You are on page 1of 6
ASRY consul & mab a Shai & Rey 0 50119, Ha aco asi) MECHANICAL DEPARTMENT om oa 1 Fae 178026 emery ww arnt TEST CERTIFICATE PROJECT / VESSEL MAITHILE ‘ORDER NO 202086 ‘TEST ITEM AUXILIARY ENGINE AIR C1 JOB NO 6627 TesrDEscraprion afl pressure tested This isto certify that 02 nos. Auxiliary Engine Alr Coolers were overhauled Pressure test was witnessct!and approved by Superintendent Engineer. TEST MEDIA ‘TEST LOCATION HYDROSTATIC PNEUMATIC a Mechanical Workshop Fresh Water ‘TEST REQUIREMENTS REQUIRED TEST PRESSURE | 4 Bar ‘TEST DATE 21/11/2020 TEST HOLD TIME 30 Minutes AMBIENT TEMPERATURE 25°C TESTING INSTRUMENTS = [GAUGE No Mert [RANGE [ 0-10 ar [EALDATE | 8-Aug-20 [eaLOUE] 7-Awg 21 CHART UNIT Ne cal. DATE [eat Due (sh wan : GRAVITY / LEAR TEST /LEST REMARKS Js Leakage observed : Nill |+Valve seat lifted at desired pressure Test Result: Ey satistactuny Chuwatistactory The test data re} red herein Is as reeurdes! at the time of test, ‘sure test was Approved by signatories below Section Head / ‘Quanity cope} Owner's Representative arge Supervisor ied Basil [Nane: u AX hap | Forint MD/C/DI/REU po No 2 a 5 aavat f 102 Block Na. 128 Dy Dock Hin He Wee of aban a ASRY, CnSUI * va srinoatsng & mopar renee. sey) MECHANICAL DEPARTMENT #2 Gos Fonte gd a Baan eer ern Uvoede CRanigenjestr cama TEST CERTIFICATE PROJECT / VESSEL MAITHILE ORDER NO 202086, TEST ITEM | AUNILIARY ENGINELUBH OWL COOLER #163 JOB No 6032 [This isto eestify that 02 nos. Ar loverhauled and pressure tested Pressure test was witnessed and approved by Superintendent Engineer. ne Lube Oil Coolers were lary Ey “TEST DESCRIPTION ‘TEST MEDIA ‘TEST LOCATION MYDROSTATIC 2] PNEUMATIC oO Mechanical Workshop Fresh Water ‘TEST REQUIREMENTS: REQUIRED TEST PRESSURE 4.5 Bar TEST DATE 21/11/2020 TEST HOLD TIME 30 Minutes: AMBIENT TEMPERATURE 25°C TESTING INSTRUMENTS: TE eawairne Mavi [RANGE] 0-10 Ger [eALDATE | WAugt0 [CAcoun] Tag Dt HART UNIT Ra [CAL DATE cai-pur (LI [SHIP MEANS LI [GRAVITY / LEAK TEST + Leakage observed : Nil, +Valve seat lifted at desired pressure + Test Result: (Elsmisecray ——(] uneeatacery [> The okie reparted herein is as recorded at the time of test. ey) at “Pressure test was Approved by signatories below n econ \]__ Seetion Head ¢ 5 Pe ncn Superior Names Vitgied Basil jwner’s Representative Fawn Na B/E /ONINE a ARaY MECHANICAL DEPARTMENT CONDITION REPORT Tessa Pract ATTN Ole TOE Na | —___ a eET Sob Cnr cor Fal ‘iy verze onl) fob Begalion TRENT AR COOTER Praga oT Bae [20-kov20 | WorkshaptRNa. | 6e2re condition] Siouml_—_—l Conditlonfound: — AftcrDismaniling &¢hemicat ciraniag [Mss etcased Aux Engine Air Cooler #1 Aircooled coves visslly fount stator 2. Air comer end! covers gasket found hardened 02 nos. Airenlerflesexaltuaes fearon choi ‘Yard's Recommendations. Change order required far: Ire Mo: Jar cooler end covet lean earesset up. = 2. Aircoolr and cower ack to reneur YS. — [3.None +. rcooterassesnbed with new gasket & pressure test, — | mee — bee Date | ana vnc ndings /Recommsnulation/ Action Pitecesd. mer Reprcscitative Signe ? c aikz lisa [aidales ‘Answer Received by | Farm Wa aby P/02/ REV aay MECHANICAL DEPARTMENT CONDITION REPORT Vern Proje ANTI Tater Tbe | aT Sub Cracor Far Ray VOTE [aly punta IRERGRE AREBOTER Farag Ta [mike [o-na0 | Worisnop cna | eat [5 founel fe Condition found: Alor Bismaning & Oncol Candas [8s cise il Aus Engine Air Cooler #3 1. Alrcooler enucove viel ound sitter, 2 Aircooler end covers gasket found hardened 02 nos, ‘Alc coser Heroes a sbes free rn chee Yard's Recommendations: ‘Change order required for: item No: eet nt cose ee seems = A cao en cover ashe rene YS” None alr contr assembled with new gasket & pressure test. Criginator: Saari [tae [ie erzo ner iuling:/ssommendatian Astin ner Represtaiative Sign bate: | 1 gjuloeze Amare Boe Sy Vale a Farm Ne. MDyIP/ORREV A ERTS MECHANICAL DEPARTMENT CONDITION REPORT Vesa Wet ATT) Cesar Taw We. | ___ ROROHR TEESE Sub contrctor Fol ‘Nag Vesa [only Job Destin Ti ge abs DV Costar arash ‘en 1-00-00, Taw [ 20-Nevi0 | Warkshop CRNo, | 6baz7 AS found Condision founds —_Disinuoin Chemical Clans onion Se 4 Aus igine Labe OM Cooler # 4 Cooter tubes isnaly foul satisfactory all ue free rom blick & chock }2. Cooler end eerversO rig fom hare & er 2. Cooler ena ores Beans visually ova sasshaetony. Matst’s Recommendations ge order roqruined (ors lor Nas Coa eal evene:O ving to vents, cero retin io dbl rbeanete presse sese” SAVED ASE in Date: [20 —Baisinators =e [ouomes- Filings /Atecoinonendotion ¢ Action Proceed oa emuaie ae awe [glaze or APP PREW ARS MECHANICAL DEPARTMENT CONDITION REPORT Vessel J Project MALTHILE Gitar Fab Wo. aaoe7ee82 Subs Contractor Pat Navy Vistas nip) Job Desgnition ‘Auk Raging Lube Oh Cooler em Dawe _[19-Nov-e0 | Workshop cRNa [663 Paragraph 251-00-001 Condition found; Dismantling & Chemfcal Csaning ‘Aux Engine Late OW Cooler # 3 fawad condition a ——A 1. Cooler tubes visually fonnd satisfactory all tube free from block & chock, Cooler end cavers O ring lound hardened! & deformed. 3. Caer end cavors & casing visually found satisfactory. Yards Recommendations Change order required fo None. &: Coniet end vureryGetng to renew ys. Nowe. Cooler to assembled back with new Oring & shell side & Tube side to pressure test. —~ Gaeaa sana vasEE Dates To Nov 80 [Owner ennsings / Recommendation /Actiss Prreccl =| W ‘Answer Received by Lafnfzoee Forma Ne. MOVAPYODIREV.L

You might also like