who depend on the skills learnt at our / 6 GR position and SAW in 1 G position. The training is
available in C. Steel, S. Steel & Aluminium. We also train in
Gas Cutting, Gas Welding & Brazing. DNV & IRS certification
can cut the fuel out, to an unit causing crankcase was thoroughly cleaned of / Cathodic Protection system, together pressure tested and Bulkhead also put Q11. Do you believe that availability Q13. What are your future plans for
problems and it would not produce any Lub Oil, well ventilated, and after taking with welding of large Sacrificial Zinc back and welded. Boiler was recertified. of skilled and trained welder’s the upliftment of the institute?
power, anymore. But that reduces speed all precautions, the cracks were ground Anodes to the ship’s surface. Barnacles One of my learning was - putting better manpower in one among the major We will soon be getting one of the latest
thus increasing the voyage duration and across their length, creating a good “V” is tackled through special paints. Marine maintenance practices in place, so that challenge. Your say. Lincoln Machine, which is a multi-
gives poor combustion as well as poor and welded slowly, without any quick paints is a highly debated subject, as it such fires do not take place. These were - Skilled & trained welder is definitely an process machine as is used for WorldSkills
balancing of load across the engine. As rise in the temperature. Later on DPT was can not only reduce corrosion but also the sootblowing frequency for the section essential resource. In India, even getting Competition. This is an expensive
the Cylinder Head was a huge casting , we carried out satisfactorily. In subsequent help in reducing the frictional resistance was increased, Regular high pressure a Welder’s Qualification Certificate has machine, and is being sponsored by
could not take a chance by welding and sailings, we did not find any cracks. to ship’s movement in seawater. water washing of section started at every become “Manageable”, without actually “MAHINDRA’S” through their CSR activity.
filling up the hole by Cast Iron Electrodes. opportunity, visual inspection windows having the skills. When put to test, these We are Grateful to “MAHINDRA’S”, who
The hole was around 10 mm dia. but at an Q7. You have a vast Shipyard Q9. Could you brief us on an were provided for detection of fire and welders can’t deliver. In many places have always been our strong support.
angle to the shoulder where the injector Experience in Ship repairs (in important ship repair project you high temperature alarms were put inside substandard welding is accepted. This While we are known for our Welding
was seating. We made a copper washer of Drydocks and Ashore) in Mazagaon worked upon? What has been your the boiler casing. Another of my learning may go untreated for India market, Training, we also have excellent facilities
about 3 mm width, annealed it and put Docks Ltd & Scindia Workshops. learning? was the homework and sustained follow but will definitely not be acceptable in for training in Machine shop, Structural/
that before fitting back the Fuel Injector. What type of welding processes When the new generation Diesel engines, up - detailed planning, organising and international market. And as the economy Pipe & Pressure Vessel Fabrication,
The washer created an obstruction, in the are required for ship repair / Ship called super long stroke slow speed getting the repair completed in the grows, this is going to be a challenge for all Scaffolding, Hydroblasting, Electro
flow of exhaust gas. As we increased the building? engines with better materials and higher stipulated time, in association with the of us. technology, PLC/ Hydraulics/ Pneumatics.
load gradually, the complete hole got filled I worked in Shipyard before 1978. In operating parameters were introduced Vendors. The vendors were Japanese For marine training for Engine Room &
up due to carbon as the result of poor those days SMAW was prevalent and around 1987-88, there were Exhaust Gas Shipyard and they are very meticulous. Q12. ‘Safety at work’ is one of the key Deck Department we have large amount
combustion, due to part load. No Welding was almost an exclusive process used. Boilers (Economisers) having three stages considerations. What is Don Bosco of Marine Equipment and a Steering
was required but the hole was sealed But today all processes are being used, with finned tubes (and water / steam Q10. You are also a qualified MaritimeAcademy’s effort towards Simulator. We have good air conditioned
effectively by the Carbon soot with Copper for increased productivity. So we have mixture inside) were introduced. These International Welding Engineer ‘health and safety’? dormitories for 50 persons. Our Workshops
washer as the support. We could complete MIG/MAG, FCAW and SAW processes were High, Medium and Low Steam (IWE) from International Institute of Welding is a “Dangerous” vocation at and Training Yard are large. We are located
the voyage in time. So at times simple being used. Robotic welding has started pressure stages. As the exhaust gas was Welding. Thus, what is you say on the all times. Not only PPE but all essential in heart of Mumbai, with easy access by
ingenious solutions are required for what becoming a norm especially, for repetitive led to funnel, it would heat up H.P., M.P. current welding market scenario in leather and similar material protection road and train.
appears as a large problem. The cylinder welds, in Structures. Welding of Stainless and lastly L.P. stage (7 bar pr.). But by India? for safety, from burning metal/ sparks, In the coming days, we want to put our
head was taken to the engine maker’s Steel tanks etc. has also brought in the time the exhaust gas reached to L.P. As far as the Shipping companies are High intensity and flickering arc light, academy on Social Media. We are always
workshop from Hawaii. GTAW process. We can thus say, all the stage, its own pressure & temperature concerned, the current job market for Grinding and cutting wheels, flying metal checking out the new developments in
processes, which are standard in Heavy used to be quite less. Thus to extract more Welders to join as Seamen, is good. The particles is provided at DBMA and its Welding and Marine fields. Our focus is
Q6. Any challenging project? How Engineering are also used in Ship Repair / heat, the fins spacing was much reduced documentation rules for seamen have usage is compulsory. We have an accident on “Hands On Workshop Skills Training”
did you manage to cope up with the Ship Building. on L. P. section. This resulted in high been simplified and relaxed. Thus many insurance in place for all, but right from the and we will try and take whatever such
same? accumulation of Carbon, resulting in Fires welders are coming to shipping for repair time that we started buying this on annual opportunities.
At another time, we found cracks in Q8. What types of corrosion usually due to incandescent accumulated carbon, teams. As far as the general employment basis, we have not had a single claim so far.
welding near the top of the A Brackets occurs in ship stern? in ports, when the exhaust gas (which scenario in India is concerned, good Closing Message
of the Crankcase of a Large Slow Speed Corrosion, especially near ship’s stern does not support combustion) would welders (especially for S. Steel / Q13. ‘Women in Welding’ is a We will turn 22 years old in April, 2020.
Diesel Engine of a Large Oil Tanker. In is due to the presence of Bronze or stop flowing (Engines on Stop) and the Aluminium) with GMAW, FCAW & GTAW growing trend. How does the We look forward to new avenues in
these engines, the crankcase structure is similar Copper alloy Propeller, which natural draft will still be there. I joined a skills are still getting jobs, may not be in institute motive this initiative? training areas. We have been trusted by
fabricated. The cracks were hairline, but forms a galvanic couple. This together Very Large Oil & Ore Carrier vessel where cities but definitely in industrial areas. It is a welcome trend. So far Mahindra have the industry as a Training Academy, which
across the Weld of horizontal and inclined with presence of seawater and dissolved such a fire had taken place, but luckily it Even in gulf and few other countries, there sent at least 10-12 girls to us for training delivers what is agreed upon, with all the
members. This was a serious issue, but oxygen in seawater is a strong source was noticed in time and extent of damage is a demand for welders with these skills. and they were from different plants. Two dedication, passion for excellence with
one that cannot be handled by ships staff of corrosion. The motion of waves at all was avoided. This entire L. P. section was We all believe the recession is a temporary of them were strong competitors at IIW No Compromise at any time. We turn out
during sailing. We identified, measured times and cavitation due to turning of replaced with a new one, in Japan over phenomenon. If Indian economy really Best Welder competitions at National Highly Skilled Technicians at all levels.
and arrested the cracks at the ends. We propeller can be additional causes. The a period of two days. The new section starts growing, the way we are being told, level and one of them even went to China But we can’t survive and grow without
kept regular watch on them, regarding attachment/ growth of Calcium bearing was prefabricated as the vessel was new there will be a continuously growing to take part in ARC CUP competition. We industry’s support. Let Us Join Hands, to
the increase in their length and number. barnacles (especially in warm tropical and all the drawings were available. welding market. I don’t think Industry are trainers and we cannot employ the raise the Standard of Indian Technicians
Luckily the increase was very slow. After waters when the ship is at stand still) is Shipside Bulkhead Plate was cut and 4.0 will affect India in immediate future. trained women welders – employment is Skills to the International level and even
some 4 months, the Drydocking of the another major worry. The first problem is removed. Old L. P. section, was physically But after 10 years, it may be a different the biggest initiative. But we do give some Beyond!
vessel was due. Once in Drydock, the largely tackled through Impressed Current removed, new section put, installed, scenario. concession in the Basic Training course. “JAI HIND! BHARAT MATA KI JAI!”