TEST CERTIFICATE
PROJECT / VESSEL MAITHILE ‘ORDER NO 202086
‘TEST ITEM AUXILIARY ENGINE AIR C1 JOB NO 6627
TesrDEscraprion afl pressure tested
This isto certify that 02 nos. Auxiliary Engine Alr Coolers were overhauled
Pressure test was witnessct!and approved by Superintendent Engineer.
TEST MEDIA ‘TEST LOCATION
HYDROSTATIC
PNEUMATIC a
Mechanical Workshop
Fresh Water
‘TEST REQUIREMENTS
REQUIRED TEST PRESSURE | 4 Bar ‘TEST DATE 21/11/2020
TEST HOLD TIME 30 Minutes AMBIENT TEMPERATURE 25°C
TESTING INSTRUMENTS
= [GAUGE No Mert [RANGE [ 0-10 ar [EALDATE | 8-Aug-20 [eaLOUE] 7-Awg 21
CHART UNIT Ne cal. DATE [eat Due
(sh wan :
GRAVITY / LEAR TEST
/LEST REMARKS
Js Leakage observed : Nill
|+Valve seat lifted at desired pressure
Test Result:
Ey satistactuny Chuwatistactory
The test data re}
red herein Is as reeurdes! at the time of test,
‘sure test was Approved by signatories below
Section Head / ‘Quanity cope} Owner's Representative
arge Supervisor
ied Basil [Nane: u AX hap |
Forint MD/C/DI/REU
po No 2 a
5 aavat
f
102 Block Na. 128 Dy Dock Hin He Wee of aban aASRY,
CnSUI *
va srinoatsng & mopar renee. sey) MECHANICAL DEPARTMENT
#2 Gos Fonte gd a Baan
eer ern Uvoede
CRanigenjestr cama
TEST CERTIFICATE
PROJECT / VESSEL MAITHILE ORDER NO 202086,
TEST ITEM | AUNILIARY ENGINELUBH OWL COOLER #163 JOB No 6032
[This isto eestify that 02 nos. Ar
loverhauled and pressure tested
Pressure test was witnessed and approved by Superintendent Engineer.
ne Lube Oil Coolers were
lary Ey
“TEST DESCRIPTION
‘TEST MEDIA ‘TEST LOCATION
MYDROSTATIC 2] PNEUMATIC oO
Mechanical Workshop
Fresh Water
‘TEST REQUIREMENTS:
REQUIRED TEST PRESSURE 4.5 Bar TEST DATE 21/11/2020
TEST HOLD TIME 30 Minutes: AMBIENT TEMPERATURE 25°C
TESTING INSTRUMENTS:
TE eawairne Mavi [RANGE] 0-10 Ger [eALDATE | WAugt0 [CAcoun] Tag Dt
HART UNIT Ra [CAL DATE cai-pur
(LI [SHIP MEANS
LI [GRAVITY / LEAK TEST
+ Leakage observed : Nil,
+Valve seat lifted at desired pressure
+ Test Result:
(Elsmisecray ——(] uneeatacery
[> The okie reparted herein is as recorded at the time of test.
ey)
at “Pressure test was Approved by signatories below
n econ \]__ Seetion Head ¢ 5
Pe ncn Superior
Names Vitgied Basil
jwner’s Representative
Fawn Na B/E /ONINE aARaY MECHANICAL DEPARTMENT
CONDITION REPORT
Tessa Pract ATTN Ole TOE Na | —___ a eET
Sob Cnr cor Fal ‘iy verze onl)
fob Begalion TRENT AR COOTER Praga oT
Bae [20-kov20 | WorkshaptRNa. | 6e2re
condition] Siouml_—_—l
Conditlonfound: — AftcrDismaniling &¢hemicat ciraniag [Mss etcased
Aux Engine Air Cooler #1
Aircooled coves visslly fount stator
2. Air comer end! covers gasket found hardened 02 nos.
Airenlerflesexaltuaes fearon choi
‘Yard's Recommendations. Change order required far: Ire Mo:
Jar cooler end covet lean earesset up. =
2. Aircoolr and cower ack to reneur YS. —
[3.None
+. rcooterassesnbed with new gasket & pressure test, —
| mee — bee Date | ana
vnc ndings /Recommsnulation/ Action
Pitecesd.
mer Reprcscitative Signe
? c aikz lisa [aidales
‘Answer Received by |
Farm Wa aby P/02/ REVaay
MECHANICAL DEPARTMENT
CONDITION REPORT
Vern Proje ANTI Tater Tbe | aT
Sub Cracor Far Ray VOTE [aly
punta IRERGRE AREBOTER Farag Ta
[mike [o-na0 | Worisnop cna | eat
[5 founel fe
Condition found: Alor Bismaning & Oncol Candas [8s cise il
Aus Engine Air Cooler #3
1. Alrcooler enucove viel ound sitter,
2 Aircooler end covers gasket found hardened 02 nos,
‘Alc coser Heroes a sbes free rn chee
Yard's Recommendations: ‘Change order required for: item No:
eet nt cose ee seems =
A cao en cover ashe rene YS”
None
alr contr assembled with new gasket & pressure test.
Criginator: Saari [tae [ie erzo
ner iuling:/ssommendatian Astin
ner Represtaiative Sign
bate: | 1 gjuloeze
Amare Boe Sy Vale a
Farm Ne. MDyIP/ORREV AERTS MECHANICAL DEPARTMENT
CONDITION REPORT
Vesa Wet ATT) Cesar Taw We. | ___ ROROHR TEESE
Sub contrctor Fol ‘Nag Vesa [only
Job Destin Ti ge abs DV Costar arash ‘en
1-00-00,
Taw [ 20-Nevi0 | Warkshop CRNo, | 6baz7
AS found
Condision founds —_Disinuoin Chemical Clans onion Se 4
Aus igine Labe OM Cooler # 4
Cooter tubes isnaly foul satisfactory all ue free rom blick & chock
}2. Cooler end eerversO rig fom hare & er
2. Cooler ena ores Beans visually ova sasshaetony.
Matst’s Recommendations ge order roqruined (ors lor Nas
Coa eal evene:O ving to vents,
cero retin io dbl rbeanete presse sese”
SAVED ASE
in Date: [20
—Baisinators =e
[ouomes- Filings /Atecoinonendotion ¢ Action
Proceed
oa emuaie ae awe [glaze
or APP PREWARS MECHANICAL DEPARTMENT
CONDITION REPORT
Vessel J Project MALTHILE
Gitar Fab Wo.
aaoe7ee82
Subs Contractor Pat
Navy Vistas nip)
Job Desgnition ‘Auk Raging Lube Oh Cooler
em
Dawe _[19-Nov-e0 | Workshop cRNa [663
Paragraph
251-00-001
Condition found; Dismantling & Chemfcal Csaning
‘Aux Engine Late OW Cooler # 3
fawad
condition a ——A
1. Cooler tubes visually fonnd satisfactory all tube free from block & chock,
Cooler end cavers O ring lound hardened! & deformed.
3. Caer end cavors & casing visually found satisfactory.
Yards Recommendations Change order required fo
None.
&: Coniet end vureryGetng to renew ys.
Nowe.
Cooler to assembled back with new Oring & shell side & Tube side to pressure test. —~
Gaeaa sana vasEE
Dates
To Nov 80
[Owner ennsings / Recommendation /Actiss
Prreccl
=| W
‘Answer Received by
Lafnfzoee
Forma Ne. MOVAPYODIREV.L