Professional Documents
Culture Documents
(Task)
The output from detail capacity planning is load profile. This load profile
displays future capacity requirements during the capacity planning horizon.
Periods are displayed based on the user input time frames.
Guided Task
Figure 15-1: Viewing the Load Against Work Centers (Slide)
Task Components
Viewing the load against a work center requires only one component—type
11 in front of your work Center.
W/C 3960 + Time Frame M + Fac 03 Horizon 12/31/99 Cur Load .00
Load SETUP+RUN DLP 100.00 Eff 80.00 Last Gen 3/24/99 Tot Load .00
200 RRRRRR
186 RRRRRR
171 RRRRRR
157 RRRRRR RRRRRR RRRRRR
143 RRRRRR ++++++ ++++++
129 RRRRRR ++++++ ++++++ ++++++
114 RRRRRR ++++++ ++++++ ++++++
100 RRRRRR ++++++ ++++++ ++++++
86 RRRRRR ++++++ ++++++ ++++++
71 RRRRRR ++++++ ++++++ ++++++
57 RRRRRR ++++++ ++++++ ++++++
43 RRRRRR RRRRRR ++++++ ++++++ ++++++
29 ++++++ ++++++ ++++++ ++++++ ++++++
14 ++++++ ++++++ ++++++ ++++++ ++++++
200 13 44 151 166 149
3/27/99 4/03/99 4/10/99 4/17/99 5/17/99 6/16/99 7/16/99 8/15/99
Capacity 31 30 30 138 149 149 136
F1=Help F3=Exit F4=Prompt F5=Refresh F12=Cancel F24=More Keys
Work center xx960 is shut down for a week. How does this
display?
7. Keep this window open (for your work center) as your instructor
lectures on work center capacity.