Viewing the Load Against Work Centers

(Task)
The output from detail capacity planning is load profile. This load profile
displays future capacity requirements during the capacity planning horizon.
Periods are displayed based on the user input time frames.

Task 15-4 Business Profile


Following the business profile,
you evaluate load profile for
work center xx960

Guided Task
Figure 15-1: Viewing the Load Against Work Centers (Slide)

Task Statement (15-4)


The purpose of this exercise is to lead you through viewing the load against
work centers.

Task Components
Viewing the load against a work center requires only one component—type
11 in front of your work Center.

Navigation Path to Capacity Requirements


The following is the navigation path to use before you start the exercises:

BPCS Main menu  CAP menu  Capacity Requirements (or CAP300)

Type 11 for Your Work Center - Component 1


1. Use the Navigation Path to start this exercise.
2. Type 11 in the Act column.
11 is the code for Profile mode.
3. Type xx for the Fac.
4. Type xx960 for the WrkCtr.
5. Type M as the Code.
6. Press Enter.
The Capacity Requirements window displays.
 The R symbol in the figure below indicates the overload of
capacity, which probably displays in red, depending on your
monitor settings. Load profiles may vary slightly. A five-day
workshop’s profile may be slightly different than a three-day
workshop’s profile. For example, the window below was
generated on the same day that the demand was input into the
system.

CAP300D-02 *** BPCS COURSEWARE ENVIRONMENT ***


DORAL Capacity Requirements USER_ID 11:19:37

W/C 3960 + Time Frame M + Fac 03 Horizon 12/31/99 Cur Load .00
Load SETUP+RUN DLP 100.00 Eff 80.00 Last Gen 3/24/99 Tot Load .00
200 RRRRRR
186 RRRRRR
171 RRRRRR
157 RRRRRR RRRRRR RRRRRR
143 RRRRRR ++++++ ++++++
129 RRRRRR ++++++ ++++++ ++++++
114 RRRRRR ++++++ ++++++ ++++++
100 RRRRRR ++++++ ++++++ ++++++
86 RRRRRR ++++++ ++++++ ++++++
71 RRRRRR ++++++ ++++++ ++++++
57 RRRRRR ++++++ ++++++ ++++++
43 RRRRRR RRRRRR ++++++ ++++++ ++++++
29 ++++++ ++++++ ++++++ ++++++ ++++++
14 ++++++ ++++++ ++++++ ++++++ ++++++
200 13 44 151 166 149
3/27/99 4/03/99 4/10/99 4/17/99 5/17/99 6/16/99 7/16/99 8/15/99
Capacity 31 30 30 138 149 149 136
F1=Help F3=Exit F4=Prompt F5=Refresh F12=Cancel F24=More Keys

Figure 15-2: Capacity Requirements window

 Work center xx960 is shut down for a week. How does this
display?

7. Keep this window open (for your work center) as your instructor
lectures on work center capacity.