Task 6-4 Business Profile Work Center xx960 is staffed by newly hired personnel. You estimate for the next month that because of training and the learning curve the total available hours for production is reduced by one hour a day. The supervisor for this work center estimates that the Guided Task Average Efficiency will be 70% rather than 80%.
Figure 6-1: Viewing the Relationship Between Efficiency Values and
Average Capacity
Task Statement (6-4)
In this exercise you change the Average Efficiency rating to view the impact on the Average Capacity. Then you change the Load Percentage to view the impact on Average Capacity.
Task Component Viewing the relationship between Average Efficiency and Average Capacity requires two components:
1. Change the values.
2. Exit then re-enter the application to see the results. 3. Return the values back to their original settings.
Navigation Path to Work Center Maintenance
Before you start the exercises, navigate again to CAP100. Change the Values - Component 1 Based on your input in the previous tasks, the values display as:
You Input BPCS Calculates These Values
Average Efficiency 80 Available Capacity 6.78 Load Percentage 100 Standard Speed 40 # of Shifts 1 Hours per Shift 7.5 Number of Machines 1 Machine Speed Factor 1.13
1. Type 70 as the Average Efficiency.
The other values remain the same.
Exit, then Re-enter the Window to See the Results -
Component 2 1. Press Enter three times to navigate through all windows. Stop at the Selection (CAP100D1-01) window. 2. Type 2 in the Act column. 3. Type xx960. The table below illustrates the changes that display. Notice the Available Capacity is less than you had before.
You Input BPCS Calculates These Values
Average Efficiency 70 Available Capacity 5.93 Load Percentage 100 Standard Speed 40 # of Shifts 1 Hours per Shift 7.5 Number of Machines 1 Machine Speed Factor 1.13
Adding machines, hours per shift, number of shifts will all
impact the average capacity calculation. Return the Values Back to Their Original Settings - Component 3 For temporary changes to Average Efficiency or Load Percentages, you rarely want to make these changes in the Work Center Master. After all the changes are temporary, and it is too easy to forget to go back in and change the values to their traditional settings. Instead, temporary changes should be made in the Shop Floor Calendar.