You are on page 1of 2

Index 07.02.2019 31.03.

2019

ACTIVITY NO. ACTIVITY DESCRIPTION RESPONSIBLE REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIYING DOCUMENT REMARKS

1.0 DOCUMENT REVIEW


Material Approval; Specification E13
1) Earthing and lightning protection MA‐E‐002: Application for Material
G02 General Description of Project and Works
materials Approval for Earthing and Lightning
1.1 QA/QA/AC G03 Project Execution Material Approval H R/S
Protection Materials with accessories
IEC 60364 Low‐voltage electrical installations
for Earthing and Lighting System
IEC 62305 Protection against lightning
Method Stament; Specification E13
59‐QA/AC10‐F‐311: METHOD
Method statement of site installation G02 General Description of Project and Works
STATEMENT FOR EARTHING & Method Statement
1.2 for earthing and lightning protection Quality control engineer G03 Project Execution H R/S
LIGHTNING PROTECTION SYSTEM FOR Approval
system IEC 60364 Low‐voltage electrical installations
STATION BUILDINGS
IEC 62305 Protection against lightning

Specification E13
G02 General Description of Project and Works
Earthing and lightning protection
1.3 Electrical group G03 Project Execution Shop drawings approval H R/S
system shop drawings
IEC 60364 Low‐voltage electrical installations
IEC 62305 Protection against lightning

2. MATERIAL RECEIVING

Verification of received Earthing and


MA‐E‐002: Application for Material
lightning protection materials.
Approval for Earthing and Lightning
All received material should be;
Protection Materials with accessories Specification E13
1) As per Material approval document
for Earthing and Lighting System G02 General Description of Project and Works
with same properties Material
2.1 Electrical group G03 Project Execution H R/S
2) Brand new and free of damage 3) Inspection Report approval
59‐QA/AC10‐F‐311: METHOD IEC 60364 Low‐voltage electrical installations
Checking of Manufacturer label and
STATEMENT FOR EARTHING & IEC 62305 Protection against lightning
marking
LIGHTNING PROTECTION SYSTEM FOR
4) Material should be store as per
STATION BUILDINGS
manufacturer recomendation
3. INSTALLATION OF EARTHING AND LIGHTNING PROTECTION SYSTEM
Specification E13
Field installation verification:
G02 General Description of Project and Works 59‐QA/AC10‐F‐311:
To ensure the complete earthing and 59‐QA/AC10‐F‐311: Method
3.1 QA/AC and Electrical group G03 Project Execution Method Statement & H R/S
lightning protection system Statement
IEC 60364 Low‐voltage electrical installations Related Shop Drawings
installation as per the approved
IEC 62305 Protection against lightning
drawings
Submit RFT to notify Engineer for testing and 59‐QA/AC10‐F‐311:
3.2 Notification to start activity QA/AC and Electrical group Related Request for testing form H R/S
commissioning activity Method Statement
Revision Document Number
Index A 0 1
07.02.2019 31.03.2019 59‐QA/AC10‐N‐301
PARTICIPATION
ACTIVITY NO. ACTIVITY DESCRIPTION RESPONSIBLE REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIYING DOCUMENT REMARKS

Contact test for electrical bolted Verify tightness of accessible bolted electrical
3.3 QA/AC and Electrical group Method Statement Check list H R/S
connections (torque test) connections by calibrated torque wrench

To ensure complete installation of neutral earthing


3.4 Verification of neutral earthing QA/AC and Electrical group Method Statement Check list H R/S
system.

Ensure the trip time shall be consistent with


3.5 Earthing fault verification QA/AC and Electrical group Method Statement Check list H R/S
manufacturer's specified values.

To ensure the loop impedance are compliance with


3.6 Earth loop impedence verification QA/AC and Electrical group Method Statement Check list H R/S
the specified value.

Continuity test for air termination Verify tighness of accessible bolted electrical
3.7 QA/AC and Electrical group Method Statement Check list H R/S
network connections by calibrated torque wrench.

The resistance between the main grounding electrode


3.8 Electrode test QA/AC and Electrical group Method Statement Check list H R/S
and ground shall be no greater than 4 ohm.