya : 0,38kW
Bracket, Accessories & Penggantung Included

5 AC Ruang Publik DAIKIN Unit 1


Type : Wallmounted Split
Kap : 9.000 Btu/H
Daya : 0,78kW
Bracket, Accessories & Penggantung Included

6 AC Koridor DAIKIN Unit 1


Type : Ceiling Mounted Cassette
Kap : 18.000 Btu/H
Daya : 1,76kW
Bracket, Accessories & Penggantung Included

7 Ceiling Mounted Fan 200 CFM KDK Unit 5

Lantai Dua
AC Ruang Communal Unit 3
Type : Ceiling Mounted Cassette
Kap : 23.000 Btu/H
Daya : 2,05kW
Bracket, Accessories & Penggantung Included

8 Ceiling Mounted Fan 200 CFM KDK Unit 2


9 Ceiling Propeller Fan 1566 CFM ANEMON WOOD Unit 2

Material Pendukung AC

Lantai Dasar
Pengadaan & Instalasi Pipa Refrigerant Preinsulated
Lobby & Resepsionis ; 1/4 x 3/8 KOIDO M 60
Ruang Meeting ; 1/4 x 1/2 KOIDO M 24
Ruang Kerja ; 1/4 x 1/2 KOIDO M 21
Ruang Server ; 1/4 x 3/8 KOIDO M 27
Ruang Public ; 1/4 x 3/8 KOIDO M 12
Koridor ; 1/4 x 1/2 KOIDO M 15

Pengadaan & Instalasi Pipa Drain PVC AW D + Isolasi


Pipa Riser
Dia 32mm PRALON M 19
Fitting & Accessories Ls 1
Mainline
Dia 25mm PRALON M 62
Fitting & Accessories Ls 1

Cabang
Dia 20mm PRALON M 27
Fitting & Accessories Ls 1

Pengadaan & Instalasi Kabel Listrik untuk AC


AC Split - NYM 3x2,5 + PVC HIC 20mm SUTRADO Ttk 8
AC Cassette - NYM 3x4 + PVC HIC 20mm SUTRADO Ttk 1

Pengadaan & Instalasi Pipa Exhaust PVC AW D


Dia 100mm PRALON M 26
Flexible Pipe Dia 100mm FittingPOLAR
& Accessories M 20
Ls 1
Lantai Dua
Pengadaan & Instalasi Pipa Refrigerant Preinsulated
Ruang Communal ; 1/4 x 5/8 KOIDO M 42

Pengadaan & Instalasi Pipa Drain PVC AW D + Isolasi


Mainline
Dia 25mm KOIDO M 15
Fitting & Accessories Ls 1

Cabang
Dia 20mm KOIDO M 9
Fitting & Accessories Ls 1

Pengadaan & Instalasi Kabel Listrik untuk AC


AC Cassette - NYM 3x4 + PVC HIC 20mm SUTRADO Ttk 3

Pengadaan & Instalasi Pipa Exhaust PVC AW D


Dia 100mm Flexible Pipe Dia 100mm
PRALON M 8
Fitting & Accessories POLAR M 13
Ls 1
Rack Outdoor AC
Testing & Commissioning Lot 1
Lot 1
Total Peke
rjaan AC & Fan
PEKERJAAN DATA, WIFI & CCTV

# Item Description Brand & Model Remarks Unit Vol Unit Price Total Price

Material Utama DATA


Pengadaan & Instalasi Rak Server Utama

Rack Server 32U INDORACK Unit 1


Router Firewall UBIQUITI Unit 1
Core Switch 16 Port UBIQUITI Unit 1
Data Switch 48 Port UBIQUITI Unit 1
PBX Switch 24 Port UBIQUITI Unit 1
Data Switch 24 Port UBIQUITI Unit 1
CCTV Switch 24 Port with PoE UBIQUITI Unit 1
UPS 3kVA ICA Unit 1
Surge Arrester Unit SCHNEIDER Set 1
Patch Panel 24 Port AMP Set 5
Koneksi dengan Telkom DIGI Ls 1
Pengkabelan Rack Utama DIGI Ls 1

ODP 8 Port LS CABLE Unit 2


Aksesoris ODP LS CABLE Ls 1
Kabel FO 8-Core + PVC HIC 20mm LS CABLE M 30
Terminasi & Testing Kabel FO LS CABLE Ls 1

Sistem Kontrol Akses ZKTECO Unit 1


Box Panel Akses Kontrol LOKAL Unit 1

IP PBX 30 Ext YEASTAR Unit 1

NVR 16 Channel HIKVISION Unit 1


Harddisk 8TB SEAGATE Set 1

Material Pendukung DATA


Lantai Dasar

Wifi Access Point UBIQUITI Unit 2


Dome Camera 2MP HIKVISION Unit 10
Socket Data BOSS Unit 14
Socket Telepon BOSS Unit 7

Reader Akses Kontrol ZKTECO Unit 2


EM Lock Akses LOKAL Unit 2
Exit Button LOKAL Unit 2
Box Panel Akses LOKAL Unit 1
IP Phone PoE YEALINK Unit 7

Standalone Smoke Detector GFS Unit 16

Pengkabelan
Wifi Access Point ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 2
CCTV ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 10
Titik Data ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 14
Titik Telepon ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 7
Titik IPTV ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 4
Titik Akses ~ STP AWG 18 + PVC HIC 20mm LS CABLE Ttk 4

Material Pendukung DATA


Lantai Dasar

Wifi Access Point DIGI Unit 2


Dome Camera 2MP HIKVISION Unit 6
Socket Data BOSS Unit 21
Socket Telepon BOSS Unit 5
Reader Akses Kontrol ZKTECO Unit 2
EM Lock Akses LOKAL Unit 2
Exit Button LOKAL Unit 2
Box Panel Akses LOKAL Unit 1
IP Phone PoE YEALINK Unit 5

Standalone Smoke Detector GFS Unit 13

Pengkabelan
Wifi Access Point ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 2
CCTV ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 6
Titik Data ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 21
Titik Telepon ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 5
Titik IPTV ~ UTP CAT6 + PVC HIC 20mm LS CABLE Ttk 4
Titik Akses ~ STP AWG 18 + PVC HIC 20mm LS CABLE Ttk 4

Testing & Commissioning Data DIGI Ls 1