this resubmission and
GATE
CANAL
WATER
drawing is not up to
TANK
GATE
60m wide road
GATE
LAGOON
timeline interest of
GATE GATE GATE GATE GATE GATE GATE GATE
60m wide road
B) COMMENTS NOT
INCORPORATED IN
THE DRAWING:-
Refer comments
marked in this
Notes- drawing.
Contractor shall ensure that, the Design , Loading and Drawings are in compliance
with the project DBR provided and the latest Indian Standard Codes of design. C) MISSING DETAILS
NOT YET RECEIVED IN
Contractor shall also ensure that all optimization opportunities in design are
DRAWING-
explored and adopted. Contractor shall be responsible and shall provide the stability > Refer mail dated
certificate for the structure. 14-01-2023, sent to
Shall be ensured by the contractor that these comments are incorporated in the SPCL about missing
details in drawings.
subsequent working & submittals. > ANCHOR BOLT
design and detail
drawings from Grid
14 to 2a.
> Grid 13 to 2a
Connection design
calculations & details FOR REFERENCE
of same in drawing
are not yet
submitted.
FOR ESTIMATION
> Missing Levels &
Dimensions. (Like FOR APPROVAL
clear height/
dimension & Top of
TCE.12648C-3010-SPCL-PRS-155 structure). CONTRACT
> Purlin Layout & all
Girt elevations (Side
wall and gable end FOR TENDER
framing) with sag rod
layout not shown in
drawings. FOR CONSTRUCTION
> Staircase design
calculations & details
Rohit Digitally signed
by Rohit Bhagat of same in drawing AS-BUILT
Bhagat 17:57:12 +05'30'
Date: 2023.02.01
N
W
UP
Add details
E
COLUMN SCHEDULE:-
<>Please take care this in Pile and pile cap <>Please take care this in Pile and pile cap drawing. architectural drawing-R0, check and
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
drawing. <>Column Orientation in STAAD is wrong, check and update update.
MSIL-KH-SPCL-PRESS (A+B)-COLUMN-LYT-155
<>Column Orientation in STAAD is wrong,
check and update Canopy 5.1m wide
KEY PLAN:
KMP HIGHWAY
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
C1
LAGOON
C2
GATE GATE GATE GATE GATE GATE GATE GATE
60m wide road
B) COMMENTS NOT
950** INCORPORATED IN THE
DRAWING:-
C1-Staircase location is not
matching with the latest
architectural drawing.
C2-Show Cross section with
all details & dimension.
DEL-1664-001-C-SL-002
N
W
S
E
Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided
and the latest Indian Standard Codes of design. Contractor shall also ensure that all optimization
SHAPOORJI PALLONJI & CO. PVT. LTD.
1st MEZZANINE PLAN AT LVL+3300 opportunities in design are explored and adopted. Contractor shall be responsible and shall provide the 7TH FLOOR, KANCHANJUNGA BUILDING,
** As per MSIL Comments dated stability certificate for the structure. BARAKHAMBA ROAD, CON NAUGHT PLACE,
23-01-2023 Shall be ensured by the contractor that these comments are incorporated in the subsequent working & NEW DELHl-110001
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
GATE GATE
resubmission submitted by
SPCL for review purpose
received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
C2 herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C2-Show Cross section with
all details & dimension.
DEL-1664-001-C-SL-003
N
W
S
E
2nd MEZZANINE PLAN AT LVL+6500
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
MSIL-KH-SPCL-PRESS (A+B)-2ND-MEZZANINE-157
KEY PLAN:
KMP HIGHWAY
LAGOON
GATE
GATE
C3
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C3-Catwalk location is not
matching with the Latest
architectural drawing.
C4-What are CB1, CB2, and
CB3? Define abbreviations
N
W
C3
E
CRANE CATWALK LEVEL PLAN AT 11.5M
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
MSIL-KH-SPCL-PRESS (A+B)-CATWALK-158
A) This is for information:-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
C10
C7 KEY PLAN:
KMP HIGHWAY
Sheeting
LAGOON
GATE
GATE
CANAL
WATER
TANK
Dim.,?? C9
GATE
60m wide road
C11
Dim.,??
GATE
LAGOON
GATE GATE
DN
C5 (Typical)
C8
TCE.12648C-3010-SPCL-PRS-159
FOR REFERENCE
shown in drawings.
by Rohit Bhagat
Bhagat
Date: 2023.01.31
(Typical)
19:26:02 +05'30'
> Staircase design calculations & details of same in drawing are not yet submitted. FOR CONSTRUCTION
> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted. C8-Show Skylight & Air washer,
> Roof plan showing gutter and downtake location. exact location shall be as per
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, Latest architectural drawing and
add arrangement detail for AS-BUILT
framed openings, connection bolts and screw details, etc shall be submitted.
review.
C9-Show Toilet Block, location
shall be as per Architectural
MSIL NEW FACTORY PROJECT
drawing R0.
C10-Show sheeting out to out SONIPAT (PACKAGE-01)
dimension (Typical).
C11-Check Gutter slope and
<>Refer mail Dated -18-12-2022 for changes in arrow direction. (Typical)
roof monitor. MARUTI SUZUKI INDIA LTD.
ROOF PLAN
DEL-1664-001-C-SL-005
N
W
Width of Roof monitor shall
be 7.0m, As per MSIL
DN
E
Comment dated 23-01-2023)
2m wide Canopy
LEGEND:-
dim.,?? dim.,?? SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
Update detail as per Architectural BARAKHAMBA ROAD, CON NAUGHT PLACE,
drawing (R0). NEW DELHl-110001
MSIL-KH-SPCL-PRESS (A+B)-ROOF-PLAN-159
C12
KEY PLAN:
KMP HIGHWAY
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
MATCH LINE
GATE
LAGOON
LAGOON
Check text
N
TYP TRUSS SECTION - 1 soffit, framed openings,
W
connection bolts and screw
details, etc shall be submitted.
E
Contractor shall ensure that, the Design a, Loading nd Drawings are in
compliance with the project DBR provided and the latest Indian <>Show pipe rack, ducting and cable tray supporting arrangement with all
Standard Codes of design. Contractor shall also ensure that all
details and submit design calculation for review.
optimization opportunities in design are explored and adopted.
Contractor shall be responsible and shall provide the stability SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
certificate for the structure. BARAKHAMBA ROAD, CON NAUGHT PLACE,
shall be ensured by the contractor that these comments are NEW DELHl-110001
incorporated in the subsequent working & submittals.
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-164
C17 (Typical) MATCH LINE
KEY PLAN:
KMP HIGHWAY
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
Digitally signed
Rohit byDate:Rohit Bhagat
Bhagat 2023.01.31
20:44:39 +05'30'
TCE.12648C-3010-SPCL-PRS-165
TYP TRUSS SECTION - 2
MATCH LINE
Rohit Digitally
FOR REFERENCE
signed
by Rohit Bhagat
FOR ESTIMATION
C16
FOR APPROVAL
CONTRACT
FOR TENDER
C15
FOR CONSTRUCTION
AS-BUILT
N
incorporating all our comments.
W
submitted.
B) COMMENTS NOT <> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
E
INCORPORATED IN THE <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not
DRAWING:- shown in drawings.
C15-Lean to between grids 3-12, <> Staircase design calculations & details of same in drawing are not yet submitted. Contractor shall ensure that, the Design a, Loading nd Drawings are in compliance with the
show with all details. <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet project DBR provided and the latest Indian Standard Codes of design. Contractor shall also
ensure that all optimization opportunities in design are explored and adopted. Contractor SHAPOORJI PALLONJI & CO. PVT. LTD.
C16-Clear 1500mm (Typical). submitted. 7TH FLOOR, KANCHANJUNGA BUILDING,
C17-Show Exhaust fan <> Roof plan showing gutter and downtake location. shall be responsible and shall provide the stability certificate for the structure. BARAKHAMBA ROAD, CON NAUGHT PLACE,
supporting detail, bracing should <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, shall be ensured by the contractor that these comments are incorporated in the subsequent NEW DELHl-110001
be planned accordingly. soffit, framed openings, connection bolts and screw details, etc shall be submitted. working & submittals.
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-165
KEY PLAN:
KMP HIGHWAY
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
C20
C18
6250mm clear
3050mm clear
MATCH LINE
FOR REFERENCE
FOR ESTIMATION
FOR APPROVAL
CONTRACT
FOR TENDER
FOR CONSTRUCTION
AS-BUILT
C19
N
with comments.
W
<>SPCL to submit the correct <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
record purpose drawings after <> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet
E
incorporating all our comments. submitted.
<> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
B) COMMENTS NOT <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not Rohit Digitally signed
by Rohit Bhagat
C19-At grid 14, there is no shed. <> Roof plan showing gutter and downtake location. 05.01.2023, Still some members are failing and need MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-166
Check and update. <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, to optimize.
C20-Show Deck slab line. soffit, framed openings, connection bolts and screw details, etc shall be submitted.
<>Keep utilization ratio around 0.9
MATCH LINE A) This is for information:-
<>This is the 1st resubmission
submitted by SPCL for review KEY PLAN:
C20 purpose received to TCE. KMP HIGHWAY
C21
<>But it is observed that some GATE GATE GATE
60m wide road
GATE GATE GATE GATE
GATE
incorporated in this
GATE
resubmission and drawing is
CANAL
WATER
TANK
GATE
60m wide road
not up to the mark.
GATE
LAGOON
B) COMMENTS NOT
TYP TRUSS SECTION -4 INCORPORATED IN THE
DRAWING:-
C18-Ensure connection
stability (Typical)
MATCH LINE C19-At grid 14, there is no
shed. Check and update.
C20-Show Deck slab line.
C21-Jack Truss chords size are
larger than Main truss chords,
draw all sizes in true scale.
(typical)
C22-Should be equal spacing
between verticals, check and
update. (Typical)
C23-Show full section.
C24-1500mm min distance
require between Girts (typical
requirement in all frame).
DEL-1664-001-C-SL-013
N
W
S
E
Rohit Digitally signed
by Rohit Bhagat
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-167
MATCH LINE
KEY PLAN:
KMP HIGHWAY
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
C26
GATE
LAGOON
LAGOON
C25
MATCH LINE
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C25-All vertical and diagonal
member's spacing should be
uniform. (Typical).
C26-Weld Substation,
update wall condition
accordingly.(Typical
comment)
TCE.12648C-3010-SPCL-PRS-168 C27-Mention Grid with truss
type (typical).
C28-Refer drawing number
160 for Truss type 6A.Add
section of Truss type 6A.
N
W
S
E
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
TYP TRUSS SECTION -7
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-168
Check loading application some loads are missing, like Live &
dead load. Ensure all loads are applied as per DBR provided
and Indian design Code. (typical)
MATCH LINE
KEY PLAN:
Sheeting?
KMP HIGHWAY
LAGOON
GATE
C29
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
B) COMMENTS NOT
INCORPORATED IN THE DRAWING:-
C29-Staircase at this location, check
and update.
C30-Mention Grid, shall be as per
Latest Architectural drawing.
C31-Remove Purlin from Grid 9
section, since there is a roof monitor
above. (typical)
FOR REFERENCE
TYP TRUSS SECTION -8
MATCH LINE
FOR ESTIMATION
FOR APPROVAL
CONTRACT
FOR TENDER
FOR CONSTRUCTION
AS-BUILT
TRUSS-11
C31 C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet MSIL NEW FACTORY PROJECT
submitted. SONIPAT (PACKAGE-01)
TYP TRUSS SECTION -9 > Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout
not shown in drawings.
> Staircase design calculations & details of same in drawing are not yet submitted. MARUTI SUZUKI INDIA LTD.
MATCH LINE > Deck slab, Deck sheet design calculations & details of same in drawing are not yet
submitted.
> Roof plan showing gutter and downtake location. CONSULTING ENGINEERS LIMITED
PUNE
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim,
soffit, framed openings, connection bolts and screw details, etc shall be submitted.
TYP SECTIONS
DEL-1664-001-C-SL-015
N
W
S
E
TRUSS-11
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
TYP SECTIONS
DEL-1664-001-C-SL-016
N
W
S
E
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-170
STAAD Comment-
<>Wind load is missing in the stubs.
Check, can we
<>Release moment at base.
remove this
<>Effective length factor shall be 2.
Provide Beam bracing? (typical)
MATCH LINE
KEY PLAN:
1500mm minimum (clear)
KMP HIGHWAY
Dim?
60m wide road
GATE GATE GATE GATE GATE GATE GATE
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
Bracing (typical)
GATE
LAGOON
LAGOON
Tie beam @
both column
3050mm clear
Dim? (Typical)
SECTION
MATCH LINE
Refer our mail
dated 18-12-2022.
<>Out to Out
Width of roof
monitor is 11.5m.
Show joist
FOR ESTIMATION
spacing. 7000mm
FOR APPROVAL
Dim?
CONTRACT
AS-BUILT
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark. TCE.12648C-3010-SPCL-PRS-171
<>However for the timeline interest of the project, TCE herewith approving this drawing with CONSULTING ENGINEERS LIMITED
PUNE
Make vertical and diagonal comments.
member's uniform spacing <>SPCL to submit the correct record purpose drawings after incorporating all our comments.
N
W
<> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
<> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
E
<> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown Rohit Digitally signed
in drawings.
dimension.
<> Staircase design calculations & details of same in drawing are not yet submitted.
<> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
RCC Column, <> Roof plan showing gutter and downtake location. SHAPOORJI PALLONJI & CO. PVT. LTD.
shown in hatch <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit,
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
framed openings, connection bolts and screw details, etc shall be submitted. NEW DELHl-110001
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-171
Refer comments from Sheet number 171.
MATCH LINE
KEY PLAN:
Bracing (Typical)
KMP HIGHWAY
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
SECTION
MATCH LINE
FOR REFERENCE
7000mm MATCH LINE
FOR ESTIMATION
FOR APPROVAL
CONTRACT
FOR TENDER
FOR CONSTRUCTION
AS-BUILT
Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
DEL-1664-001-C-SL-018
Add expansion ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
joint details Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
N
W
Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown in
drawings.
E
Mention Truss Staircase design calculations & details of same in drawing are not yet submitted.
type. (Typical) Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
Roof plan showing gutter and downtake location.
Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, framed
openings, connection bolts and screw details, etc shall be submitted. SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-172
For all typical observations, please see our KEY PLAN:
comments in the weld shop drawing and press
KMP HIGHWAY
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
Check this
member in STAAD. SECTION
<>Refer attached
<>Show all Critical dimension. snap below.
SECTION <> Refer previous sheet for typical
comments.
Member's size <> Dead Load on joist shall be (Concrete thickness above
should be in true sheet crest +1.5 floor finish+ water proofing)
scale. (Typical) <> Live load applied in STAAD does not match the load
requirement of 500kg/sqm.Check and update.
<>Update STAAD accordingly.
Gutter and
downtake?
Height?
Level?
FOR REFERENCE
Column type and size?
Size?
FOR ESTIMATION
Level? A) This is for information:-
SECTION Bottom of base plate? <>This is the 1st resubmission submitted by SPCL for review purpose received to FOR APPROVAL
Mention size TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this
resubmission and drawing is not up to the mark.
CONTRACT
SECTION <>However for the timeline interest of the project, TCE herewith approving this
For all typical observations, previous commented sheets. drawing with comments. FOR TENDER
TCE.12648-3010-SPCL-PRS-173 <>SPCL to submit the correct record purpose drawings after incorporating all our
comments.
FOR CONSTRUCTION
B) COMMENTS NOT INCORPORATED IN THE DRAWING:-
Refer Comments marked in this drawing.
AS-BUILT
Add scrap yard and lean to between 3-5 details. C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
> Grid 13 to 2a Connection design calculations & details of same in drawing are MSIL NEW FACTORY PROJECT
not yet submitted. SONIPAT (PACKAGE-01)
> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag
rod layout not shown in drawings.
> Staircase design calculations & details of same in drawing are not yet MARUTI SUZUKI INDIA LTD.
submitted.
> Deck slab, Deck sheet design calculations & details of same in drawing are not
yet submitted. CONSULTING ENGINEERS LIMITED
> Roof plan showing gutter and downtake location. PUNE
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping,
flashing, trim, soffit, framed openings, connection bolts and screw details, etc
shall be submitted.
TYP SECTIONS
N
Bottom of base plate?
W
SECTION
E
Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided and the latest
Indian Standard Codes of design. Contractor shall also ensure that all optimization opportunities in design are explored
SHAPOORJI PALLONJI & CO. PVT. LTD.
and adopted. Contractor shall be responsible and shall provide the stability certificate for the structure. 7TH FLOOR, KANCHANJUNGA BUILDING,
Shall be ensured by the contractor that these comments are incorporated in the subsequent working & submittals. BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
MSIL-KH-SPCL-PRESS (A+B)-SECTIONS-173
Size is not matching with STAAD.
Why Jack beams are required in the
this position?
KEY PLAN:
Toilet block KMP HIGHWAY
the
GATE
arrangement
GATE
CANAL
WATER
TANK
Dim?
GATE
60m wide road
accordingly.
GATE
LAGOON
LAGOON
C) MISSING DETAILS
NOT YET RECEIVED IN
DRAWING-
<> Refer mail dated
14-01-2023, sent to
SPCL about missing
details in drawings.
<> ANCHOR BOLT A) This is for information:-
design and detail <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
drawings from Grid 14 <>But it is observed that some of TCE comments are not yet incorporated in this
to 2a. resubmission and drawing is not up to the mark.
<> Grid 13 to 2a <>However for the timeline interest of the project, TCE herewith approving this
Connection design drawing with comments.
calculations & details <>SPCL to submit the correct record purpose drawings after incorporating all our
of same in drawing are comments.
not yet submitted.
<> Missing Levels & B) COMMENTS NOT INCORPORATED IN THE DRAWING:- Truss 6A
Dimensions. (Like clear Refer Comments marked in this drawing.
height/dimension &
Top of structure).
<> Purlin Layout & all
Girt elevations (Side Truss 6A location
wall and gable end in STAAD, update
framing) with sag rod section drawing FOR REFERENCE
layout not shown in accordingly.
drawings.
<> Staircase design FOR ESTIMATION
calculations & details
of same in drawing are
not yet submitted. Truss 9B FOR APPROVAL
<> Deck slab, Deck Not found in STAAD.
sheet design Kindly check and
calculations & details update. CONTRACT
of same in drawing are
not yet submitted. FOR TENDER
<> Roof plan showing
gutter and downtake
location. FOR CONSTRUCTION
<> Sheeting drawings
showing Sheeting
lines, levels, height, AS-BUILT
Sheet lapping,
flashing, trim, soffit,
framed openings,
connection bolts and MSIL NEW FACTORY PROJECT
screw details, etc shall SONIPAT (PACKAGE-01)
be submitted.
DEL-1664-001-C-SL-006
TCE.12648C-3010-SPCL-PRS-160
N
W
Dim? Dim? Check column position, shall
E
be at grid center.
JACK BEAM SCHEDULE:-
Arrangement is
TRUSS LVL PLAN not clear.
SHAPOORJI PALLONJI & CO. PVT. LTD.
Why is Jack beam required in the this Spacing? 7TH FLOOR, KANCHANJUNGA BUILDING,
position? BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
C34
LAGOON
C35
C36
**
Additional beam is required. The
bottom of the additional beam must
be flush with the bottom of the
chord.
<>Check with MSIL for the exact
location.
<>Loading shall be as per Process
load drawing provided.
FOR REFERENCE
FOR ESTIMATION
C36
FOR APPROVAL
CONTRACT
FOR TENDER
FOR CONSTRUCTION
AS-BUILT
DEL-1664-001-C-SL-007
TCE.12648C-3010-SPCL-PRS-161
N
W
S
E
A) This is for information:- C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE. <> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
drawing is not up to the mark. <> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
BOTTOM CHORD BRACING PLAN <>However for the timeline interest of the project, TCE herewith approving this drawing with <> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure). Rohit byDigitally signed
SHAPOORJI PALLONJI & CO. PVT. LTD.
7TH FLOOR, KANCHANJUNGA BUILDING,
comments. <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown in
Rohit Bhagat
dated 23-01-2023 <> Staircase design calculations & details of same in drawing are not yet submitted.
MSIL-KH-SPCL-PRESS (A+B)-TRUSS-161
B) COMMENTS NOT INCORPORATED IN THE DRAWING:- <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
C34-Add skylight cutout. <> Roof plan showing gutter and downtake location.
C35-Remove the bottom chord plan bracing, since there are ducting lines, to avoid fouling. <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, framed openings,
C36-Add bracing as marked. connection bolts and screw details, etc shall be submitted.
C) MISSING
DETAILS NOT YET
RECEIVED IN
DRAWING-
Arrangement is not clear
<> Refer mail dated
14-01-2023, sent to
KEY PLAN:
SPCL about missing KMP HIGHWAY
details in drawings.
<> ANCHOR BOLT
60m wide road
GATE GATE GATE GATE GATE GATE GATE
LAGOON
GATE
design and detail
drawings from Grid
GATE
CANAL
WATER
TANK
14 to 2a.
GATE
60m wide road
<> Grid 13 to 2a
GATE
LAGOON
calculations &
GATE GATE GATE GATE GATE GATE GATE GATE
60m wide road
details of same in
drawing are not yet
submitted.
<> Missing Levels &
Dimensions. (Like
clear height/
dimension & Top of
structure).
<> Purlin Layout &
all Girt elevations
(Side wall and
gable end framing)
with sag rod layout
not shown in
drawings.
<> Staircase design
calculations &
details of same in
drawing are not yet
submitted.
<> Deck slab, Deck
sheet design
calculations &
details of same in
drawing are not yet
submitted.
<> Roof plan
showing gutter and
downtake location.
<> Sheeting
FOR REFERENCE
drawings showing
Sheeting lines,
levels, height, FOR ESTIMATION
Sheet lapping,
flashing, trim,
soffit, framed FOR APPROVAL
openings,
connection bolts
and screw details, CONTRACT
etc shall be
submitted.
FOR TENDER
FOR CONSTRUCTION
Extra Erection Note: The installation/
Erection of trusses and bracing above AS-BUILT
all Pits must be planned after placing
the machine.
MSIL NEW FACTORY PROJECT
SONIPAT (PACKAGE-01)
TCE.12648C-3010-SPCL-PRS-162 DEL-1664-001-C-SL-008
N
W
S
E
A) This is for information:-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and SHAPOORJI PALLONJI & CO. PVT. LTD.
Rohit Digitally signed
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
LAGOON
C) MISSING DETAILS
NOT YET RECEIVED IN
DRAWING-
<> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
<> ANCHOR BOLT design
and detail drawings from
Grid 14 to 2a.
<> Grid 13 to 2a
Connection design
calculations & details of
same in drawing are not
yet submitted.
<> Missing Levels &
Dimensions. (Like clear FOR REFERENCE
height/dimension & Top
of structure).
<> Purlin Layout & all FOR ESTIMATION
Girt elevations (Side wall
and gable end framing)
with sag rod layout not
FOR APPROVAL
shown in drawings.
<> Staircase design CONTRACT
calculations & details of
same in drawing are not
yet submitted. FOR TENDER
<> Deck slab, Deck sheet Rohit Digitally signed
by Rohit Bhagat
be submitted.
DEL-1664-001-C-SL-009
TCE.12648C-3010-SPCL-PRS-163
N
W
<>Refer mail Dated -18-12-2022 for changes in
roof monitor. 11.5m
E
<>Extend the roof monitor as shown, 3500 mm
from the end of the roof monitor to the sheeting A) This is for information:-
out. (Typical) <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark. SHAPOORJI PALLONJI & CO. PVT. LTD.
ROOF MONITOR TOP BRACING PLAN 7TH FLOOR, KANCHANJUNGA BUILDING,
<>However for the timeline interest of the project, TCE herewith approving this drawing with Rohit Digitally signed
by Rohit Bhagat
BARAKHAMBA ROAD, CON NAUGHT PLACE,
Bhagat 17:57:12 +05'30'
Date: 2023.02.01
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
MSIL-KH-SPCL-PRESS (A+B)-TRUSS-163
LAGOON
GATE
GATE
CANAL
WATER
TANK
GATE
60m wide road
GATE
LAGOON
GATE GATE
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
Refer comments marked in
this drawing.
DEL-1664-001-C-SL-032
N
W
CRANE BEAM LEVEL PLAN
E
CRANE BEAM SCHEDULE:-