You are on page 1of 13

5/8/2017 Method 

Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

Login / Register
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER

Lopol.org
Custom Search Search

 
 

Sponsored
Electrical Panel Control Panel Electrical Test Electrical Cables House Electrical

Method Statement For Installation of Electrical DB, SMDB
 

and MDB Panelboards

Sponsored
Electrical Cables House Electrical Electrical Wiring

We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 1/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

Method Statement For Installation of DB, SMDB and MDB.
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER

1. Introduction and Scope
This statement is written for the purpose of establishing method and procedures for the Installation of DB, SMDB and MDB.

 
 

We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 2/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

2. Applicable Projects Specification
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER
Section: SWITCHBOARD DISTRIBUTION PANELS AND MCCs. 
Division: INSTALLATION 
Sub Division: Subdivision

 
3. Location of Activity
 
Low Voltage Room and Electrical Rooms

4. Health and Safety Hazards
Specific safety measures have to follow as applicable, and all the safety measures are covered separately in the project safety plan.

5. Operation
1. Materials: Materials used will be as per the material submittal approved by the engineer and will be as per the approved drawings
in coordination with other services.
2. Storage / Protection: DB, SMDB, and MDB and Accessories shall be unloaded with care to avoid any damages. If they are
shipped in packs or pallets, each pack of pallet shall be lifted individually with suitable lifting equipment. Every precaution shall be
taken to preserve their cleanliness before installation. Store in accordance with manufacturer’s instructions, Properly protected
 
from construction activities and weather conditions.
3. Installation:
a. To make sure that the entire installation is in conformance and in accordance with the design intent of the project for the
Electrical and Low Voltage System in addition to the specification and as per approved shop drawings and comply.
b. with local and International Standards.
c. All the switchboards shall be fabricated at the manufacturer’s works.
d. Before beginning installation in any area, examine all parts of the adjoining works into which applicable work is to be placed.
Should any condition be found which will prevent the proper execution of the work, installation shall not proceed in that area
until such conditions are corrected by the contractor.
We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 3/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

e. Fix all equipment independently of wiring system. Use cadmium of zinc electroplated bolts, nuts, washers and screw.
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER
f. Mount single DB at 1800mm from finish floor level to top of equipment, unless shown otherwise on drawing / schedules.
g. Ensures that clearance in front of switchgear is not less than 1m, or as indicated.
h. Number terminals, cables and component parts to correspond with manufacturer have certified drawings.
i. Terminate PVC, SWA PVC and MICS cables inside enclosure by securing cables to switchboards with gland bracket; and
enclosure with glanding plates or fabricated steel extension boxes.  
 
j. For flush installation, DB’s all conductors shall terminate behind the board in an adaptable box. For surface mounting, trunking
shall be fixed between the board and ceiling or floor level, or conduit run directly into Trunking which prevent correct
installation of the Trunking lid. Adequate earth continuity shall be made between the various components.

6. Responsibilities
1. Project Manager
a. To ensure that all the preparation and application works are carried out according to the Contract Specification.
b. To ensure that the progressing of works is carried out according to the planned program and as per the approved method
statement.
c. To ensure that all equipment and material required executing the work are available according to the planned Construction
Programme.
 
d. To co­ordinate with the Main Contractor, MEP co­coordinator, and Safety Officer for a safe and proper execution of the works.
2. Site Engineer
a. To ensure that the works are carried out according to the Contract Specifications approved method statement.
b. To provide all necessary information and distribute responsibilities to his construction team.
c. To monitor the progress of work in relation with the work program and to report to the Project Manager.
d. To co­ordinate with the safety officer and to ensure that the works are carried out in safe practicing methods.
3. Foreman
a. The foreman will carry out his duties by maintaining continuous coordination with the site engineer on daily basis, and ensure
proper distribution of the workforce in the required and planned locations.
We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 4/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

b. To ensure that his assistant foreman/ charge hand are aware of the job requirements and they have enough information to carry
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER
out their duties properly.
c. To ensure in consultation with the site engineer that the manpower involved in the works are moving as agreed and planned for
the work.
d. To ensure that the daily work is progressing as planned and advise the Site Engineer for any requirement of the additional
resources.  
e. To control disposal of waste materials to the instructions received from the site engineer.  
f. To ensure full coordination with the safety officer to maintain safe working and proper house keeping of the site, following the
approved safety measures and further ensure that all his working team are aware of the same to prevent accident and losses.
g. After completion of works, Foreman shall inform the site engineer for inspection of works.
h. Distribution and the control of materials shall be monitored by foreman and storekeeper.
4. Safety Engineer
a. Ensure the implementation of all the safety measures in accordance with the HSE plan and everybody aware of it for it’s proper
implementation.
b. Ensure all the implemented safety measures are adequate to maintain safe working on the site.
c. Inspect all the site activities and train the person to prevent accidents and it’s proper implementation.
d. Ensure that the site is maintained clean and tidy.
 

7. Manpower Required
Charge hand and Experienced Technicians

8. Materials Requirements
DB, SMDB, MDB and accessories

9. Equipments Requirement
The equipment that will be engaged for Installation of DB, SMDB and MDB works will be as follows:
OK, I agree   No, give me more info
We use cookies on this site to enhance your user experience
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 5/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

1. Wire cutters
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER
2. Measuring tape
3. Drill machine
4. Wooden hammer
5. Flat file
6. Screw drivers  
7. Open and box spanners  
8. Crimping tool

10. Health and Safety
Strictly follow as per the manufacturer’s Health and Safety recommendations for handling and use of the materials. Ensure all
involved personal shall be aware of the same.

11. Supporting Documentation
This method Statement should be read in conjunction with the below referenced documentations.

ITP for Anti – termite Treatment
Insulation Resistance and continuity Test Report  

12. Distribution
Copy of this method statement shall be issued to the following for information/ action/ comments:

1. Project Manager
2. Site Engineer
3. Foremen

13. Inspection And Test Plan For Installation of DB, SMDB and MDB
We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 6/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

ITP Inspection Type of Inspection Reference Testing Requirement/ Acceptance Verifying / Control


HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER
Clause Description Document Criteria Data Forms
No

Design drawings,
Design and Review of Design Authorities
1 All the Drawings  
Drawings Documents Drawings Departments
 
Requirements.

Approved
Review of Should be as per the approved drawing and Submittals
2 Material Approval Drawing and
Documents Specification Documents
Specification

Visual, Insulation
Check Switchgear Approved Properlocation installation, termination etc
Resistance and Approved Drawing
3 installation and Method Material should have minimum status of –
Continuity Method Statement
cable terminations. Statement NO Objection with comments
TestReport

Visual, Insulation
Request for
Resistance and Approved No obstructions Level, and it is in proper  
4 inspection of Approved Drawings
Continuity Test Drawing position
works
report.

Tags

Method Statement
Electrical Engineering
Construction Engineering
Electrical Installation
We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
Electrical SMDB Installation
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 7/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

Wiring Method
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER

‹ Method Statement For Installation Of Galvanized up Method Statement For The Installation Of Power and
Conduits On Exposed Surface Lighting System Wiring ›

 
Add New Comment
 

Related Posts To Method Statement:

Method Statement For Method Statement For The Method Statement For  


Installation Of Galvanized Installation Of Power and Installation Of Electric PVC
Conduits On Exposed Surface Lighting System Wiring Conduits And Accessories

We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 8/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER

 
 

Method Statement For
Installation Of Cable Tray Or
Trunking
Recommend Tweet Share

Sponsored Content

Electrical Installation

House Electrical Wiring
We use cookies on this site to enhance your user experience  
OK, I agree No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 9/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER

Register

Login
 
Recent Comments
 

We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 10/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER

 
 

We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 11/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER

Construction Control Guidelines for...

 
 
Latest Content
Agriculture Fisheries Loan
Agricultural Term Loans (ATL)
Download Form 12BB PDF to Claim Employee's Tax Exemptions / Benefits
NFSA Ration Card Categories ­ Antyodaya (AYY), Priority (PHH), Non­Priority (NPHH), State Priority
Sanchaya Online Payment Procedure for Local Self Govt. (LSG), Kerala ­ Building Property Tax / Fee

Today's popular
Changing Bank Account for LPG Subsidy ­ Online Method
MEP Specifications For Building Construction  
Indian Passport Fee Structure ­ Fresh (New) and Renewal (Re­issue)
SBI Pradhan Mantri Mudra Yojana (PMMY) Scheme for Collateral Free Bank Loan
SBI Housing Loan and Documents Required

Recent comments
Doctor Plus Loan for BUMS Doctor
1 week 4 days ago
RML in Bangalore
We use cookies on this site to enhance your user experience
1 month 8 hours ago OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 12/13
5/8/2017 Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards | Lopol.org

Sir,
HOME BANKING TECHNOLOGY MEP ELECTRIC TIPS ASK TO ANSWER
1 month 13 hours ago
RML Revaluation
1 month 14 hours ago
Query regarding my RML amount payment
1 month 1 day ago  
 
Try Out
Types of Construction contracts: Lumpsum contract
SBI SME Supply Chain Loan For Vendors and Dealers
Soil Survey And Calculations for Electrical Earthing or Grounding...
Construction Quality Plan Of Building ­ Documentation And Records
Construction Quality Plan Of Building ­ Procurement Procedure

Google+ || Facebook.com

© 2017. Lopol.org. All Rights Reserved.  

We use cookies on this site to enhance your user experience
OK, I agree   No, give me more info
By clicking any link on this page you are giving your consent for us to set cookies.

https://www.lopol.org/article/method­statement­for­installation­of­electrical­db­smdb­and­mdb­panelboards 13/13

You might also like