You are on page 1of 4

D9T TRACK-TYPE TRACTOR TWG00001-UP (MACHINE) PO... https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?retu...

Welcome: j210akw
Product: TRACK-TYPE TRACTOR
Model: D9T TRACK-TYPE TRACTOR TWG
Configuration: D9T TRACK-TYPE TRACTOR TWG00001-UP (MACHINE)
POWERED BY C18 Engine

Disassembly and Assembly


D9T Track-Type Tractor Power Train
Media Number -UENR0031-01 Publication Date -01/03/2015 Date Updated -04/03/2015

i02207976

Front Track Roller Frame - Remove


SMCS - 4151-011-FR

Removal Procedure
Table 1
Required Tools

Tool Part Number Part Description Qty

A FT-2223 Strap 1

4C-6486 Stand 1

8S-7621 Tube 1
B
8S-8048 Saddle 1

8S-7615 Pin 1

8B-7548 Push-Puller Tool Gp 1

5P-4808 Cap 1

0S-1601 Bolt 2
C
8S-9089 Bolt 2

5P-8245 Hard Washer 2

5P-8247 Hard Washer 4

D 1U-9200 Lever Puller Hoist 1

E 8T-5071 Seal Guard 1

1. Loosen the track. Refer to Operation and Maintenance Manual, "Track - Check/Adjust".

1 of 4 4/26/2018, 3:53 PM
D9T TRACK-TYPE TRACTOR TWG00001-UP (MACHINE) PO... https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?retu...

Illustration 1 g01107219

2. Position suitable cribbing (1) under the track so that suitable cribbing (1) is under the first track roller on rear
track roller frame (2). Install Tooling (A). Position Tooling (B) under the blade. Lower the blade onto
Tooling (B). Separate track (3) .

Illustration 2 g01107522

3. Remove plug (7) and drain the oil from rear track roller frame (2) into a suitable container for storage or
disposal. Remove bolts (4) and cover (5) from both sides of rear track roller frame (2). Remove O-ring seal
(6) that is located under cover (5) .

2 of 4 4/26/2018, 3:53 PM
D9T TRACK-TYPE TRACTOR TWG00001-UP (MACHINE) PO... https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?retu...

Illustration 3 g01107689

4. Use Tooling (C) in order to remove guide assembly (8) from both sides of rear track roller frame (2) .

Illustration 4 g01107767

5. Attach a suitable lifting device onto front track roller frame (9). Position a suitable chain around front track
roller frame (9). Attach Tooling (D) onto the chain. Carefully move front track roller frame (9) approximately
51 mm (2.0 inch) away from rear track roller frame (2). Use Tooling (E) in order to protect the seals in rear
track roller frame (2). You will need to cut Tooling (E) to length.

3 of 4 4/26/2018, 3:53 PM
D9T TRACK-TYPE TRACTOR TWG00001-UP (MACHINE) PO... https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?retu...

Illustration 5 g01107793

6. Attach a suitable lifting device and Tooling (D) in order to support the rear of front track roller frame (9).
The weight of front track roller frame (9) is approximately 1565 kg (3450 lb). Remove front track roller
frame (9) from rear track roller frame (2) .

Illustration 6 g00770832

7. If necessary, remove retaining ring (13), seal (12), retaining ring (11), and bearing (10) .

Copyright 1993 - 2018 Caterpillar Inc. Thu Apr 26 2018 15:53:15 GMT+0800 (Malay Peninsula Standard Time)
All Rights Reserved.
j210akw
Private Network For SIS Licensees.

4 of 4 4/26/2018, 3:53 PM

You might also like