You are on page 1of 20

<>Column orientation in STAAD are not matching with the A) This is for

drawing / architectural drawing, check and correct. information:-


<>Loading applications are missing and need to be incorporated. <>This is the 1st
resubmission
submitted by SPCL for
review purpose
received to TCE.
<>But it is observed KEY PLAN:
that some of TCE
KMP HIGHWAY

comments are not GATE GATE GATE


60m wide road
GATE GATE GATE GATE

RCC Staircase yet incorporated in


LAGOON

GATE
this resubmission and

GATE
CANAL
WATER

drawing is not up to
TANK

GATE
60m wide road

45m wide road


the mark.
FINISHED CAR PARKING AREA

GATE
LAGOON

<>However for the LAGOON

timeline interest of
GATE GATE GATE GATE GATE GATE GATE GATE
60m wide road

the project, TCE


herewith approving
this drawing with
Check column comments.
<>SPCL to submit the
position, shall correct record
be at grid purpose drawings
center. after incorporating all
our comments.

B) COMMENTS NOT
INCORPORATED IN
THE DRAWING:-
Refer comments
marked in this
Notes- drawing.
Contractor shall ensure that, the Design , Loading and Drawings are in compliance
with the project DBR provided and the latest Indian Standard Codes of design. C) MISSING DETAILS
NOT YET RECEIVED IN
Contractor shall also ensure that all optimization opportunities in design are
DRAWING-
explored and adopted. Contractor shall be responsible and shall provide the stability > Refer mail dated
certificate for the structure. 14-01-2023, sent to
Shall be ensured by the contractor that these comments are incorporated in the SPCL about missing
details in drawings.
subsequent working & submittals. > ANCHOR BOLT
design and detail
drawings from Grid
14 to 2a.
> Grid 13 to 2a
Connection design
calculations & details FOR REFERENCE
of same in drawing
are not yet
submitted.
FOR ESTIMATION
> Missing Levels &
Dimensions. (Like FOR APPROVAL
clear height/
dimension & Top of
TCE.12648C-3010-SPCL-PRS-155 structure). CONTRACT
> Purlin Layout & all
Girt elevations (Side
wall and gable end FOR TENDER
framing) with sag rod
layout not shown in
drawings. FOR CONSTRUCTION
> Staircase design
calculations & details
Rohit Digitally signed
by Rohit Bhagat of same in drawing AS-BUILT
Bhagat 17:57:12 +05'30'
Date: 2023.02.01

are not yet


submitted.
> Deck slab, Deck
MSIL NEW FACTORY PROJECT
sheet design
calculations & details SONIPAT (PACKAGE-01)
of same in drawing
are not yet
submitted.
> Roof plan showing MARUTI SUZUKI INDIA LTD.

gutter and downtake


location.
CONSULTING ENGINEERS LIMITED
> Sheeting drawings PUNE
showing Sheeting
lines, levels, height,
Sheet lapping,
flashing, trim, soffit, COLUMN LAYOUT PLAN
framed openings,
connection bolts and DEL-1664-001-C-SL-001
screw details, etc
shall be submitted.

N
W
UP

Add details

E
COLUMN SCHEDULE:-

<>FFL= (-) 1.0m Check column position, shall


<>Column bottom of base plate shall be 300mm below FFL. be at grid center.
<> FFL= (-) 1.0m
<>Column bottom of base plate shall be <>Column position are not matching with Latest architectural drawing SHAPOORJI PALLONJI & CO. PVT. LTD.
STEEL COLUMN LAYOUT 300mm below FFL. (R0), check and update. Staircase location Shall be as per 7TH FLOOR, KANCHANJUNGA BUILDING,

<>Please take care this in Pile and pile cap <>Please take care this in Pile and pile cap drawing. architectural drawing-R0, check and
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
drawing. <>Column Orientation in STAAD is wrong, check and update update.
MSIL-KH-SPCL-PRESS (A+B)-COLUMN-LYT-155
<>Column Orientation in STAAD is wrong,
check and update Canopy 5.1m wide
KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

A) This is for information:-

GATE
C1
LAGOON

<>This is the 1st resubmission LAGOON

C2
GATE GATE GATE GATE GATE GATE GATE GATE
60m wide road

submitted by SPCL for review


purpose received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
drawing with comments.
<>SPCL to submit the correct
1350** C2 record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
950** INCORPORATED IN THE
DRAWING:-
C1-Staircase location is not
matching with the latest
architectural drawing.
C2-Show Cross section with
all details & dimension.

1350** C) MISSING DETAILS NOT YET


C2 RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
950** drawings. FOR REFERENCE
> ANCHOR BOLT design and
detail drawings from Grid 14
to 2a. FOR ESTIMATION
> Grid 13 to 2a Connection
design calculations & details
of same in drawing are not FOR APPROVAL
yet submitted.
> Missing Levels &
1350** CONTRACT
C2 Dimensions. (Like clear
height/dimension & Top of
structure).
> Purlin Layout & all Girt
FOR TENDER
TCE.12648C-3010-SPCL-PRS-156 elevations (Side wall and
950** gable end framing) with sag FOR CONSTRUCTION
rod layout not shown in
drawings.
> Staircase design calculations AS-BUILT
** & details of same in drawing
<>Staircase to be shifted are not yet submitted.
@2nd bay. > Deck slab, Deck sheet
<>First floor mezzanine design calculations & details MSIL NEW FACTORY PROJECT
to be reduced.
1350** C2 of same in drawing are not SONIPAT (PACKAGE-01)
yet submitted.
> Roof plan showing gutter
and downtake location.
> Sheeting drawings showing MARUTI SUZUKI INDIA LTD.

950** Sheeting lines, levels, height,


Sheet lapping, flashing, trim,
soffit, framed openings, CONSULTING ENGINEERS LIMITED
Rohit Digitally signed
by Rohit Bhagat
connection bolts and screw PUNE
Bhagat 17:17:18 +05'30'
Date: 2023.01.31

details, etc shall be


submitted.
C2 1ST MAZZANINE PLAN

DEL-1664-001-C-SL-002

N
W
S

E
Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided
and the latest Indian Standard Codes of design. Contractor shall also ensure that all optimization
SHAPOORJI PALLONJI & CO. PVT. LTD.
1st MEZZANINE PLAN AT LVL+3300 opportunities in design are explored and adopted. Contractor shall be responsible and shall provide the 7TH FLOOR, KANCHANJUNGA BUILDING,
** As per MSIL Comments dated stability certificate for the structure. BARAKHAMBA ROAD, CON NAUGHT PLACE,

23-01-2023 Shall be ensured by the contractor that these comments are incorporated in the subsequent working & NEW DELHl-110001

submittals. MSIL-KH-SPCL-PRESS (A+B)-1ST-MEZZANINE-156


KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

A) This is for information:-

GATE
LAGOON

<>This is the 1st GATE GATE GATE GATE GATE


60m wide road
GATE
LAGOON

GATE GATE

resubmission submitted by
SPCL for review purpose
received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
C2 herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C2-Show Cross section with
all details & dimension.

C) MISSING DETAILS NOT YET


C2 RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
> ANCHOR BOLT design and
detail drawings from Grid 14 FOR REFERENCE
to 2a.
> Grid 13 to 2a Connection
design calculations & details FOR ESTIMATION
of same in drawing are not
yet submitted.
> Missing Levels & FOR APPROVAL
C2 Dimensions. (Like clear
height/dimension & Top of
structure). CONTRACT
TCE.12648C-3010-SPCL-PRS-157 > Purlin Layout & all Girt
elevations (Side wall and
gable end framing) with sag
FOR TENDER
rod layout not shown in
drawings. FOR CONSTRUCTION
> Staircase design
calculations & details of same
in drawing are not yet AS-BUILT
submitted.
> Deck slab, Deck sheet
C2 design calculations & details
of same in drawing are not MSIL NEW FACTORY PROJECT
yet submitted. SONIPAT (PACKAGE-01)
Rohit Digitally signed > Roof plan showing gutter
by Rohit Bhagat

Bhagat 17:44:34 +05'30'


Date: 2023.01.31
and downtake location.
> Sheeting drawings showing
Sheeting lines, levels, height, MARUTI SUZUKI INDIA LTD.
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw CONSULTING ENGINEERS LIMITED
details, etc shall be PUNE
submitted.

2ND MAZZANINE PLAN

DEL-1664-001-C-SL-003

N
W
S

E
2nd MEZZANINE PLAN AT LVL+6500
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-2ND-MEZZANINE-157
KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
C3
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is C4 (Typical)
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C3-Catwalk location is not
matching with the Latest
architectural drawing.
C4-What are CB1, CB2, and
CB3? Define abbreviations

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL FOR REFERENCE
about missing details in
drawings.
> ANCHOR BOLT design and FOR ESTIMATION
detail drawings from Grid 14
to 2a.
TCE.12648C-3010-SPCL-PRS-158 FOR APPROVAL
> Grid 13 to 2a Connection
design calculations & details
of same in drawing are not CONTRACT
yet submitted.
> Missing Levels &
Dimensions. (Like clear FOR TENDER
height/dimension & Top of
structure).
> Purlin Layout & all Girt FOR CONSTRUCTION
elevations (Side wall and
gable end framing) with sag
rod layout not shown in AS-BUILT
drawings.
> Staircase design
calculations & details of same Rohit Digitally signed
by Rohit Bhagat
in drawing are not yet MSIL NEW FACTORY PROJECT
Bhagat Date: 2023.01.31
17:58:05 +05'30'

submitted. SONIPAT (PACKAGE-01)


> Deck slab, Deck sheet
design calculations & details
of same in drawing are not
yet submitted. MARUTI SUZUKI INDIA LTD.

> Roof plan showing gutter


and downtake location.
> Sheeting drawings showing CONSULTING ENGINEERS LIMITED
PUNE
Sheeting lines, levels, height,
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw CATWALK PLAN
details, etc shall be
submitted. DEL-1664-001-C-SL-004

N
W
C3

E
CRANE CATWALK LEVEL PLAN AT 11.5M
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-CATWALK-158
A) This is for information:-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
C10

C7 KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

Sheeting
LAGOON

GATE
GATE
CANAL
WATER
TANK

Dim.,?? C9

GATE
60m wide road
C11

45m wide road


FINISHED CAR PARKING AREA

Dim.,??

GATE
LAGOON

C6 (Typical) Dim? GATE GATE GATE GATE GATE


60m wide road
GATE
LAGOON

GATE GATE

DN

C5 (Typical)

C8

Rohit Digitally signed


by Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01

TCE.12648C-3010-SPCL-PRS-159

FOR REFERENCE

Dim?? FOR ESTIMATION

C) MISSING DETAILS NOT YET RECEIVED IN DRAWING- FOR APPROVAL


> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings. B) COMMENTS NOT
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a. INCORPORATED IN THE
> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet DRAWING:- CONTRACT
submitted. C5-Specify roof monitor out to
> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure). out width.
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not C6-2m wide canopy (Typical). FOR TENDER
C7-Show center to sheeting out. Rohit Digitally signed

shown in drawings.
by Rohit Bhagat

Bhagat
Date: 2023.01.31

(Typical)
19:26:02 +05'30'

> Staircase design calculations & details of same in drawing are not yet submitted. FOR CONSTRUCTION
> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted. C8-Show Skylight & Air washer,
> Roof plan showing gutter and downtake location. exact location shall be as per
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, Latest architectural drawing and
add arrangement detail for AS-BUILT
framed openings, connection bolts and screw details, etc shall be submitted.
review.
C9-Show Toilet Block, location
shall be as per Architectural
MSIL NEW FACTORY PROJECT
drawing R0.
C10-Show sheeting out to out SONIPAT (PACKAGE-01)
dimension (Typical).
C11-Check Gutter slope and
<>Refer mail Dated -18-12-2022 for changes in arrow direction. (Typical)
roof monitor. MARUTI SUZUKI INDIA LTD.

<>Extend the roof monitor as shown, 3500 mm


from the end of the roof monitor to the sheeting CONSULTING ENGINEERS LIMITED
out. (Typical) PUNE

ROOF PLAN

DEL-1664-001-C-SL-005

N
W
Width of Roof monitor shall
be 7.0m, As per MSIL
DN

E
Comment dated 23-01-2023)
2m wide Canopy

LEGEND:-
dim.,?? dim.,?? SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
Update detail as per Architectural BARAKHAMBA ROAD, CON NAUGHT PLACE,
drawing (R0). NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-ROOF-PLAN-159
C12

KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

MATCH LINE

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

Check text

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
<>But it is observed that some
of TCE comments are not yet
incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
3050mm clear 6250mm clear drawing with comments.
3050mm clear <>SPCL to submit the correct
record purpose drawings after
incorporating all our comments.
TYP TRUSS SECTION - 1
B) COMMENTS NOT
C14 C13
INCORPORATED IN THE
DRAWING:- FOR REFERENCE
C12
C12-Specify all the dimensions.
C13-Bottom of base plate shall
be -300mm from FFL.
FOR ESTIMATION
C14-Down take shall be up to
nearest storm chamber FOR APPROVAL
(typical).
Rohit Digitally signed
by Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01

MATCH LINE C) MISSING DETAILS NOT YET CONTRACT


RECEIVED IN DRAWING-
<> Refer mail dated
14-01-2023, sent to SPCL about FOR TENDER
TCE.12648C-3010-SPCL-PRS-164 missing details in drawings.
<> ANCHOR BOLT design and
detail drawings from Grid 14 to FOR CONSTRUCTION
2a.
<> Grid 13 to 2a Connection
design calculations & details of AS-BUILT
same in drawing are not yet
submitted.
<> Missing Levels & MSIL NEW FACTORY PROJECT
Dimensions. (Like clear height/
dimension & Top of structure). SONIPAT (PACKAGE-01)
<> Purlin Layout & all Girt
elevations (Side wall and gable
end framing) with sag rod
layout not shown in drawings. MARUTI SUZUKI INDIA LTD.

<> Staircase design calculations


& details of same in drawing
CONSULTING ENGINEERS LIMITED
are not yet submitted. PUNE
<> Deck slab, Deck sheet design
calculations & details of same in
drawing are not yet submitted.
<> Roof plan showing gutter TYP SECTIONS
and downtake location.
<> Sheeting drawings showing DEL-1664-001-C-SL-010
Sheeting lines, levels, height,
Sheet lapping, flashing, trim,

N
TYP TRUSS SECTION - 1 soffit, framed openings,

W
connection bolts and screw
details, etc shall be submitted.

E
Contractor shall ensure that, the Design a, Loading nd Drawings are in
compliance with the project DBR provided and the latest Indian <>Show pipe rack, ducting and cable tray supporting arrangement with all
Standard Codes of design. Contractor shall also ensure that all
details and submit design calculation for review.
optimization opportunities in design are explored and adopted.
Contractor shall be responsible and shall provide the stability SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
certificate for the structure. BARAKHAMBA ROAD, CON NAUGHT PLACE,
shall be ensured by the contractor that these comments are NEW DELHl-110001
incorporated in the subsequent working & submittals.
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-164
C17 (Typical) MATCH LINE
KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

Digitally signed
Rohit byDate:Rohit Bhagat
Bhagat 2023.01.31
20:44:39 +05'30'

TCE.12648C-3010-SPCL-PRS-165
TYP TRUSS SECTION - 2

MATCH LINE
Rohit Digitally
FOR REFERENCE
signed
by Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01

FOR ESTIMATION
C16

FOR APPROVAL

CONTRACT

FOR TENDER
C15

FOR CONSTRUCTION

AS-BUILT

MSIL NEW FACTORY PROJECT


SONIPAT (PACKAGE-01)
A) This is for information:-
<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE. MARUTI SUZUKI INDIA LTD.

<>But it is observed that some of


TCE comments are not yet
CONSULTING ENGINEERS LIMITED
incorporated in this PUNE
resubmission and drawing is not
up to the mark. TYP TRUSS SECTION - 2
<>However for the timeline
interest of the project, TCE TYP SECTIONS
herewith approving this drawing
with comments. C) MISSING DETAILS NOT YET RECEIVED IN DRAWING- DEL-1664-001-C-SL-011
<>SPCL to submit the correct <> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
record purpose drawings after <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
<> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet

N
incorporating all our comments.

W
submitted.
B) COMMENTS NOT <> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).

E
INCORPORATED IN THE <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not
DRAWING:- shown in drawings.
C15-Lean to between grids 3-12, <> Staircase design calculations & details of same in drawing are not yet submitted. Contractor shall ensure that, the Design a, Loading nd Drawings are in compliance with the
show with all details. <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet project DBR provided and the latest Indian Standard Codes of design. Contractor shall also
ensure that all optimization opportunities in design are explored and adopted. Contractor SHAPOORJI PALLONJI & CO. PVT. LTD.
C16-Clear 1500mm (Typical). submitted. 7TH FLOOR, KANCHANJUNGA BUILDING,
C17-Show Exhaust fan <> Roof plan showing gutter and downtake location. shall be responsible and shall provide the stability certificate for the structure. BARAKHAMBA ROAD, CON NAUGHT PLACE,

supporting detail, bracing should <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, shall be ensured by the contractor that these comments are incorporated in the subsequent NEW DELHl-110001

be planned accordingly. soffit, framed openings, connection bolts and screw details, etc shall be submitted. working & submittals.
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-165
KEY PLAN:
KMP HIGHWAY

MATCH LINE GATE GATE GATE


60m wide road
GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

C20

C18

6250mm clear

3050mm clear

ELEVATION ALONG GRID-14

MATCH LINE
FOR REFERENCE

FOR ESTIMATION

FOR APPROVAL

CONTRACT

FOR TENDER

FOR CONSTRUCTION

AS-BUILT

MSIL NEW FACTORY PROJECT


SONIPAT (PACKAGE-01)

C19

A) This is for information:- MARUTI SUZUKI INDIA LTD.

ELEVATION ALONG GRID-14 <>This is the 1st resubmission


submitted by SPCL for review
CONSULTING ENGINEERS LIMITED
purpose received to TCE. PUNE
<>But it is observed that some of
TCE comments are not yet
incorporated in this resubmission TCE.12648C-3010-SPCL-PRS-166
and drawing is not up to the TYP SECTIONS
mark.
<>However for the timeline DEL-1664-001-C-SL-012
interest of the project, TCE
herewith approving this drawing C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
<> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.

N
with comments.

W
<>SPCL to submit the correct <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
record purpose drawings after <> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet

E
incorporating all our comments. submitted.
<> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
B) COMMENTS NOT <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not Rohit Digitally signed
by Rohit Bhagat

shown in drawings. Bhagat 00:22:55 +05'30'


Date: 2023.01.20

INCORPORATED IN THE SHAPOORJI PALLONJI & CO. PVT. LTD.


DRAWING:- <> Staircase design calculations & details of same in drawing are not yet submitted. 7TH FLOOR, KANCHANJUNGA BUILDING,
C18-Ensure connection stability <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet BARAKHAMBA ROAD, CON NAUGHT PLACE,

(Typical) submitted. <>With reference to Staad model submitted on


NEW DELHl-110001

C19-At grid 14, there is no shed. <> Roof plan showing gutter and downtake location. 05.01.2023, Still some members are failing and need MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-166
Check and update. <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, to optimize.
C20-Show Deck slab line. soffit, framed openings, connection bolts and screw details, etc shall be submitted.
<>Keep utilization ratio around 0.9
MATCH LINE A) This is for information:-
<>This is the 1st resubmission
submitted by SPCL for review KEY PLAN:
C20 purpose received to TCE. KMP HIGHWAY

C21
<>But it is observed that some GATE GATE GATE
60m wide road
GATE GATE GATE GATE

of TCE comments are not yet LAGOON

GATE
incorporated in this

GATE
resubmission and drawing is
CANAL
WATER
TANK

GATE
60m wide road
not up to the mark.

45m wide road


FINISHED CAR PARKING AREA

<>However for the timeline

GATE
LAGOON

interest of the project, TCE


LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

herewith approving this


drawing with comments.
C22 <>SPCL to submit the correct
record purpose drawings after
incorporating all our
comments.

B) COMMENTS NOT
TYP TRUSS SECTION -4 INCORPORATED IN THE
DRAWING:-
C18-Ensure connection
stability (Typical)
MATCH LINE C19-At grid 14, there is no
shed. Check and update.
C20-Show Deck slab line.
C21-Jack Truss chords size are
larger than Main truss chords,
draw all sizes in true scale.
(typical)
C22-Should be equal spacing
between verticals, check and
update. (Typical)
C23-Show full section.
C24-1500mm min distance
require between Girts (typical
requirement in all frame).

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023,
TYP TRUSS SECTION -4 sent to SPCL about missing FOR REFERENCE
details in drawings.
> ANCHOR BOLT design and
detail drawings from Grid 14 to FOR ESTIMATION
2a.
MATCH LINE > Grid 13 to 2a Connection
design calculations & details of FOR APPROVAL
C24 same in drawing are not yet
submitted.
> Missing Levels & Dimensions.
CONTRACT
(Like clear height/dimension &
Top of structure). FOR TENDER
> Purlin Layout & all Girt
elevations (Side wall and gable
end framing) with sag rod FOR CONSTRUCTION
layout not shown in drawings.
> Staircase design calculations
& details of same in drawing AS-BUILT
are not yet submitted.
> Deck slab, Deck sheet design
calculations & details of same
in drawing are not yet MSIL NEW FACTORY PROJECT
submitted. SONIPAT (PACKAGE-01)
> Roof plan showing gutter and
TYP TRUSS SECTION -5 downtake location.
> Sheeting drawings showing
Sheeting lines, levels, height, MARUTI SUZUKI INDIA LTD.

MATCH LINE Sheet lapping, flashing, trim,


soffit, framed openings,
connection bolts and screw CONSULTING ENGINEERS LIMITED
PUNE
C23 details, etc shall be submitted.

TCE.12648C-3010-SPCL-PRS-167 TYP SECTIONS

DEL-1664-001-C-SL-013

N
W
S

E
Rohit Digitally signed
by Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01

SHAPOORJI PALLONJI & CO. PVT. LTD.


7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
TYP TRUSS SECTION -5 NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-167
MATCH LINE

KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

C26

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

C25

TYP TRUSS SECTION -6

MATCH LINE
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C25-All vertical and diagonal
member's spacing should be
uniform. (Typical).
C26-Weld Substation,
update wall condition
accordingly.(Typical
comment)
TCE.12648C-3010-SPCL-PRS-168 C27-Mention Grid with truss
type (typical).
C28-Refer drawing number
160 for Truss type 6A.Add
section of Truss type 6A.

C) MISSING DETAILS NOT


YET RECEIVED IN DRAWING-
> Refer mail dated
FOR REFERENCE
14-01-2023, sent to SPCL
TYP TRUSS SECTION -6 about missing details in
MATCH LINEdrawings. FOR ESTIMATION
> ANCHOR BOLT design and
C28 detail drawings from Grid 14 FOR APPROVAL
to 2a.
> Grid 13 to 2a Connection
design calculations & details CONTRACT
of same in drawing are not
yet submitted.
> Missing Levels & FOR TENDER
Dimensions. (Like clear
height/dimension & Top of
structure). FOR CONSTRUCTION
> Purlin Layout & all Girt
A) This is for elevations (Side wall and
information:- gable end framing) with sag
AS-BUILT
<>This is the 1st rod layout not shown in
resubmission submitted drawings.
by SPCL for review > Staircase design MSIL NEW FACTORY PROJECT
purpose received to TCE. calculations & details of
<>But it is observed that SONIPAT (PACKAGE-01)
same in drawing are not yet
some of TCE comments submitted.
TYP TRUSS SECTION -7 Section along Grid 16 are not yet incorporated > Deck slab, Deck sheet
in this resubmission and design calculations & details
MATCH LINE drawing is not up to the of same in drawing are not MARUTI SUZUKI INDIA LTD.

mark. yet submitted.


C27 <>However for the > Roof plan showing gutter CONSULTING ENGINEERS LIMITED
timeline interest of the and downtake location. PUNE
project, TCE herewith > Sheeting drawings
approving this drawing showing Sheeting lines,
with comments. levels, height, Sheet lapping,
<>SPCL to submit the flashing, trim, soffit, framed TYP SECTIONS
correct record purpose openings, connection bolts
drawings after and screw details, etc shall DEL-1664-001-C-SL-014
incorporating all our be submitted.
comments.

N
W
S

E
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
TYP TRUSS SECTION -7
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-168
Check loading application some loads are missing, like Live &
dead load. Ensure all loads are applied as per DBR provided
and Indian design Code. (typical)
MATCH LINE
KEY PLAN:
Sheeting?
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
C29

GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
C30 Check loading application some loads are missing, like Live & <>But it is observed that some of
TYP TRUSS SECTION -8 TCE comments are not yet
dead load. Ensure all loads are applied as per DBR provided
and Indian design Code. (typical) incorporated in this resubmission
MATCH LINE and drawing is not up to the mark.
<>However for the timeline interest
of the project, TCE herewith
approving this drawing with
comments.
<>SPCL to submit the correct record
TCE.12648C-3010-SPCL-PRS-169
purpose drawings after
incorporating all our comments.

B) COMMENTS NOT
INCORPORATED IN THE DRAWING:-
C29-Staircase at this location, check
and update.
C30-Mention Grid, shall be as per
Latest Architectural drawing.
C31-Remove Purlin from Grid 9
section, since there is a roof monitor
above. (typical)
FOR REFERENCE
TYP TRUSS SECTION -8
MATCH LINE
FOR ESTIMATION

FOR APPROVAL

CONTRACT

FOR TENDER

FOR CONSTRUCTION

AS-BUILT
TRUSS-11
C31 C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet MSIL NEW FACTORY PROJECT
submitted. SONIPAT (PACKAGE-01)
TYP TRUSS SECTION -9 > Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout
not shown in drawings.
> Staircase design calculations & details of same in drawing are not yet submitted. MARUTI SUZUKI INDIA LTD.
MATCH LINE > Deck slab, Deck sheet design calculations & details of same in drawing are not yet
submitted.
> Roof plan showing gutter and downtake location. CONSULTING ENGINEERS LIMITED
PUNE
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim,
soffit, framed openings, connection bolts and screw details, etc shall be submitted.

TYP SECTIONS

DEL-1664-001-C-SL-015

N
W
S

E
TRUSS-11

SHAPOORJI PALLONJI & CO. PVT. LTD.


7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
TYP TRUSS SECTION -9
@Weld shop area - MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-169
The spacing between vertical and diagonal members of the truss should be
made in such a way that a 1300 diameter duct may pass through without
fouling any members.
Member's Spacing
shall be uniform.
(Typical) KEY PLAN:
KMP HIGHWAY

MATCH LINE GATE GATE GATE


60m wide road
GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

A) This is for information:-


TRUSS-12
<>This is the 1st resubmission
submitted by SPCL for review purpose
received to TCE.
<>But it is observed that some of TCE
C32 comments are not yet incorporated
C32 in this resubmission and drawing is
TYP ELEVATION ALONG GRID-2a
C32 not up to the mark.
<>However for the timeline interest
of the project, TCE herewith
approving this drawing with
MATCH LINE comments.
<>SPCL to submit the correct record
purpose drawings after incorporating
C33 all our comments.
(Typical)
B) COMMENTS NOT INCORPORATED
IN THE DRAWING:-
C32-Size is not matching with STAAD.
t is 600x500, correct and update.
(Typical)
TRUSS-12
>Ensure that all member sizes are
matching with optimised STAAD.
C33-Specify height and level from FFL

C) MISSING DETAILS NOT YET


TYP ELEVATION ALONG GRID-2a RECEIVED IN DRAWING- FOR REFERENCE
C32 C32 Refer mail dated 14-01-2023, sent to
SPCL about missing details in
drawings. FOR ESTIMATION
ANCHOR BOLT design and detail
drawings from Grid 14 to 2a.
ADD TRUSS SECTION 9A & 9B Grid 13 to 2a Connection design FOR APPROVAL
TCE.12648C-3010-SPCL-PRS-170 calculations & details of same in
drawing are not yet submitted.
Missing Levels & Dimensions. (Like CONTRACT
clear height/dimension & Top of
structure).
Purlin Layout & all Girt elevations
FOR TENDER
(Side wall and gable end framing)
with sag rod layout not shown in FOR CONSTRUCTION
drawings.
Staircase design calculations &
details of same in drawing are not yet AS-BUILT
submitted.
Deck slab, Deck sheet design
calculations & details of same in
drawing are not yet submitted. MSIL NEW FACTORY PROJECT
Roof plan showing gutter and SONIPAT (PACKAGE-01)
downtake location.
Sheeting drawings showing Sheeting
lines, levels, height, Sheet lapping,
flashing, trim, soffit, framed MARUTI SUZUKI INDIA LTD.
openings, connection bolts and screw
details, etc shall be submitted.
CONSULTING ENGINEERS LIMITED
PUNE

TYP SECTIONS

DEL-1664-001-C-SL-016

N
W
S

E
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-170
STAAD Comment-
<>Wind load is missing in the stubs.
Check, can we
<>Release moment at base.
remove this
<>Effective length factor shall be 2.
Provide Beam bracing? (typical)
MATCH LINE

KEY PLAN:
1500mm minimum (clear)
KMP HIGHWAY

Dim?
60m wide road
GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

Bracing (typical)

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

Show Eave and clear height.


Portal beam @ both Portal beam @ both Portal beam @ both Tie beam Portal beam @ both Portal beam @ both
Tie beam column
column column Tie beam column column

Tie beam @
both column

3050mm clear
Dim? (Typical)

SECTION

MATCH LINE
Refer our mail
dated 18-12-2022.
<>Out to Out
Width of roof
monitor is 11.5m.

MATCH LINE FOR REFERENCE

Show joist
FOR ESTIMATION
spacing. 7000mm
FOR APPROVAL

Dim?
CONTRACT

Tie beam FOR TENDER


Portal beam @ both Portal beam @ both
column Tie beam column
FOR CONSTRUCTION

AS-BUILT

MSIL NEW FACTORY PROJECT


SONIPAT (PACKAGE-01)
SECTION
A) This is for information:-
MATCH LINE <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE. MARUTI SUZUKI INDIA LTD.

<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark. TCE.12648C-3010-SPCL-PRS-171
<>However for the timeline interest of the project, TCE herewith approving this drawing with CONSULTING ENGINEERS LIMITED
PUNE
Make vertical and diagonal comments.
member's uniform spacing <>SPCL to submit the correct record purpose drawings after incorporating all our comments.

B) COMMENTS NOT INCORPORATED IN THE DRAWING:-


TYP SECTIONS
Refer Comments marked in the drawing.
DEL-1664-001-C-SL-017
C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
<> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
<> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.

N
W
<> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
<> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).

E
<> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown Rohit Digitally signed

Show grid 2 column with


by Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01

in drawings.
dimension.
<> Staircase design calculations & details of same in drawing are not yet submitted.
<> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
RCC Column, <> Roof plan showing gutter and downtake location. SHAPOORJI PALLONJI & CO. PVT. LTD.
shown in hatch <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit,
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
framed openings, connection bolts and screw details, etc shall be submitted. NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-171
Refer comments from Sheet number 171.
MATCH LINE

KEY PLAN:
Bracing (Typical)
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

SECTION
MATCH LINE

FOR REFERENCE
7000mm MATCH LINE
FOR ESTIMATION

FOR APPROVAL

CONTRACT

FOR TENDER

FOR CONSTRUCTION

AS-BUILT

SECTION MSIL NEW FACTORY PROJECT


SONIPAT (PACKAGE-01)
A) This is for information:-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
MATCH LINE <>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark. MARUTI SUZUKI INDIA LTD.
<>However for the timeline interest of the project, TCE herewith approving this drawing with
2 comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments. CONSULTING ENGINEERS LIMITED
TCE.12648C-3010-SPCL-PRS-172 PUNE
B) COMMENTS NOT INCORPORATED IN THE DRAWING:-
Refer Comments marked in the drawing.

C) MISSING DETAILS NOT YET RECEIVED IN DRAWING- TYP SECTIONS

Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
DEL-1664-001-C-SL-018
Add expansion ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
joint details Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).

N
W
Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown in
drawings.

E
Mention Truss Staircase design calculations & details of same in drawing are not yet submitted.
type. (Typical) Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
Roof plan showing gutter and downtake location.
Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, framed
openings, connection bolts and screw details, etc shall be submitted. SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-172
For all typical observations, please see our KEY PLAN:
comments in the weld shop drawing and press
KMP HIGHWAY

shop previous commented sheets. GATE GATE GATE


60m wide road
GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

Check this
member in STAAD. SECTION
<>Refer attached
<>Show all Critical dimension. snap below.
SECTION <> Refer previous sheet for typical
comments.

Member's size <> Dead Load on joist shall be (Concrete thickness above
should be in true sheet crest +1.5 floor finish+ water proofing)
scale. (Typical) <> Live load applied in STAAD does not match the load
requirement of 500kg/sqm.Check and update.
<>Update STAAD accordingly.
Gutter and
downtake?

Height?
Level?

FOR REFERENCE
Column type and size?
Size?
FOR ESTIMATION
Level? A) This is for information:-
SECTION Bottom of base plate? <>This is the 1st resubmission submitted by SPCL for review purpose received to FOR APPROVAL
Mention size TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this
resubmission and drawing is not up to the mark.
CONTRACT
SECTION <>However for the timeline interest of the project, TCE herewith approving this
For all typical observations, previous commented sheets. drawing with comments. FOR TENDER
TCE.12648-3010-SPCL-PRS-173 <>SPCL to submit the correct record purpose drawings after incorporating all our
comments.
FOR CONSTRUCTION
B) COMMENTS NOT INCORPORATED IN THE DRAWING:-
Refer Comments marked in this drawing.
AS-BUILT
Add scrap yard and lean to between 3-5 details. C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
> Grid 13 to 2a Connection design calculations & details of same in drawing are MSIL NEW FACTORY PROJECT
not yet submitted. SONIPAT (PACKAGE-01)
> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag
rod layout not shown in drawings.
> Staircase design calculations & details of same in drawing are not yet MARUTI SUZUKI INDIA LTD.
submitted.
> Deck slab, Deck sheet design calculations & details of same in drawing are not
yet submitted. CONSULTING ENGINEERS LIMITED
> Roof plan showing gutter and downtake location. PUNE
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping,
flashing, trim, soffit, framed openings, connection bolts and screw details, etc
shall be submitted.
TYP SECTIONS

Mention column number. DEL-1664-001-C-SL-019

N
Bottom of base plate?

W
SECTION

E
Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided and the latest
Indian Standard Codes of design. Contractor shall also ensure that all optimization opportunities in design are explored
SHAPOORJI PALLONJI & CO. PVT. LTD.
and adopted. Contractor shall be responsible and shall provide the stability certificate for the structure. 7TH FLOOR, KANCHANJUNGA BUILDING,
Shall be ensured by the contractor that these comments are incorporated in the subsequent working & submittals. BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001

MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-173
Size is not matching with STAAD.
Why Jack beams are required in the
this position?

KEY PLAN:
Toilet block KMP HIGHWAY

Check the requirement of this


column and its position.
here, check LAGOON
GATE GATE GATE
60m wide road
GATE GATE GATE GATE

the

GATE
arrangement

GATE
CANAL
WATER
TANK

Dim?

GATE
60m wide road
accordingly.

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

C) MISSING DETAILS
NOT YET RECEIVED IN
DRAWING-
<> Refer mail dated
14-01-2023, sent to
SPCL about missing
details in drawings.
<> ANCHOR BOLT A) This is for information:-
design and detail <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
drawings from Grid 14 <>But it is observed that some of TCE comments are not yet incorporated in this
to 2a. resubmission and drawing is not up to the mark.
<> Grid 13 to 2a <>However for the timeline interest of the project, TCE herewith approving this
Connection design drawing with comments.
calculations & details <>SPCL to submit the correct record purpose drawings after incorporating all our
of same in drawing are comments.
not yet submitted.
<> Missing Levels & B) COMMENTS NOT INCORPORATED IN THE DRAWING:- Truss 6A
Dimensions. (Like clear Refer Comments marked in this drawing.
height/dimension &
Top of structure).
<> Purlin Layout & all
Girt elevations (Side Truss 6A location
wall and gable end in STAAD, update
framing) with sag rod section drawing FOR REFERENCE
layout not shown in accordingly.
drawings.
<> Staircase design FOR ESTIMATION
calculations & details
of same in drawing are
not yet submitted. Truss 9B FOR APPROVAL
<> Deck slab, Deck Not found in STAAD.
sheet design Kindly check and
calculations & details update. CONTRACT
of same in drawing are
not yet submitted. FOR TENDER
<> Roof plan showing
gutter and downtake
location. FOR CONSTRUCTION
<> Sheeting drawings
showing Sheeting
lines, levels, height, AS-BUILT
Sheet lapping,
flashing, trim, soffit,
framed openings,
connection bolts and MSIL NEW FACTORY PROJECT
screw details, etc shall SONIPAT (PACKAGE-01)
be submitted.

MARUTI SUZUKI INDIA LTD.

CONSULTING ENGINEERS LIMITED


PUNE

TRUSS LVL PLAN

DEL-1664-001-C-SL-006

TCE.12648C-3010-SPCL-PRS-160

N
W
Dim? Dim? Check column position, shall

E
be at grid center.
JACK BEAM SCHEDULE:-
Arrangement is
TRUSS LVL PLAN not clear.
SHAPOORJI PALLONJI & CO. PVT. LTD.
Why is Jack beam required in the this Spacing? 7TH FLOOR, KANCHANJUNGA BUILDING,
position? BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001

Rohit Digitally signed


by Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01 <>Sizes are not matching with STAAD. MSIL-KH-SPCL-PRESS (A+B)-TRUSS-160
<>All Jack beam deflection shall be checked by Span/240.
KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

C34
LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

C35

C36
**
Additional beam is required. The
bottom of the additional beam must
be flush with the bottom of the
chord.
<>Check with MSIL for the exact
location.
<>Loading shall be as per Process
load drawing provided.

FOR REFERENCE

FOR ESTIMATION
C36
FOR APPROVAL

CONTRACT

FOR TENDER

FOR CONSTRUCTION

AS-BUILT

MSIL NEW FACTORY PROJECT


SONIPAT (PACKAGE-01)

MARUTI SUZUKI INDIA LTD.

CONSULTING ENGINEERS LIMITED


PUNE

TRUSS BOTTOM CHORD BRACING PLAN

DEL-1664-001-C-SL-007
TCE.12648C-3010-SPCL-PRS-161

N
W
S

E
A) This is for information:- C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE. <> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
drawing is not up to the mark. <> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
BOTTOM CHORD BRACING PLAN <>However for the timeline interest of the project, TCE herewith approving this drawing with <> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure). Rohit byDigitally signed
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
comments. <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown in
Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01

BARAKHAMBA ROAD, CON NAUGHT PLACE,


**As per MSIL comments <>SPCL to submit the correct record purpose drawings after incorporating all our comments. drawings. NEW DELHl-110001

dated 23-01-2023 <> Staircase design calculations & details of same in drawing are not yet submitted.
MSIL-KH-SPCL-PRESS (A+B)-TRUSS-161
B) COMMENTS NOT INCORPORATED IN THE DRAWING:- <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
C34-Add skylight cutout. <> Roof plan showing gutter and downtake location.
C35-Remove the bottom chord plan bracing, since there are ducting lines, to avoid fouling. <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, framed openings,
C36-Add bracing as marked. connection bolts and screw details, etc shall be submitted.
C) MISSING
DETAILS NOT YET
RECEIVED IN
DRAWING-
Arrangement is not clear
<> Refer mail dated
14-01-2023, sent to
KEY PLAN:
SPCL about missing KMP HIGHWAY

details in drawings.
<> ANCHOR BOLT
60m wide road
GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
design and detail
drawings from Grid

GATE
CANAL
WATER
TANK

14 to 2a.

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

<> Grid 13 to 2a

GATE
LAGOON

Connection design LAGOON

calculations &
GATE GATE GATE GATE GATE GATE GATE GATE
60m wide road

details of same in
drawing are not yet
submitted.
<> Missing Levels &
Dimensions. (Like
clear height/
dimension & Top of
structure).
<> Purlin Layout &
all Girt elevations
(Side wall and
gable end framing)
with sag rod layout
not shown in
drawings.
<> Staircase design
calculations &
details of same in
drawing are not yet
submitted.
<> Deck slab, Deck
sheet design
calculations &
details of same in
drawing are not yet
submitted.
<> Roof plan
showing gutter and
downtake location.
<> Sheeting
FOR REFERENCE
drawings showing
Sheeting lines,
levels, height, FOR ESTIMATION
Sheet lapping,
flashing, trim,
soffit, framed FOR APPROVAL
openings,
connection bolts
and screw details, CONTRACT
etc shall be
submitted.
FOR TENDER

FOR CONSTRUCTION
Extra Erection Note: The installation/
Erection of trusses and bracing above AS-BUILT
all Pits must be planned after placing
the machine.
MSIL NEW FACTORY PROJECT
SONIPAT (PACKAGE-01)

Top chord bracing is


missing.
MARUTI SUZUKI INDIA LTD.

CONSULTING ENGINEERS LIMITED


PUNE

TRUSS TOP CHORD BRACING PLAN

TCE.12648C-3010-SPCL-PRS-162 DEL-1664-001-C-SL-008

N
W
S

E
A) This is for information:-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and SHAPOORJI PALLONJI & CO. PVT. LTD.
Rohit Digitally signed

drawing is not up to the mark.


by Rohit Bhagat

Bhagat 17:57:12 +05'30'


Date: 2023.02.01
7TH FLOOR, KANCHANJUNGA BUILDING,
TOP CHORD BRACING PLAN <>However for the timeline interest of the project, TCE herewith approving this drawing with BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments. MSIL-KH-SPCL-PRESS (A+B)-TRUSS-162

B) COMMENTS NOT INCORPORATED IN THE DRAWING:-


Refer comments marked in this drawing.
KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

LAGOON

GATE GATE GATE GATE GATE GATE GATE GATE


60m wide road

C) MISSING DETAILS
NOT YET RECEIVED IN
DRAWING-
<> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
<> ANCHOR BOLT design
and detail drawings from
Grid 14 to 2a.
<> Grid 13 to 2a
Connection design
calculations & details of
same in drawing are not
yet submitted.
<> Missing Levels &
Dimensions. (Like clear FOR REFERENCE
height/dimension & Top
of structure).
<> Purlin Layout & all FOR ESTIMATION
Girt elevations (Side wall
and gable end framing)
with sag rod layout not
FOR APPROVAL
shown in drawings.
<> Staircase design CONTRACT
calculations & details of
same in drawing are not
yet submitted. FOR TENDER
<> Deck slab, Deck sheet Rohit Digitally signed
by Rohit Bhagat

Bhagat 22:01:34 +05'30'


Date: 2023.01.17

design calculations &


details of same in FOR CONSTRUCTION
drawing are not yet
submitted.
<> Roof plan showing AS-BUILT
gutter and downtake
location.
<> Sheeting drawings
Refer our mail showing Sheeting lines, MSIL NEW FACTORY PROJECT
dated 18-12-2022. levels, height, Sheet SONIPAT (PACKAGE-01)
lapping, flashing, trim,
soffit, framed openings,
connection bolts and
screw details, etc shall MARUTI SUZUKI INDIA LTD.

be submitted.

CONSULTING ENGINEERS LIMITED


PUNE

ROOF MONITORING BRACING PLAN

DEL-1664-001-C-SL-009

TCE.12648C-3010-SPCL-PRS-163

N
W
<>Refer mail Dated -18-12-2022 for changes in
roof monitor. 11.5m

E
<>Extend the roof monitor as shown, 3500 mm
from the end of the roof monitor to the sheeting A) This is for information:-
out. (Typical) <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark. SHAPOORJI PALLONJI & CO. PVT. LTD.
ROOF MONITOR TOP BRACING PLAN 7TH FLOOR, KANCHANJUNGA BUILDING,
<>However for the timeline interest of the project, TCE herewith approving this drawing with Rohit Digitally signed
by Rohit Bhagat
BARAKHAMBA ROAD, CON NAUGHT PLACE,
Bhagat 17:57:12 +05'30'
Date: 2023.02.01

comments. NEW DELHl-110001

<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
MSIL-KH-SPCL-PRESS (A+B)-TRUSS-163

B) COMMENTS NOT INCORPORATED IN THE DRAWING:-


Refer comments marked in this drawing.
KEY PLAN:
KMP HIGHWAY

60m wide road


GATE GATE GATE GATE GATE GATE GATE

LAGOON

GATE
GATE
CANAL
WATER
TANK

GATE
60m wide road

45m wide road


FINISHED CAR PARKING AREA

GATE
LAGOON

A) This is for information:- GATE GATE GATE GATE GATE GATE


LAGOON

GATE GATE

<>This is the 1st resubmission


60m wide road

submitted by SPCL for review


purpose received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
Refer comments marked in
this drawing.

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
Typical > ANCHOR BOLT design and
<> Include a lateral arrangement for detail drawings from Grid 14 FOR REFERENCE
Trust load transfer and for stability. to 2a.
> Grid 13 to 2a Connection
design calculations & details FOR ESTIMATION
of same in drawing are not
yet submitted.
> Missing Levels & FOR APPROVAL
Dimensions. (Like clear
height/dimension & Top of
structure). CONTRACT
> Purlin Layout & all Girt
elevations (Side wall and
gable end framing) with sag
FOR TENDER
rod layout not shown in
drawings. FOR CONSTRUCTION
> Staircase design TCE.12648C-3010-SPCL-PRS-186
calculations & details of same
in drawing are not yet AS-BUILT
submitted.
> Deck slab, Deck sheet
design calculations & details
of same in drawing are not MSIL NEW FACTORY PROJECT
yet submitted. SONIPAT (PACKAGE-01)
> Roof plan showing gutter
and downtake location. Digitally signed
Rohit byDate:Rohit Bhagat
Bhagat 2023.02.01
> Sheeting drawings showing 18:58:45 +05'30'

Sheeting lines, levels, height,


MARUTI SUZUKI INDIA LTD.
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw CONSULTING ENGINEERS LIMITED
details, etc shall be PUNE
submitted.

CRANE BEAM LEVEL PLAN

DEL-1664-001-C-SL-032

N
W
CRANE BEAM LEVEL PLAN

E
CRANE BEAM SCHEDULE:-

SHAPOORJI PALLONJI & CO. PVT. LTD.


7TH FLOOR, KANCHANJUNGA BUILDING,
Submit STAAD and Design BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
consideration Data for record.
MSIL-KH-SPCL-PRESS (A+B)-CRB-186