<>Column orientation in STAAD are not matching with the A) This is for

drawing / architectural drawing, check and correct. information:-


<>Loading applications are missing and need to be incorporated. <>This is the 1st
resubmission
submitted by SPCL for
review purpose
received to TCE.
<>But it is observed KEY PLAN:
that some of TCE
KMP HIGHWAY

comments are not GATE GATE GATE


60m wide road
GATE GATE GATE GATE

RCC Staircase yet incorporated in


LAGOON

GATE
this resubmission and

GATE
CANAL
WATER

drawing is not up to
TANK

GATE
60m wide road

45m wide road


the mark.
FINISHED CAR PARKING AREA

GATE
LAGOON

<>However for the LAGOON

timeline interest of
GATE GATE GATE GATE GATE GATE GATE GATE
60m wide road

the project, TCE


herewith approving
this drawing with
Check column comments.
<>SPCL to submit the
position, shall correct record
be at grid purpose drawings
center. after incorporating all
our comments.

B) COMMENTS NOT
INCORPORATED IN
THE DRAWING:-
Refer comments
marked in this
Notes- drawing.
Contractor shall ensure that, the Design , Loading and Drawings are in compliance
with the project DBR provided and the latest Indian Standard Codes of design. C) MISSING DETAILS
NOT YET RECEIVED IN
Contractor shall also ensure that all optimization opportunities in design are
DRAWING-
explored and adopted. Contractor shall be responsible and shall provide the stability > Refer mail dated
certificate for the structure. 14-01-2023, sent to
Shall be ensured by the contractor that these comments are incorporated in the SPCL about missing
details in drawings.
subsequent working & submittals. > ANCHOR BOLT
design and detail
drawings from Grid
14 to 2a.
> Grid 13 to 2a
Connection design
calculations & details FOR REFERENCE
of same in drawing
are not yet
submitted.
FOR ESTIMATION
> Missing Levels &
Dimensions. (Like FOR APPROVAL
clear height/
dimension & Top of
TCE.12648C-3010-SPCL-PRS-155 structure). CONTRACT
> Purlin Layout & all
Girt elevations (Side
wall and gable end FOR TENDER
framing) with sag rod
layout not shown in
drawings. FOR CONSTRUCTION
> Staircase design
calculations & details
Rohit Digitally signed
by Rohit Bhagat of same in drawing AS-BUILT
Bhagat 17:57:12 +05'30'
Date: 2023.02.01

are not yet


submitted.
> Deck slab, Deck
MSIL NEW FACTORY PROJECT
sheet design
calculations & details SONIPAT (PACKAGE-01)
of same in drawing
are not yet
submitted.
> Roof plan showing MARUTI SUZUKI INDIA LTD.

gutter and downtake


location.
CONSULTING ENGINEERS LIMITED
> Sheeting drawings PUNE
showing Sheeting
lines, levels, height,
Sheet lapping,
flashing, trim, soffit, COLUMN LAYOUT PLAN
framed openings,
connection bolts and DEL-1664-001-C-SL-001
screw details, etc
shall be submitted.

N
W
UP

Add details

E
COLUMN SCHEDULE:-

<>FFL= (-) 1.0m Check column position, shall


<>Column bottom of base plate shall be 300mm below FFL. be at grid center.
<> FFL= (-) 1.0m
<>Column bottom of base plate shall be <>Column position are not matching with Latest architectural drawing SHAPOORJI PALLONJI & CO. PVT. LTD.
STEEL COLUMN LAYOUT 300mm below FFL. (R0), check and update. Staircase location Shall be as per 7TH FLOOR, KANCHANJUNGA BUILDING,

<>Please take care this in Pile and pile cap <>Please take care this in Pile and pile cap drawing. architectural drawing-R0, check and
BARAKHAMBA ROAD, CON NAUGHT PLACE,
NEW DELHl-110001
drawing. <>Column Orientation in STAAD is wrong, check and update update.
MSIL-KH-SPCL-PRESS (A+B)-COLUMN-LYT-155
<>Column Orientation in STAAD is wrong,
check and update Canopy 5.1m wide