1675 725 550 3440 550 725 725 550 3440 550 725
B
12mm ISOLATION JOINT
- C
-
10mm ISOLATION JOINT 10mm ISOLATION JOINT
AGAINST PLINTH AGAINST PLINTH
1500
2235
750
A A
735
735
1675 1200 1130 1330 1130 1200 1620 1620 1200 1130 1330 1130 1200 1520
19300
BUND WALL CONCRETE LAYOUT
SCALE 1:50
18420
1675 725 550 3440 550 725 3250 725 550 3440 550 725 1520
EXISTING
560
1
NEW -
R16-02 DOWELS AT 200 c/c
710
500 400 300
A
500 400
35200
1200
-
900
HILTI-HIT RE-500 OR SIMILAR KUNISEAL OR SIMILAR APPROVED WATER STOP
2400
APPROVED SLEEVE COMPOUND SEAL PLACED ALL AROUND WHERE NEW CONCRETE
SECTION A GET INTO CONTACT WITH EXISTING SURFACES
1:50 -
550
650 200 650
1425 200 375 CONCRETE NOTES
50
3440
1. CONCRETE CONSTRUCTION SHALL BE PERFORMED TO SANS 2001-CC1
30
DRILLED AND EPOXY BARS 200mm LONG 2. ALL CONCRETE SHALL BE 30 MPa AT 28 DAYS U.O.N.
R16-02 @ 200c/c
3. BLINDING CONCRETE TO BE MINIMUM 10 MPa
400
4. ALL EXPOSED CORNERS TO HAVE 25mm CHAMFER
370
550
900
70
5. ALL REINFORCEMENT TO HAVE (UNLESS STATED OTHERWISE):-
900
500
360
50mm COVER - BASES AND CONCRETE IN CONTACT WITH THE GROUND
200
30mm COVER - R.C. WALL
585
500
70
6. ALL REINFORCEMENT TO LAP WITH MIN 50 DIAMETERS U.O.N.
4700
200
70
7. REINFORCEMENT DIMENSIONS ARE ACCORDING TO SANS 282
ROUGHEN SURFACE TO
EXPOSE AGGREGATE 8. ALL CONCRETE SHALL BE PROPERLY CURED FOR AT LEAST 7 DAYS U.O.N.
9. FINISHES ON CONCRETE FLOOR MUST CONFORM TO SANS 10109-2:2013
DOWEL SLEEVES WITH HILTI-HIT
70 180 250 250 250 250 180 70 RE-500 OR SIMILAR APPROVED 10. AT LEAST 6 CONCRETE TEST CUBES MUST BE SAMPLED FROM EACH TRUCK OF READY
550
SLEEVE COMPOUND MIX FOR TESTING (3 FOR CRUSHING AT 7 DAYS AND 3 FOR CRUSHING AT 28 DAYS)
750 750
1525 475 11. THE CONTRACTOR SHALL ENSURE THAT ALL REINFORCEMENT IS PROPERLY HELD IN
1500
2000 POSITION AND SHALL ALSO MAINTAIN THE CORRECT CONCRETE COVER UTILIZING
3440
14. ALL EXPOSED SURFACES OF THE NEW CONCRETE WALL AND BASES TO BE COATED
400
16140
900
BUND WALL CONCRETE LAYOUT
500
SCALE 1:100
REFERENCE DRAWINGS APPROVER: Q.M.S CHECKING SYSTEM No. 11 MALOKIBA INDUSTRIAL PARK
SCALE
BUND WALL REINFORCEMENT LAYOUT NAME: 1 BRUNEL ROAD
RE-MP-21070-STR-002
DRAWN BY: SB SOHUMA EVANDER, MPUMALANGA
DRAWING No.
Pr. No. 2280 PROPOSED BUND WALL
DRAWING CHECK: G TLAAMELA RE-MP-21070-STR-001
P.O. Box 3211
For: ROBUST CONSULTING SECUNDA EVANDER, MPUMALANGA
ENGINEERS (PTY) LTD DRAWING REVIEW: M WAYITI 2302 CLIENT DRAWING No.
BUND WALL CONCRETE
Revisions