Closure Type “Enclosed Welding Standards
Plate Welding . Singlesided Min, Plate Thickness
DEFLECTION CRITERIA
Rigid Frame Horiz. HTS Purlins ~u180
Rigid Frame Vert. ~u150 ints ~un20
End Wall Columns uso
NOTES
Prafful Sir: Please confirm Building is designed MBS or Stadi
Consider Utity load 150 kgitmt. on rafter of ail building areas _
Sofft panel consider forall canopies
Down take pipe 1000 mm below FFL considered. ~~
‘Shear Studs considered for Mezzanine
“Mezzanine Clear Height Approx. 4.25 m Below Bear)
PVC Pipe Considered ~~
Sofft Panel considered fo all canopy ~_
Exhaust fan at 35 kgs per nos. considered.
All staircases in PEB——
‘Water tank load of 10000 It. capacity on staircase slab
Live load for all mezzanine lor 300 kas: (htpsq mi}.
Solar panel load of 0:30 kn/m2 is considered on root
Fre protection load of 200 kg is considered on col and 60m on puting.
04 nos. of cage ladder and 07 nos. of staircase i considered,
‘Turbo-ventis caleulated as per 6 air change
‘AWS D1.1M:2006
4mm
Ss
‘Mezzanine (LL) 240,
‘Mezzanine (OL +L) 360,
Hanging pletorm &. walay i col wt