ACTIVITY NO. ACTIVITY DESCRIPTION RESPONSIBLE REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIYING DOCUMENT REMARKS
Specification E13
G02 General Description of Project and Works
Earthing and lightning protection
1.3 Electrical group G03 Project Execution Shop drawings approval H R/S
system shop drawings
IEC 60364 Low‐voltage electrical installations
IEC 62305 Protection against lightning
2. MATERIAL RECEIVING
Contact test for electrical bolted Verify tightness of accessible bolted electrical
3.3 QA/AC and Electrical group Method Statement Check list H R/S
connections (torque test) connections by calibrated torque wrench
Continuity test for air termination Verify tighness of accessible bolted electrical
3.7 QA/AC and Electrical group Method Statement Check list H R/S
network connections by calibrated torque wrench.
LEGENDS: A: APPROVAL R: REVIEW DOCUMENT S: SURVEILLANCE W: WITNESS SW: SPOT WITNESS H: HOLD POINT