You are on page 1of 27

INSPECTION AND TEST PLAN

Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/01 Rev.:0 Pages :1-2
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: CONDUIT, JUNCTION BOX AND SEALING FITTINGS INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE
1 Material Receiving
1.1 Material handled carefully and a) Electrical
properly. specification Product Labels & Contractor QC Material
MRK-15-01 N/A R/M S S Visual
b) Manufacture's Name plate details Rep.
instruction

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical
Product Labels &
requirements. Record and Specification
report all discrepancies and Name plate Contractor QC Material
MRK-13-01 N/A W S W Visual
damage immediately. details/c)MRK/PRO/S Rep.
TO/006

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Contractor QC Material
sunlight exposure. MRK-15-01 product Labels N/A R/M S S Visual
b) Manufacture's Rep.
instruction

2.0 Conduit, junction box and sealing fittings installation


2.1 Conduit Installation above ground
Installation of angle SAES-P-104, NEC Contractor QC Electrical
bar/channel supports. MRK-WI-07 & MRK-WI-001 310/346/348/370-16. SATIP-P-104-05 Inspector N/A W S W Visual
a.
Installation of RGS PVC Contractor QC Electrical
SAES-P-104, NEC SATIP-P-104-05
coated/RGS conduits and MRK-WI-07 & MRK-WI-001 Inspector N/A H S H Visual
b. 310/346/348/370-16. SAIC-P-3321
fittings.
Bonding jumpers for conduit Contractor QC Electrical
bushing with earth clamp SAES-P-104, NEC SATIP-P-104-05 Inspector
MRK-WI-07 & MRK-WI-001 N/A W S W Visual
310/346/348/370-16. SAIC-P-3321
c. connectors.
Boundary seals installation and SAES-P-104, NEC Contractor QC Electrical
SATIP-P-104-05
low point drain. MRK-WI-07 & MRK-WI-001 310/346/348/370-16. Inspector N/A H S H Visual
SAIC-P-3321
d.
2.2 Fixing of supports for junction b Contractor QC Electrical
SAES-P-104, NEC
MRK-WI-07 & MRK-WI-001 MRK/QC/052 Inspector N/A M S W Visual
310/346/348/370-16.

2.3 Fixing of junction boxes, pull


MRK-WI-07 & MRK-WI-001
SAES-P-104, NEC
MRK/QC/052
Contractor QC Electrical
N/A M S W Visual
boxes. 310/346/348/370-16. Inspector

2.4 Conduit Installation under ground


Trenching excavation depth Contractor QC Electrical
a. MRK-WI-07 & MRK-WI-001 SAES-A-114 SATIP-P-104-07 Inspector N/A W S W Visual

Installation of conduit stub-up SAES-P-104, NEC Contractor QC Electrical


SATIP-P-104-07
support and fittings. MRK-WI-07 & MRK-WI-001 Inspector N/A H S H Visual
SAIC-P-3333
b. 310/346/348/370-16.
Installation of PVC/RGS
conduits reinforce steel duct SAES-P-104, NEC SATIP-P-104-07 Contractor QC Electrical
c. banks, bell ends and bushing. MRK-WI-07 & MRK-WI-001
310/346/348/370-16. SAIC-P-3333 Inspector
N/A W S W Visual

Spare ducts/sleeves and


SAES-P-104, NEC SATIP-P-104-07 Contractor QC Electrical
d. permanent plug installation. MRK-WI-07 & MRK-WI-001
310/346/348/370-16. SAIC-P-3333 Inspector
N/A W S W Visual

Direct buried PVC/RGS PVC


SAES-P-104, NEC SATIP-P-104-07 Contractor QC Electrical
e. coated conduits installation MRK-WI-07 & MRK-WI-001
310/346/348/370-16. SAIC-P-3331 Inspector
N/A W S W Visual
clearances.
Cable entry in ducts sealed
SAES-P-104, NEC SATIP-P-104-07 Contractor QC Electrical
f. with sealing foam. MRK-WI-07 & MRK-WI-001
310/346/348/370-16 SAIC-P-3331 Inspector
N/A H S W Visual

INSPECTION AND TEST PLAN


Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/01 Rev.:0 Pages :2-2
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: CONDUIT, JUNCTION BOX AND SEALING FITTINGS INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
Cable entry in RGS PVC SAES-P-104,
SATIP-P-104-07 Contractor QC Electrical
g. coated stub-ups entering bldg. MRK-WI-07 & MRK-WI-003 NEC 10/346/348/370-
SAIC-P-3331 Inspector
N/A H S W Visual
sealed with fire retardant 16.
sealant.
3.0 Conduit Sealing Fitting
3.1 Installation MRK-SWP-002 SAES-P-104, SATIP-P-104-05 Contractor QC Electrical N/A M S W Visual
NEC Inspector
310/346/348/370-16
3.1.1 SAES-P-104, NEC
310/346/348/370-16, Contractor QC Electrical
Fixing of seal fitting MRK-SWP-002 SAIC-P-3209 N/A M S W Visual
Art. 501-5 & 15-SAIP- Inspector
50

3.2 Cable dressing and separation


MRK-SWP-002
SAES-P-104,
SAIC-P-3209
Contractor QC Electrical
N/A M S W Visual
of conductors. NEC-310/346-348 Inspector

3.2.1 Filling with sealing compound MRK-SWP-002 SAES-P-104 SAIC-P-3209 Contractor QC Electrical N/A H S W Visual
Inspector
3.2.2 15-SAIP-50, NEC- Contractor QC Electrical
Seal fitting properly located. MRK-SWP-002 Art. 501-5 & SAES-P- SAIC-P-3209 Inspector N/A H S W Visual
111

3.2.3 Area classification drawings 15-SAIP-50, NEC- Contractor QC Electrical


checked for seal fitting MRK-SWP-002 Art. 501-5 & SAES-P- SAIC-P-3209 Inspector N/A M S W Visual
requirements. 104.

3.2.4 Contractor QC Electrical


Final inspection MRK-SWP-002 SAES-P-104 SAIC-P-3209 N/A M S W Visual
Inspector

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/02 Rev.:0 Pages : 1-1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: GROUNDING INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS
QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. DESCRIPTIO QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
ACTIVITY CRITERIA DOCUMENT CONTRACTOR inspection
N
CODE CODE CODE CODE

1.0 Material Receiving


1.1 Material handled carefully and a) Electrical
properly. specification Product Labels & Contractor QC Material
MRK-15-01 N/A R/M S S Visual
b) Manufacture's Name plate details Rep.
instruction

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical Product Labels &
requirements. Record and Specification Name plate Contractor QC Material
report all discrepancies and MRK-13-01 N/A R/M S W Visual
details/c)MRK/PRO/S Rep.
damage immediately. TO/006

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Contractor QC Material
sunlight exposure. MRK-15-01 product Labels N/A R/M S S Visual
b) Manufacture's Rep.
instruction

2.0 Grounding Cable


Installation SAES-P-104, NEC Contractor QC Electrical
2.1 MRK-WI-07
310/346/348/370-16
SATIP-P-111-01
Inspector
N/A M S W Visual

Trenches Contractor QC Electrical


2.2 MRK-WI-07 AD-036874 Sh-1 SATIP-P-111-01
Inspector
N/A W W H Visual

Ground rod installation, ground


Contractor QC Electrical
2.3. grid cad weld prior to backfill. MRK-WI-07 AD-036383 Sh-2,10,12 SAIC-P-3713
Inspector
N/A H W H Visual

Ground connection to Contractor QC Electrical


2.4 equipments.
MRK-WI-07 DD-950022 SATIP-P-111-01
Inspector
N/A W W H Visual

Ground connection to panel Contractor QC Electrical


2.5 boards.
MRK-WI-07 AD-036383, Sh-7 SATIP-P-111-01
Inspector
N/A M W H Visual

Ground connection to light Contractor QC Electrical


2.6 poles.
MRK-WI-07 AD-036383, Sh-7 SATIP-P-111-01
Inspector
N/A M W H Visual

Ground connection to fence. Contractor QC Electrical


2.7 MRK-WI-07 AD-036383, Sh-3 SATIP-P-111-01
Inspector
N/A M W H Visual

Ground connections to cable Contractor QC Electrical


2.8 trays
MRK-WI-07 AD-036383, Sh-8 SATIP-P-111-01
Inspector
N/A M W H Visual

Ground testing and reading SAES-P-111 & DD- Contractor QC Electrical


2.9 records.
MRK-WI-07
950022
SATIP-P-111-01
Inspector
N/A W W H Testing

Installation of grounding cables


Contractor QC Electrical
2.10 to equipments and local grids. MRK/WI/07 Vendor Specs.NEC-250 SATIP-P-111-01
Inspector
N/A M/W S W Visual

Size of grounding grid Contractor QC Electrical


2.11 conductor checked.
MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01
Inspector
N/A M S W Visual

Verification of the size of


Contractor QC Electrical
2.12 equipment grounding MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01
Inspector
N/A M S W Visual
conductor.
Grounding conductor run with Contractor QC Electrical
2.13 power conductors. MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01
Inspector
N/A W S W Visual

Conduit and cable tray properly Contractor QC Electrical


2.14 grounded.
MRK/WI/07 SAES-P-111/ NEC-250 SATIP-P-111-01
Inspector
N/A W S W Visual

Final inspection Contractor QC Electrical


2.15 MRK/QC/07 SAES-P-111/ NEC-250 SATIP-P-111-01
Inspector
N/A M S H Visual
LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/03 Rev.:0 Page : 1 of 1
Dt.:Nov.'06

BI NO./JO: 10-03563 Description: CABLE TRAYS Discipline: Electrical


CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING RESPONSIBILIT SUB- Method of
ITEM NO. QC PROC. REF. MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT Y CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material Receiving


1.1 Material handled carefully and a) Electrical Contractor QC
MRK-15-01 Product Labels N/A R/M S S Visual
properly. specification Electrical Inspector
Check all materials received a) Purchase Order
for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels Contractor QC
1.2 report all discrepancies and MRK-13-01 c) NEMA-VE-1 /MRK/PRO/STO/006 Electrical Inspector
N/A R/M S W Visual
damage immediately.

Store all items in a safe place a) Electrical


Contractor QC
1.3 free from dust and direct MRK-15-01 specification Product Labels
Electrical Inspector
N/A R/M S S Visual
sunlight exposure.

2.0 Cable Trays SAES-P-104


Installation NEMA-VE-2 Contractor QC
2.1 MRK-WI-07 & MRK-SWP-001 SATIP-P-104-03
Electrical Inspector
N/A M S W Visual

Installation of cable tray


supports and associated SAES-P-104,
Contractor QC
2.2 hardware's. MRK-WI-07 & MRK-SWP-001 NEC310/346/348/370 SAIC-P-3307
Electrical Inspector
N/A W W W Visual
-16/NEMA VE-2

Installation of cable trays and


fittings per NEMA Latest std. SAES-P-104,
Contractor QC
2.3 MRK-WI-07 & MRK-SWP-001 NEC310/346/348/370 SAIC-P-3307
Electrical Inspector
N/A W W W Visual
-16/NEMA VE-2

Cable tray properly grounded. Contractor QC


2.4 MRK-WI-07 & MRK-SWP-001 SAES-P-111 SAIC-P-3307
Electrical Inspector
N/A M S H Visual
SAES-P-104
Final inspection prior to cable NEMA-VE-2 Contractor QC
2.5 pulling MRK-WI-07 & MRK-SWP-001 SAIC-P-3307
Electrical Inspector
N/A H S W Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/04 Rev.:0 Page : 1-2
Dt.:16 Mar-05
BI NO./JO: 10-03563 Description: CABLES AND WIRES Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITERIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material
Material handled carefully and a) Electrical Contractor QC Electrical
1.1 properly.
MRK-15-01
specification
Product Labels
Inspector
N/A R/M S S Visual

Check all materials received a) Purchase Order


for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels Contractor QC Electrical
1.2 report all discrepancies and MRK-13-01
/MRK/PRO/STO/006 Inspector
N/A R/M S W Visual
damage immediately.

Store all items in a safe place a) Electrical


Contractor QC Electrical
1.3 free from dust and direct MRK-15-01 specification Product Labels
Inspector
N/A R/M S M Visual
sunlight exposure.

2.0 Cable Laying


As per AD036874 Contractor QC Electrical
2.1 Under ground cable laying MRK-WI-07
Sh-1 , SAES-P-104
SATIP-P-104-01
Inspector
N/A W S W Visual

AD-036874 Sh-1 Contractor QC Electrical


2.1.1 Cable trenches. MRK-WI-07
and SAES-P-104
SATIP-P-104-01
Inspector
N/A M S W Visual

Trench preparation AD-036874 Sh-1 Contractor QC Electrical


2.1.2 MRK-WI-07
and SAES-P-104
SATIP-P-104-01
Inspector
N/A M S w Visual

Sand bedding for direct buried AD-036874 Sh-1 Contractor QC Electrical


2.1.3 cables duct.
MRK-WI-07
and SAES-P-104
SATIP-P-104-01
Inspector
N/A M S W Visual

Installation of conduit for AD-036874 Sh-1 Contractor QC Electrical


2.1.4 direct/encased buried ducts.
MRK-WI-07
and SAES-P-104
SATIP-P-104-01
Inspector
N/A W S W Visual

Concrete works for encased AD-036874 Sh-1 Contractor QC Electrical


2.1.5 buried ducts.
MRK-WI-07
and SAES-P-104
SATIP-P-104-01
Inspector
N/A M W W/H Visual

Contractor QC Electrical
2.1.6 Cleaning of ducts. MRK-WI-07 SAES-P-104 SATIP-P-104-01
Inspector
N/A W S W Visual

Contractor QC Electrical
2.1.7 Cable pulling MRK-WI-07 SAES-P-104 SAIC-P-3207
Inspector
N/A M W W/H Visual

Sand cover of direct buried Contractor QC Electrical


2.1.8 cables and ducts.
MRK-WI-07 AD-036874 Sh-1 SATIP-P-104-01
Inspector
N/A W S W Visual

Laying of red tile and warning Contractor QC Electrical


2.1.9 tape.
MRK-WI-07 AD-036874 Sh-1 MRK/TEC/QAD/041
Inspector
N/A W S W Visual

Megger test of LV/Control Contractor QC Electrical


2.1.10 cables.
MRK-WI-07 15-SAMSS-502 SAIC-P-3207
Inspector
N/A M W H Test

Termination of LV/Control Contractor QC Electrical


2.1.11 cables.
MRK-WI-07 SAES-P-104 SAIC-P-3207
Inspector
N/A M W W/H Visual

Installation of above ground SAES-P-104, Contractor QC Electrical


2.1.12 cable markers.
MRK-WI-07
AB-036273
SATIP-P-104-01
Inspector
N/A M S W Visual

The top layer of concrete


SAES-P-104, AD- Contractor QC Electrical
2.1.13 encased conduits is marked MRK-WI-07
036874 Sh-1
MRK/QAD/056
Inspector
N/A M S W Visual
with red dye.
Bell end or protective bushings SAES-P-104,
Contractor QC Electrical
2.1.14 provided on each duct where it MRK-WI-07 AD-036874 MRK/QAD/047 & 56
Inspector
N/A W S W Visual
terminates. Sh-1
Final Inspection Contractor QC Electrical
2.1.15 MRK-WI-07 AD-036874 Sh-1 MRK/QAD/056
Inspector
N/A M W W/H Visual
INSPECTION AND TEST PLAN
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY Document No. :
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/04 Rev.:0
Dt.:16 Mar-05
Page : 2 of 2

BI NO./JO: 10-03563 Description: CABLES AND WIRES Discipline: Electrical


CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY

PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB-


ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS Remarks
DESCRIPTION ACTIVITY CRITERIA DOCUMENT CONTRACTOR

CODE CODE CODE CODE

2.2 Above Ground Cable Laying


Fixing of rigid steel conduit
SAES-P-104, Contractor QC Electrical
2.2.1 /PVC coated rigid steel MRK-WI-07
C-318/346
SATIP-P-104-01
Inspector
N/A W S W Visual
conduit.
Installation of cable trays Contractor QC Electrical
2.2.2 MRK-WI-07 SAES-P-104 SAIC-P-3207
Inspector
N/A M S W Visual

Megger test of cables Contractor QC Electrical


2.2.3 MRK-WI-07 SAES-P-104 SAIC-P-3207
Inspector
N/A M S W Test

Cable pulling Contractor QC Electrical


2.2.4 MRK-WI-07 SAES-P-104 SAIC-P-3207
Inspector
N/A M S W Visual

Cable dressing Contractor QC Electrical


2.2.5 MRK-WI-07 SAES-P-104 SAIC-P-3207
Inspector
N/A M S W Visual

Megger test of LV/Control Contractor QC Electrical


2.2.6 cables.
MRK-WI-07 SAES-P-104 SAIC-P-3207
Inspector
N/A W S W Visual

Termination of LV Control Contractor QC Electrical


2.2.7 cables.
MRK-WI-07 SAES-P-104 SATIP-P-104-01
Inspector
N/A M S W Visual

Conduit properly installed prior Contractor QC Electrical


2.2.8 to cable pulling.
MRK-WI-07 SAES-P-104 SATIP-P-104-05
Inspector
N/A M S W Visual

Conduit completely installed Contractor QC Electrical


2.2.9 prior to cable pulling.
MRK-WI-07 SAES-P-104 SATIP-P-104-05
Inspector
N/A M S W Visual

Conduit cleared of rubble. Contractor QC Electrical


2.2.10 MRK-WI-07 SAES-P-104 SATIP-P-104-05
Inspector
N/A W S W Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/05 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: CABLE PULLING AND INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Pre-Installation
1.1 Check trench to be free of
water, rocks, and enough a) SAES-P-104 a) Drawing
Contractor QC Electrical
depth. MRK-SWP-001, 003 & WI-07 b) Construction b) procedure N/A R/M S W Visual
Inspector
specification c) Inspection Forms

1.2 Sand bedding and sweet rock


a) SAES-P-104 a) Drawing
should be free of rocks and Contractor QC Electrical
having a depth at least 150mm MRK-SWP-001, 003 & WI-07 b) Construction b) procedure N/A R/M S W Visual
Inspector
. specification c) Inspection Forms

1.3 Meggering of the cables. a) SAES-P-104 a) Drawing


Contractor QC Electrical
MRK-SWP-001 & WI-07/08 b) Construction b) procedure N/A R/M S W Test
Inspector
specification c) Inspection Forms

2.0 Cable Laying


Pulling/laying of the cables
a) SAES-P-104
SATIP-P-101-01 Contractor QC Electrical
2.1 MRK-SWP-001, 003 & WI-07 b) Construction
SAIC-P-3207 Inspector
N/A M S W Visual
specification

Sand cushion at least 300mm a) SAES-P-104


(clean sand) hand compaction. Contractor QC Electrical
2.2 MRK-SWP-001, 003 & WI-07 b) Construction SATIP-P-104-01
Inspector
N/A W S W Visual
specification

Laying of red tiles and warning a) SAES-P-104


tapes. Contractor QC Electrical
2.3 MRK-SWP-001, 003 & WI-07 b) Construction SATIP-P-104-01
Inspector
N/A W S W Visual
specification

3.0 Cable Termination


Preparation of cables a) SAES-P-104
Contractor QC Electrical
3.1 MRK-SWP-001, 003 & WI-07 b) Construction SATIP-P-104-01
Inspector
N/A W S W Visual
specification

Cable lugs technical a) SAES-P-104


specification MRK-SWP-001, WI-07 & Contractor QC Electrical
3.2 Vendor specifications
b) Construction SATIP-P-104-01
Inspector
N/A W S W Visual
specification

Bolt torquing Tightening Test a) SAES-P-104 a) Drawing


Contractor QC Electrical
3.3 MRK-SWP-001, 003 & WI-07 b) Construction b) procedure
Inspector
N/A W W H Test
specification c) Torque Report

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/06 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: FIRE ALARM SYSTEM Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITERIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material Receiving


1.1 Material handled carefully and a) Electrical
properly. specification Product Labels & Contractor QC Material
MRK-15-01 N/A R/M S S Visual
b) Manufacture's Name plate details Rep.
instruction

1.2 Check all materials received for a) Purchase Order


conformance to all standard b) Electrical
requirements. Record and Specification Product Labels & Contractor QC Material
report all discrepancies and MRK-13-01 N/A R/M S W Visual
Name plate details Rep.
damage immediately.

1.3 Store all items in a safe place a) Electrical


free from dust and direct
specification Contractor QC Material
sunlight exposure. MRK-15-01 product Labels N/A R/M S S Visual
b) Manufacture's Rep.
instruction

2.0 Fire Alarm


Manufacturer data and SAES-B-014, NEC- Contractor QC Electrical
2.1 submittal
MRK-08-01
760
NMR Details
Inspector
N/A R/M S W

Receiving inspection SAES-B-014, NEC- Contractor QC Electrical


2.2 MRK-10-01
760
RFI/MTC/MRIR
Inspector
N/A R/M S W Visual

Fixing Conduits SAES-P-104, SAES-B- Contractor QC Electrical


2.3 MRK-WI-07 & SWP-02&03
014
MRK/QAD/044
Inspector
N/A M S W Visual

Wire pulling SAES-P-104, SAES-B- Contractor QC Electrical


2.3.1 MRK-WI-07 & SWP-02&03
014
MRK/QAD/050
Inspector
N/A M S W Visual

Fixing of devices SAES-P-104, SAES-B- Contractor QC Electrical


2.3.2 MRK-WI-07 & SWP-02&03
014
MRK/QC/059
Inspector
N/A M S W Visual

Termination of wires SAES-P-104, SAES-B- Contractor QC Electrical


2.3.3 MRK-WI-07 & SWP-02&03
014
MRK/QAD/057
Inspector
N/A M S W Visual

Testing Contractor QC Electrical


2.3.4 MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/050 N/A M S H Test
Inspector
All equipment properly Contractor QC Electrical
2.3.5 MRK-WI-07 & SWP-02&03 SAES-P-111 MRK/QAD/049 N/A M S W Visual
grounded Inspector
Torque all bolts within units. Contractor QC Electrical
2.3.6 MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/091 N/A M S W Test
Inspector
All equipment properly Contractor QC Electrical
2.3.7 MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/059 N/A M S W Visual
identified and labeled. Inspector
Functional testing of fire alarm Contractor QC Electrical
2.3.8 MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/059 N/A H H Test
system. Inspector
Inspection. Contractor QC Electrical
2.3.9 MRK-WI-07 & SWP-02&03 SAES-P-104 MRK/QAD/059
Inspector
N/A H S H Visual

conduct testing and


commissioning of the complete VENDOR TEST
Contractor QC Electrical
fire protection system. MRK-WI-07 & SWP-02&03 SAES-B-019 PROCEDURE/REPO N/A H S W Test
Inspector
RT/MRK/QAD/059
2.3.10
• Perform testing and
Contractor QC Electrical
commissioning of all fire MRK-WI-07 & SWP-02&03 SAES-B-019 MRK/QAD/059 N/A H S H Test
Inspector
2.3.11 extinguishing system.
Install fire protection and SAES-B-070/SAES-B- Contractor QC Electrical
2..3.12 detection system
MRK-WI-07 & SWP-02/03
107
MRK/QAD/059
Inspector
N/A H S W Visual
LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/07 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: PANEL BOARDS & UPS POWER PANEL, LOW VOLTAGE PANEL BOARDS Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material Receiving


1.1 Material handled carefully and a) Electrical
properly. specification
Product Labels & Contractor QC Material
MRK-15-01 b) Manufacture's N/A R/M S S Visual
Name plate details Rep.
instruction
c)16-SAMSS-518

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels & Contractor QC Material
report all discrepancies and MRK-13-01 c)16-SAMSS-518 N/A R/M S W Visual
Name plate details Rep.
damage immediately. d)NEMA PB-1

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification
sunlight exposure. Contractor QC Material
MRK-15-01 b) Manufacture's product Labels N/A R/M S S Visual
Rep.
instruction
c)16-SAMSS-518

2.0 MOV & UPS Power Panel & Low Voltage Panel Boards
Manufacturer data and
submittal NMR Details/technical
Contractor QC Electrical
2.1 MRK-08-01 SAES-P-104, NEC-384 specs./SATIP-P-116-
Inspector
N/A M S W Visual
07

Receiving inspection NMR Details &


16-SAMSS-518/SAES- Contractor QC Electrical
2.2 MRK-10-01
P-104, NEC-384
technical specs.
Inspector
N/A M S W Visual
/MRIR

Installation Contractor QC Electrical


2.3 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST
Inspector
N/A M S W Visual

Fixing Supports Contractor QC Electrical


2.3.1 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST
Inspector
N/A M S W Visual

Installation of panel boards. Contractor QC Electrical


2.3.2 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST
Inspector
N/A M S W Visual

Termination of wires. Contractor QC Electrical


2.3.3 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST
Inspector
N/A W S W Visual

Megger Test Contractor QC Electrical


2.3.4 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST
Inspector
N/A M S W Test

Panel properly grounded. Contractor QC Electrical


2.3.5 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST
Inspector
N/A M S W Visual

Connections tightened with Contractor QC Electrical


2.3.6 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S H Visual
torque wrench. Inspector
Panel properly labeled. Contractor QC Electrical
2.3.7 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A M S W Visual
Inspector
Panel circuit directly properly Contractor QC Electrical
2.3.8 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A W S W Visual
filled in. Inspector
install 125 VDC distribution
SAES-P-104/ARAMCO Contractor QC Electrical
panel MRK-WI-07, SWP-02& 03 S.A. CHECKLIST N/A W S W Visual
approved drwg. Inspector
2.3.9
Final Inspection Contractor QC Electrical
2.3.10 MRK-WI-07, SWP-02& 03 SAES-P-104 S.A. CHECKLIST N/A W S W Visual
Inspector
LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/08 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: INTERIOR/EXTERIOR(TASK AREA LIGHTING) LIGHTING FIXTURES AND WIRING DEVICES Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material Receiving


1.1 Material handled carefully and a) Electrical
properly. specification Product Labels & Contractor QC Material
MRK-15-01 N/A R/M S W Visual
b) Manufacture's Name plate details Rep.
instruction

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels & Contractor QC Material
report all discrepancies and MRK-13-01 N/A R/M S W Visual
Name plate details Rep.
damage immediately.

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Contractor QC Material
sunlight exposure. MRK-15-01 product Labels N/A R/M S W Visual
b) Manufacture's Rep.
instruction

2.0 Lighting Fixtures


Manufacturer data and SAES-P-123, SAES-P- NMR Details & Contractor QC Electrical
2.1 submittal MRK-08-01
104, NEC-410. technical specs. Inspector N/A M S W Visual

Receiving inspection SAES-P-123, SAES-P- NMR Details & Contractor QC Electrical


2.2 MRK-10-01
104, NEC-410. technical specs. Inspector N/A M S W Visual

Installation SAES-P-123/Vendor Contractor QC Electrical


2.3 MRK-WI-07 & SWP-002
Standard
MRK/QC/061
Inspector
N/A M S W Visual

Fixing lighting fixtures and SAES-P-123/SAES-P- Contractor QC Electrical


2.3.1 connections. MRK-WI-07 & SWP-002
104
SATIP-P-123-01
Inspector
N/A M S W Visual

Fixing devices and connection SAES-P-123/SAES-P- Contractor QC Electrical


2.3.2 MRK-WI-07 & SWP-002
104
SATIP-P-123-01
Inspector
N/A M S W Visual

Megger test SAES-P-123/SAES-P- Contractor QC Electrical


2.3.3 MRK-WI-07 & SWP-002
104
SATIP-P-123-01
Inspector
N/A M S W Visual

Install outdoor Illumination level check of


lighting pole with indoor lighting inspection. SAES-P-123/SAES-P- Contractor QC Electrical
2.3.4 MRK-WI-07 & SWP-002
104
SATR-P-3610
Inspector
N/A H S H Visual
250W HPS

Install Lighting and receptacles SAES-P-123/SAES-P- Contractor QC Electrical


2.3.5 for the new tank MRK-WI-07 & SWP-002
104
SATIP-P-123-01
Inspector
N/A H S W Visual

Install stairway lighting SAES-P-123/SAES-P- Contractor QC Electrical


2.3.6 MRK-WI-07 & SWP-002
104
SATIP-P-123-01
Inspector
N/A H S W Visual

Final Inspection SAES-P-123/SAES-P- Contractor QC Electrical


2.3.7 MRK-WI-07 & SWP-002
104
SATIP-P-123-01
Inspector
N/A H S H Visual

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/09 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: MOLDED CASE CIRCUIT BREAKER Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITERIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material
1.1 Material handled carefully and a) Electrical
properly. specification Product Labels & Contractor QC Material
MRK-15-01 N/A R/M S S Visual
b) Manufacture's Name plate details Rep.
instruction

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels & Contractor QC Material
report all discrepancies and MRK-13-01 N/A W S W Visual
Name plate details Rep.
damage immediately.

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Contractor QC Material
sunlight exposure. MRK-15-01 product Labels N/A R/M S S Visual
b) Manufacture's Rep.
instruction

2.0 Molded Case Circuit Breaker


Manufacturer data and Contractor QC Electrical
SAES-P-123, SAES-P- NMR Details &
2.1 submittal MRK-08-01
104, NEC-410. technical specs.
Inspector N/A W S W Review

Receiving inspection Contractor QC Electrical


SAES-P-123, SAES-P- NMR Details &
2.2 MRK-10-01
104, NEC-410. technical specs.
Inspector N/A W S W Visual

Installation Contractor QC Electrical


2.3 MRK-WI-07 & SWP-002 Vendor Standard MRK/QC/063
Inspector
N/A W S W Visual

Breaker properly grounded


Contractor QC Electrical
2.3.1 MRK-WI-07 & SWP-002 SAES-P-111 MRK/QC/049
Inspector
N/A W S W Visual

Connections tightened with Contractor QC Electrical


2.3.2 torque wrench.
MRK-WI-07 & SWP-002 SAES-P-104 MRK/QC/063
Inspector
N/A W S W Test

Breaker properly labeled Contractor QC Electrical


2.3.3 MRK-WI-07 & SWP-002 SAES-P-104 MRK/QC/063
Inspector
N/A W S W Visual

Conduct overcurrent trip test,


Contractor QC Electrical
2.3.4 contact resistance test and MRK-WI-07 & SWP-002 SAES-P-104 PRE-COM-006
Inspector
N/A W S H Visual
megger test.
Modification fo MCC-RB1/RB2 project drawings./SAES-
Project Quality Plan/MRK- Contractor QC Electrical
2.3.5 & Installation of new breakers
SWP-001
O-107, SAES-O-108, MRK/QC/063
Inspector
N/A W S W Test
SAES-O-109, SAES-O-
110
Final Inspection Contractor QC Electrical
2.3.6 MRK-WI-07 & SWP-002 SAES-P-104 MRK/QC/063
Inspector
N/A H S W Test

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH
CLIENT: Saudi Aramco REFINERY AND MARINE AREA, PHASE-1
ITP/EW/10 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: BATTERY SYSTEM Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANC VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY E CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material
1.1 Material handled carefully and a) Electrical
properly. specification Product Labels & Contractor QC Material
MRK-15-01 b) N/A R/M S S Visual
Name plate details Rep.
Manufacture's
instruction
1.2 Check all materials received a) Purchase Order
for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels & Contractor QC Material
report all discrepancies and MRK-13-01 c) 17-SAMSS- N/A W S W Visual
Name plate details Rep.
damage immediately. S71

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Contractor QC Material
sunlight exposure. MRK-15-01 b) product Labels N/A R/M S S Visual
Rep.
Manufacture's
instruction
2.0 Batteries
Manufacturer data and Contractor QC Electrical
2.1 submittal MRK-08-01 SAES-P-103 SATIP-P-103-01 Inspector N/A M S R Review

Receiving inspection Contractor QC Electrical


2.2 MRK-10-01 SAES-P-103 SATIP-P-103-01 Inspector N/A M S W Visual

Installation
Contractor QC Electrical
2.3 MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01
Inspector
N/A M S W Visual

Termination of cables/ wires. Contractor QC Electrical


2.3.1 MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A W W W Visual
Inspector
Test of battery and system Contractor QC Electrical
2.3.2 MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A H W H Test
Inspector
Torque all bolts within units. Contractor QC Electrical
2.3.3 MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A W W W Test
Inspector
All equipment properly Contractor QC Electrical
2.3.4 MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A W W W Visual
identified and labeled. Inspector
Grounding of all units. Contractor QC Electrical
2.3.5 MRK-WI-07, SWP-002&003 SAES-P-111 SATIP-P-103-01 N/A W W W Visual
Inspector
Inspection Contractor QC Electrical
2.4 MRK-WI-07, SWP-002&003 SAES-P-103 SATIP-P-103-01 N/A M W W Visual
Inspector

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/11 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: Uninterruptible Power Supply (UPS) Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material Receiving


1.1 Material handled carefully and a) Electrical
properly. specification Product Labels & Contractor QC Material
MRK-15-01 N/A R/M S W Visual
b) Manufacture's Name plate details Rep.
instruction

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels & Contractor QC Material
report all discrepancies and MRK-13-01 c) 17-SAMSS-518 N/A W S W Visual
Name plate details Rep.
damage immediately.

1.3 Store all items in a safe place a) Electrical


Contractor QC Material
free from dust and direct MRK-15-01 specification product Labels N/A R/M S W Visual
sunlight exposure. b) Manufacture's Rep.
instruction
2.0 UPS
Manufacturer data and SATIP-P-103-01/ NMR Contractor QC Electrical
submittal 17-SAMSS-514, Inspector
2.1 MRK-08-01
SAES-P-103
Details & technical N/A R/M W W Review
specs.

Receiving inspection 17-SAMSS-514, NMR Details & Contractor QC Electrical


2.2 MRK-10-01
SAES-P-103 technical specs. Inspector N/A W W W Visual

Installation NMR Details & Contractor QC Electrical


2.3 MRK-WI-07, SWP-002&003 SAES-P-103
technical specs. Inspector
N/A W S W Visual

Termination of cables/ wires.


NMR Details & Contractor QC Electrical
2.3.1 MRK-WI-07, SWP-002&003 SAES-P-103
technical specs. Inspector
N/A W W W Visual

Megger testing
Contractor QC Electrical
2.3.2 MRK-WI-07, SWP-002&003 SAES-P-104 S.A. CHECKLIST
Inspector
N/A H W W Test

Test of battery and system Contractor QC Electrical


2.3.3 MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST
Inspector
N/A H W W Test

Torque all bolts within units. Contractor QC Electrical


2.3.4 MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST
Inspector
N/A W W W Test

All equipment properly Contractor QC Electrical


2.3.5 MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST N/A W W W Visual
identified and labeled. Inspector
Grounding of all units. Contractor QC Electrical
2.3.6 MRK-WI-07, SWP-002&003 SAES-P-111 S.A. CHECKLIST N/A W W W Visual
Inspector
Inspection Contractor QC Electrical
2.4 MRK-WI-07, SWP-002&003 SAES-P-103 S.A. CHECKLIST
Inspector
N/A W W W Visual
LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/12 Rev.:0 Page : 1 of 1
Dt.:16 Mar-05
BI NO./JO: 10-03563 Description: CATHODIC PROTECTION SYSTEM FOR PLANT FACILITIES & BURIED PIPES Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITERIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material
1.1 Material handled carefully and a) Electrical
properly. specification Product Labels &
b) Manufacture's Name plate details/Mt. Contractor QC Material
MRK-15-01 H R/M S S
instruction Receiving Inspection Rep.
C)17-SAMSS- Report/Catalogues
006/008/017 Visual

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical Product Labels &
requirements. Record and Specification Name plate details/Mt. Contractor QC Material
report all discrepancies and MRK-13-01 C)17-SAMSS- H R/M S W
Receiving Inspection Rep.
damage immediately. 006/008/017 Report/Catalogues
Visual

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Product Labels &
sunlight exposure. b) Manufacture's Name plate details/Mt. Contractor QC Material
MRK-15-01 N/A R/M S S
instruction Receiving Inspection Rep.
c)17-SAMSS- Report/Catalogues
006/008/017 Visual

2 Cathodic protection system for plant facilities


Installation of cathodic SAES-X-500,SAES- Third party
Vendor approved Contractor QC Electrical
2.1 protection system for plant
Procedure/SAEP
X-600/Aramco report/SATIP-X-600-
Inspector
H W S H
facilities approved Drg. 02 Visual
Final inspection SAES-X-500,SAES- Third party
Vendor approved Contractor QC Electrical
2.2 Procedure/SAEP
X-600/Aramco report/SATIP-X-600-
Inspector
H H W H
approved Drg. 02 Test

3 Cathodic protection system for buried pipes


3.1 Installation of cathodic
SAES-X-400/Aramco Third party
protection system buried SAEP-332/SAEP-333/Vendor Contractor QC Electrical
pipeline approved Drg./GI- report/SATIP-X-600- H W S W
approved Procedure/SAEP Inspector
428.001 02
Visual

3.2 Installation of Cathodic


protection for short segment SAES-X-400/Aramco Third party
SAEP-332/SAEP-333/Vendor Contractor QC Electrical
buried pipes & fire hydrants approved Drg./GI- report/SATIP-X-600- H W S W
approved Procedure/SAEP Inspector
428.001 02
Visual
Pre-commissioning
SAES-X-400/Aramco Third party
SAEP-332/SAEP-333/Vendor Contractor QC Electrical
approved Drg./GI- report/SATIP-X-600- H H W H
approved Procedure/SAEP Inspector
428.001 02
3.3 Test

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

Note: 1.All vendor related works records will be prepared & submitted by Saudi Aramco approved Vendor
2. Above activities shall be done & monitored by aramco approved inspector
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/13 Rev.:0 Page : 1 of 4
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: MOTORS/GENERATOR SETS INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material
1.1 Material handled carefully and
a) Electrical
properly. Product Labels &
specification
Name plate details/Mt. Contractor QC Material
MRK-15-01 b) Manufacture's N/A R/M S W Visual
Receiving Inspection Rep.
instruction
Report/Catalogues
c)17-SAMSS-503

1.2 Check all materials received


for conformance to all standard a) Purchase Order Product Labels &
requirements. Record and b) Electrical Name plate tails/Mt. Contractor QC Material
MRK-13-01 N/A R/M S W Visual
report Specification Receiving Inspection Rep.
c)17-SAMSS-503 Report/Catalogues

1.3 Store all items in a safe place


a) Electrical
free from dust and direct Product Labels &
sunlight exposure. specification
Name plate details/Mt. Contractor QC Material
MRK-15-01 b) Manufacture's N/A R/M S W Visual
Receiving Inspection Rep.
instruction
Report/Catalogues
c17-SAMSS-503

2 Motor/Generator Installation
Installation of all motors SAES-P-113,SEAS-P-
rated 480V below and up to Motor Installation Contractor QC Electrical
2.1 & including 185KW (250Hp)
Project Quality Plan 114/Aramco approved
Checklist Inspector
N/A W S W Visual
Drg.

Installation of Motors rated


less than 0.746 kW (1 HP) NEMA MG 1 /SAES-
P-113,SEAS-P- Motor Installation Contractor QC Electrical
2.2 Project Quality Plan
114/Aramco approved Checklist Inspector
N/A W S W Visual
Drg.

Install pump motors for oily SAES-P-113,SAES-P-


Motor Installation Contractor QC Electrical
2.3 water lift stations Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011
Install power/control cables
from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.3.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.3.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

Install motors for storm SAES-P-113,SAES-P-


Motor Installation Contractor QC Electrical
2.4 water pumps. Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011
Install power/control cables
from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.4.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.4.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/13 Rev.:0 Page : 2 of 4
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: MOTORS/GENERATOR SETS INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
Install motors for sludge SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.5 pumps. Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011
Install power/control cables
from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.5.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.5.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

Install motors for API oil SAES-P-113,SAES-P-


Motor Installation Contractor QC Electrical
2.6 pumps. Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011
Install power/control cables
from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.6.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.6.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

Install motors for filtered


feed pumps. SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.7 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.7.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.7.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of


work) SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.8 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.8.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.8.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of SAES-P-113,SAES-P-


work) Motor Installation Contractor QC Electrical
2.9 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/13 Rev.:0 Page : 3 of 4
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: MOTORS/GENERATOR SETS INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.9.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.9.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of SAES-P-113,SAES-P-


work) Motor Installation Contractor QC Electrical
2.10 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.10.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.10.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of


SAES-P-113,SAES-P-
work) Motor Installation Contractor QC Electrical
2.11 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.11.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.11.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of SAES-P-113,SAES-P-


work) Motor Installation Contractor QC Electrical
2.12 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.12.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.12.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of SAES-P-113,SAES-P-


work) Motor Installation Contractor QC Electrical
2.13 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011
Install power/control cables
from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.13.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

INSPECTION AND TEST PLAN


Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/13 Rev.:0 Page : 4 of 4
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: MOTORS/GENERATOR SETS INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.13.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of


SAES-P-113,SAES-P-
work) Motor Installation Contractor QC Electrical
2.14 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.14.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.14.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

as per para. 7.1.3.5 (scope of


SAES-P-113,SAES-P-
work) Motor Installation Contractor QC Electrical
2.15 Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
444701sht001-011

Install power/control cables


from s/s RB to new and SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.15.1 interconnection wiring to new Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
local control station. 444701sht001-011

Conduct pre-
commissioning(Insulation SAES-P-113,SAES-P-
Motor Installation Contractor QC Electrical
2.15.2 Resistance and Functional Project Quality Plan 114/VA-
Checklist Inspector
N/A W S W Visual
Testing SATR-P-3407) 444701sht001-011

Final inspection SAES-P-113,SAES-P-


Motor Installation Contractor QC Electrical
2.16 Project Quality Plan 114/VA-
Checklist Inspector
N/A H W H Test
444701sht001-011

Conduct no load test, vibration,


temperature and winding
Motor Installation Contractor QC Electrical
3.0 resistance test(pre- Project Quality Plan SATR-P-3407
Checklist Inspector
N/A H S W Visual
commissioning)

Final inspection prior to


Motor Installation Contractor QC Electrical
3.1 energization. Project Quality Plan SATIP-P-113-01
Checklist Inspector
N/A H S W Visual

Install one generator set


350KW, 3ph, 50hz, 4w, 0.8pf SAIC-P-3422/SATIP-
380/220V. P-113-
Motor Installation Contractor QC Electrical
4.0 Project Quality Plan 03/GEN.SPECS/DWG
Checklist Inspector
N/A W S W Visual
.no.VA-132415sht.001
& VA-444701 sht.001

Precommissioning genset in
SATIP-P-113- Motor Installation Contractor QC Electrical
4.1 coordination fo job phase 800 Project Quality Plan
01/SATR-P-3143 Checklist Inspector
N/A H S W Visual
& Gsaset vendor.
LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/14 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: SUB STATION RB DEMOLITION/RELOCATION WORKS Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1 Sub- station Demolishing Works


See below for
Contractor QC Electrical
1.1 Demolition Scope of Project Quality Plan SCOPE OF WORK
Inspector
N/A W S S Visual
Works
Demolish both power and
control cables including related
control stations for existing
pumps and motors as shown
Contractor QC Electrical
1.1.1 on Demolition Drawing no VA- Project Quality Plan SCOPE OF WORK
Inspector
N/A W S S Visual
132415sht.001 and SK-
444700.001

Isolate and remove vertical


Contractor QC Electrical
1.1.2 section nos 6&7 of MCC#RB1 Project Quality Plan SCOPE OF WORK
Inspector
N/A W S S Visual

Relocate of breaker units 6F


and &A to units 5E & 5F.
Associated cables rerouting is Contractor QC Electrical
1.1.3 shown per drawing no. Project Quality Plan SCOPE OF WORK
Inspector
N/A W S S Visual
VA132415sht.001 & VA-
444700sht.007

Disconnect and remove


existing units complete with
doors of MCC RB1 sections
3D, 3E &3F, MCC RB2
Contractor QC Electrical
1.1.4 sections 7A to 7F, 3A & Project Quality Plan SCOPE OF WORK
Inspector
N/A W S S Visual
3B.refer Demolition drawing
VA-132415sht.001 & SK-
444700sht.001

Demolition of Existing FACP


and accessories for API control
room and S/S RB.Demolition Contractor QC Electrical
1.1.5 Project Quality Plan SCOPE OF WORK
Inspector
N/A W S S Visual
drawing VA-149524sht.001

Demolish the existing 2kVA


UPS located at API control Contractor QC Electrical
1.1.6 room after commissioning the Project Quality Plan SCOPE OF WORK
Inspector
N/A W S S Visual
new 15kVA UPS.

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

* Note: Above activities will be done & monitored by aramco approved vendor
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/15 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: LOW VOLTAGE CONTROL GEAR/VARIABLE FREQUENCY DRIVES/AUTOMATIC TRANSFER SCHEME (ATS) Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material Receiving


1.1 Material handled carefully and a) Electrical
properly. specification Product Labels &
b) Manufacture's Name plate details/Mt. Contractor QC Material
MRK-15-01 N/A R/M S S Visual
instruction Receiving Inspection Rep.
c)16-SAMSS-510, Report/Catalogues
16-SAMSS-513

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical
requirements. Record and Specification Product Labels &
report all discrepancies and c)16-SAMSS-510, Name plate details/Mt. Contractor QC Material
damage immediately. MRK-13-01 16-SAMSS-513 N/A R/M S W Visual
Receiving Inspection Rep.
d)MCC Report/Catalogues
specs.VFD//ATS

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Product Labels &
sunlight exposure. b) Manufacture's Name plate details/Mt. Contractor QC Material
MRK-15-01 N/A R/M S S Visual
instruction Receiving Inspection Rep.
C)16-SAMSS-510, Report/Catalogues
16-SAMSS-513

2 SWITCH GEARS LOW VOLTAGE CONTROL GEARS INSTALLATION/AUTOMATIC TRANSFER SCHEME (ATS)
Install low voltage control gear SAES-P-116/16-
Y54-RB-MCC-01 RB Project Quality SAMSS-503/DWG # Contractor QC Electrical
2.1 substation Plan/WI/SWWP-002 & 003 VA-44470.001 &
SATIP-P-116-04
Inspector
N/A W S W Visual
MCC specs.
Install new 3-units VFD's Project Quality SAES-P-116/VFD Contractor QC Electrical
2.2 Plan/WI/SWWP-002 & 003 specs.
SATIP-P-116-13
Inspector
N/A W S W Visual

Install ATS Project Quality SAES-P-116/ATS Contractor QC Electrical


2.3 Plan/WI/SWWP-002 & 003 specs
SATIP-P-116-01
Inspector
N/A W S W Visual

Install feeder cables on ATS Project Quality DWG VA- Contractor QC Electrical
2.4 Plan/WI/SWWP-002 & 003 132415.001
SATIP-P-116-01
Inspector
N/A W S W Visual

Install new power supply each


Project Quality SAES-P-116/VA- Contractor QC Electrical
2.5 pump VFD from existing MCC-
Plan/WI/SWWP-002 & 003 444701.011
SATIP-P-116-04
Inspector
N/A H W H Visual
RB1&2
Precommissioning of new SATIP-P-116-
Project Quality Contractor QC Electrical
2.6 installed LV controlgear, VFD
Plan/WI/SWWP-002 & 003
SAES-P-116 04/SATIP-P-116-
Inspector
N/A H W H Visual
& ATS. 13/SATIP-P-114-01

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring

* Note: Above activities will be done & monitored by aramco approved vendor
INSPECTION AND TEST PLAN
Document No. :
PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY
CLIENT: Saudi Aramco AND MARINE AREA, PHASE-1
ITP/EW/16 Rev.:0 Page : 1 of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: DRY TYPE POWER TRANSFORMER INSTALLATION Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITIRIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material
1.1 Material handled carefully and a) Electrical
properly.
specification Product Labels &
Name plate details/Mt. Contractor QC Material
MRK-15-01 b) Manufacture's N/A R/M S W Visual
Receiving Inspection Rep.
instruction Report/Catalogues
c)14-SAMSS-531

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical Product Labels &
requirements. Record and Specification Name plate details/Mt. Contractor QC Material
report all discrepancies and MRK-13-01 c)14-SAMSS-531 N/A R/M S W Visual
Receiving Inspection Rep.
damage immediately. Report/Catalogues

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Product Labels &
sunlight exposure. Name plate details/Mt. Contractor QC Material
MRK-15-01 b) Manufacture's N/A R/M S W Visual
Receiving Inspection Rep.
instruction Report/Catalogues
c)14-SAMSS-531

2 Power Transformer
Install dry-type power Project Quality Plan/WI/SWP- SAES-P-121/DWG # MRK /QC/054 & QC- Contractor QC Electrical
2.1 transformer. 002 & 003 VA-132415.001 EL-4 Inspector
N/A W S W Visual

• Wiring and interconnection Project Quality Plan/WI/SWP- SAES-P-121/SAES- MRK /QC/054 & QC- Contractor QC Electrical
2.2 002 & 003 P-104 EL-4 Inspector
N/A W S W Visual

Conduct pre-commissioning SATIP-P-121-


Project Quality Plan/WI/SWP- VA-444701.011/VA-
2.3 and functional testing.
002 & 004 444734.015-020
01/SATR-P- N/A W S W Visual
3907/Form#P-024
Final inspection SAES-P-121/SAES-
P-104/VA-284681
Project Quality Plan/WI/SWP- and VA- Contractor QC Electrical
2.4 002 & 003 284682/DWG # VA-
SATIP-P-121-01
Inspector
N/A H S H Test
284650 and VE-
284667

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring


INSPECTION AND TEST PLAN
CLIENT: Saudi Aramco PROJECT: UPGRADE WASTE WATER TREATMENT FACILITIES AT JEDDAH REFINERY Document No. :
AND MARINE AREA, PHASE-1
ITP/EW/17 Rev.:0 Pages : 1of 1
Dt.:Nov.'06
BI NO./JO: 10-03563 Description: UPS DISTRIBUTION PANEL/CABINET Discipline: Electrical
CONTRACTOR: M. R. AL-AL-KHATHLAN EST.
INSPECTION AUTHORITY
PROCESS QUALITY CONTROL ACCEPTANCE VERIFYING SUB- Method of
ITEM NO. QC PROC. REF. RESPONSIBILITY MRK SAPMT WRPIS
DESCRIPTION ACTIVITY CRITERIA DOCUMENT CONTRACTOR inspection
CODE CODE CODE CODE

1.0 Material
1.1 Material handled carefully and a) Electrical
properly.
specification Product Labels &
Name plate details/Mt. Contractor QC Material
MRK-15-01 b) Manufacture's N/A R/M S S Visual
Receiving Inspection Rep.
instruction Report/Catalogues
c)16-SAMSS-518.

1.2 Check all materials received a) Purchase Order


for conformance to all standard b) Electrical Product Labels &
requirements. Record and Specification Name plate details/Mt. Contractor QC Material
report all discrepancies and MRK-13-01 C)16-SAMSS-518. N/A W S W Visual
Receiving Inspection Rep.
damage immediately. Report/Catalogues

1.3 Store all items in a safe place a) Electrical


free from dust and direct specification Product Labels &
sunlight exposure. Name plate details/Mt. Contractor QC Material
MRK-15-01 b) Manufacture's N/A R/M S S Visual
Receiving Inspection Rep.
instruction Report/Catalogues
c)16-SAMSS-518.

2 UPS PANEL Y54-UPS-PP-02/UPS CABINET Y54-UPS-PP-01


Installation • 400V UPS Project Quality Plan/WI/SWP- Contractor QC Electrical
2.1 panel/cabinet. 002&003
SATIP-P-103-01
Inspector
N/A W S W Visual

Install interconnection wiring. 16-SAMSS-518.


Project Quality Plan/WI/SWP- Contractor QC Electrical
2.2 002&003
/SAES-P-104/Aramco SATIP-P-103-01
Inspector
N/A W S W Visual
approved Drg.
Install Battery Bank along with
Project Quality Plan/WI/SWP- SAES-P-103/Aramco Contractor QC Electrical
2.3 battery rack and disconnect
002&003 approved Drg.
SATIP-P-103-01
Inspector
N/A W S W Visual
switch.
Inspection of power panel. 16-SAMSS-
518./SAES-P-
Project Quality Plan/WI/SWP- Contractor QC Electrical
2.4 002&003
113,SEAS-P-114/as SATIP-P-103-01
Inspector
N/A W S W Visual
per aramco approved
drg.
Install power connection to the
MOV's from new power panel Project Quality Plan/WI/SWP- SAES-P-103,SEAS-P- Contractor QC Electrical
2.5 which are fed from the existing 002&003 114
SATIP-P-103-01
Inspector
N/A W S W Visual
switch rack

Final inspection of UPS Project Quality Plan/WI/SWP- SAES-P-103,SEAS-P- Contractor QC Electrical


2.6 distribution panel. 002&003 114
SATIP-P-103-01
Inspector
N/A H W H Test

LEGEND: R= Review, W= Witness Point, H= Hold Point, S= Surveillance, M= Monitoring