C.

The boiler flue system shall be factory fabricated complete with all required fittings and
accessories including full range of starting components, lengths, tees, elbows, load
bearing components, flashings and terminals necessary to complete the system. The
load bearing and wind load capacity of all components when installed within a system
shall be determined by the manufacturer in accordance with the applicable codes and
design the system accordingly. When required the manufacturer shall submit relevant
calculations and test reports of above to the Engineer.

D. The inner wall/liner, fitting and all surfaces in contact with flue gases shall be
constructed of Grade 304 stainless steel to BS 1449 Part 2, not less than 1 mm wall
thickness. The outer casing for interior use shall be of aluminized steel to BS 1449 Part
1 and for exterior use shall be of Grade 304 stainless steel to BS 1449 Part 2.

E. Insulation: Insulation shall be mineral fiber, thickness and density as recommended by


manufacturer for particular application.

2.5 FIRE SHUT-OFF VALVES AND FUSIBLE LINK EQUIPMENT

A. Provide a fire shut-off valve and fusible link system as shown on the drawings. The
shut-off valve system shall be complete with a manual knock off bottom arrangement.

Provide interface with connections for BMS. The fusible link system shall consist of a
cable system complete with fusible link mounted over boiler burner.

2.6 STORAGE CALORIFIERS HEAT EXCHANGER for Domestic Hot Water Supply

A. Refer to Section 221116 – DOMESTIC WATER PIPING.

2.7 VALVES:

A. Valves shall be as specified in Section 220523 - GENERAL DUTY VALVES FOR


PLUMBING PIPING.

2.8 PIPE INSULATION:

A. Insulation of hot water pipes shall be as per requirements of Section 220719 -


PLUMBING PIPING AND EQUIPMENT INSULATION

2.9 PIPE HANGERS AND SUPPORTS:

A. Refer to Section 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING

2.10 FUEL OIL SYSTEM:

A. Refer to Section 231113 - FACILITY FUEL OIL SYSTEM.

PART 3 - EXECUTION

3.1 PIPING

A. General: Comply with the requirements of Section 220500 - COMMON WORK


RESULTS FOR PLUMBING and boiler manufacturers written recommendations.

Holiday Inn Hotel and Suites 235214 - 9 Hot Water Boiler


J17-03600
B. Hot Water Piping, 2 inches (DN 50) and Smaller: Schedule 80 black steel pipe, with
threaded joints using Class 125 cast-iron threaded fittings.

C. Hot Water Piping, 2-1/2 inches (DN 65) and Larger: Schedule 80 black steel pipe, with
welded joints using Schedule 80 wrought-steel welding fittings and Class 150 wrought-
steel flanges.

D. Install unions in piping 2 inches (DN 50) and smaller adjacent to each valve, at final
connections of each piece of equipment, and elsewhere as indicated.

E. Install flanges in piping 2-1/2 inches (DN 65) and larger at final connections of each
piece of equipment and elsewhere as indicated.

F. Install all required fittings and accessories as shown on drawings or as applicable to


make the system fully functional.

G. Insulate all piping complying with the requirements of Section 220719 - Plumbing
PIPING AND EQUIPMENT INSULATION.

H. Anchor piping for proper direction of expansion and contraction.

3.2 EXAMINATION

A. Examine area to receive boiler for compliance with requirements for installation
tolerances and other conditions affecting boiler performance. Do not proceed with
installation until unsatisfactory conditions have been corrected.

3.3 BOILER INSTALLATION

A. Install boilers level and plumb, according to manufacturer's written instructions and
referenced standards.

B. Support boilers on 100-mm- thick concrete base, 100 mm larger on each side than
base of unit, unless indicated otherwise on drawings.

C. Assemble units and parts shipped loose or disassembled.

D. Install electrical devices furnished with boiler, but not specified to be factory mounted.

3.4 CONNECTIONS

A. Connect piping as shown drawings.

3.5 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to


supervise the field assembly of components and installation of boilers, including

piping and electrical connections. Test and adjust controls and safeties. Replace
damaged and malfunctioning controls and equipment.

B. Hydrostatically test assembled boiler and piping, according to applicable sections of


the ASME Boiler and Pressure Vessel Code.

C. Perform all tests in the presence of the Engineer. Report results in writing to the
Engineer.

Holiday Inn Hotel and Suites 235214 - 10 Hot Water Boiler