You are on page 1of 3

Date of

Est. Next
Maint. Last
Maintainance Item (DEC.2021) Interval Done
Due

LSA
LIFE BOAT
Boat’s shell inside and outside, grab lines, limit switches, metal fittings 1 W 25.DEC.21 01.JAN.22
Boat hoists and slips (view – control – grease) 1 W 25.DEC.21 01.JAN.22
Refill fuel-check lubs in crankshaft & gear box .Battery if fitted -recharge 1 W 25.DEC.21 01.JAN.22
Motor (run for 3 min.) gear box & gear box train engaging satisfactory 1 W 25.DEC.21 01.JAN.22
Quick release and on load release gear is properly completely reset in lock position. 1 W 25.DEC.21 01.JAN.22
Containers of: drinking water- small items-food rations –storm oil 1 W 25.DEC.21 01.JAN.22
Propeller blades and shaft bearing, grease bearings. 1 W 25.DEC.21 01.JAN.22
Rudder tiller, gudgeon , pintle, thouarts, seat belts if fitted 1 W 25.DEC.21 01.JAN.22
Lighting if fitted all lights to be tested. (navigation –search- cabin) 1 W 25.DEC.21 01.JAN.22
Lowering /Housing instructions posted readable under emergency lighting 1 W 25.DEC.21 01.JAN.22
Check for water oil accumulation in bilges and drain. 1 W 25.DEC.21 01.JAN.22
Weather and sea conditions permitting, l/boat to be removed from stowage position 1 W 25.DEC.21 01.JAN.22
Without any person on board to the extend necessary to verify proper operation of launching 25.DEC.21
1 W 01.JAN.22
appliances.
Weather and sea conditions permitting l/boat to be turned out without any persons on board 1 W 25.DEC.21 01.JAN.22
During l/b swing out verify free movement of moving parts and lubricate. (Ref.lub. diagram) 1 M 25.DEC.21 25.JAN.22
Check life boat equipment Replace drinking water in containers 1 M 25.DEC.21 25.JAN.22
In enclosed type l/b check: tightness of openings & emergency air supply if fitted 1 M 25.DEC.21 25.JAN.22
Embarkation ladder (Steps-Spreaders-Ropes-Shackles) 1 M 25.DEC.21 25.JAN.22
During L/B waterborne check: auto release mechanism. 3 M 25.DEC.21 25.MAR.22
: water sprinkler if fitted 3 M 25.DEC.21 25.MAR.22
Condition of grab lines and painters. 3 M 25.DEC.21 25.MAR.22
Condition of wooden gratings. 3 M 25.DEC.21 25.MAR.22
Engine fuel filter to be cleaned and fuel tank to be drained 3 M 25.DEC.21 25.MAR.22
Fuel tank to be emptied and fuel to be renewed 3 M 25.DEC.21 25.MAR.22
On load release mechanism if fitted. (By approved tech.) 1 Y  
       
RESUE BOAT      
Boat’s shell inside and outside, grab lines, limit switches, metal fittings 1 W 25.DEC.21 01.JAN.22
Boat hoists and slips (view – control – grease) 1 W 25.DEC.21 01.JAN.22
Refill fuel-check lubs in crankshaft & gear box .Battery if fitted -recharge 1 W 25.DEC.21 01.JAN.22
Boat’s shell inside and outside, grab lines, limit switches, metal fittings 1 W 25.DEC.21 01.JAN.22
Boat hoists and slips (view – control – grease) 1 W 25.DEC.21 01.JAN.22
Refill fuel-check lubs in crankshaft & gear box .Battery if fitted -recharge 1 W 25.DEC.21 01.JAN.22
Motor (run for 3 min.) gear box & gear box train engaging satisfactory 1 W 25.DEC.21 01.JAN.22
Quick release and on load release gear is properly completely reset in lock position. 1 W 25.DEC.21 01.JAN.22
Containers of: drinking water- small items-food rations –storm oil 1 W 25.DEC.21 01.JAN.22
Propeller blades and shaft bearing, grease bearings. 1 W 25.DEC.21 01.JAN.22
Rudder tiller, gudgeon , pintle, thouarts, seat belts if fitted 1 W 25.DEC.21 01.JAN.22
Lighting if fitted all lights to be tested. (navigation –search- cabin) 1 W 25.DEC.21 01.JAN.22
Lowering /Housing instructions posted readable under emergency lighting 1 W 25.DEC.21 01.JAN.22
Check for water oil accumulation in bilges and drain. 1 W 25.DEC.21 01.JAN.22
Weather and sea conditions permitting, R/boat to be removed from stowage position 1 W 25.DEC.21 01.JAN.22
Without any person on board to the extend necessary to verify proper operation of launching 25.DEC.21
01.JAN.22
appliances. 1 W
Weather and sea conditions permitting R/boat to be turned out without any persons on board 1 W 25.DEC.21 01.JAN.22
During R/B swing out verify free movement of moving parts and lubricate. (Ref.lub. diagram) 1 M 25.DEC.21 25.JAN.22
Check R/boat equipment 1 M 25.DEC.21 25.JAN.22
Embarkation ladder (Steps-Spreaders-Ropes-Shackles) 1 M 25.DEC.21 25.JAN.22
Condition of grab lines and painters. 3 M 25.DEC.21 25.MAR.22
Engine fuel filter to be cleaned and fuel tank to be drained 3 M 25.DEC.21 25.MAR.22
Fuel tank to be emptied and fuel to be renewed 3 M 25.DEC.21 25.MAR.22
annual inspection By approved tech 1 Y  
 

   
Lifeboats Launching Appliances      
Visual inspection 1 W 25.DEC.21 01.JAN.22
Brake handles moving freely up-down 1 W 25.DEC.21 01.JAN.22
During boats swing out, all moving parts to move freely. 1 M 25.DEC.21 25.JAN.22
Falls grippes and attachments lubricate shackles turnbuckles and other fittings 1 M 25.DEC.21 25.JAN.22
Lashing wire and attachments 1 M 25.DEC.21 25.JAN.22
Securing bolts and nuts 1 M 25.DEC.21 25.JAN.22
Proper operation of limit switches. 1 M 25.DEC.21 25.JAN.22
Winches proper operation 1 M 25.DEC.21 25.JAN.22
Remote control wires 3 M 25.DEC.21 25.MAR.22
During L/b waterborne swivels to move freely. Lubricate. 3 M 25.DEC.21 25.MAR.22
On load test of 1.1 times of life boat weight and its full complement (By approved tech.) 5 Y  
     
Life raft      
Condition of cradle 1 M 25.DEC.21 25.JAN.22
Condition of containers and water tight packing 1 M 25.DEC.21 25.JAN.22
Markings, Name, Plate, Date Serviced 1 M 25.DEC.21 25.JAN.22
Attached water tight tube with life raft I.D. 1 M 25.DEC.21 25.JAN.22
Condition of cradle 1 M 25.DEC.21 25.JAN.22
Condition of lashing 1 M 25.DEC.21 25.JAN.22
Condition of shackles, slip hook and turnbuckle. 1 M 25.DEC.21 25.JAN.22
Condition of weak ling or painter 1 M 25.DEC.21 25.JAN.22
Securing of release on deck 1 M 25.DEC.21 25.JAN.22
Serviced by approved servicing station (Solas III 20.8.1,2) 1 Y  
       
Emcy Generator      
Check oil, water and fuel & Run on test 1 W 25.DEC.21 01.JAN.22
       
Life buoys      
Positions according to LSA Plan. & Safety Equipment Inventory. 1 M 25.DEC.21 25.JAN.22
Wear and tear. – Retro reflecting tapes – Condition of lines & length. 1 M 25.DEC.21 25.JAN.22
Condition of distinguish paint and Markings 1 M 25.DEC.21 25.JAN.22
Self igniting lights operational. (water activated batteries if fitted valid) 1 M 25.DEC.21 25.JAN.22
MOB – Quick release 1 M 25.DEC.21 25.JAN.22
MOB - weight of life buoy (more than 4 kgrs) 1 M 25.DEC.21 25.JAN.22
MOB - length of light/smoke attachment 4 meters. 1 M 25.DEC.21 25.JAN.22
Condition of Imo reflecting signs. 1 M 25.DEC.21 25.JAN.22
       
Life jackets      
Number & location of life jackets according to LSA Plan & S. equipment inventory 1 M 25.DEC.21 25.JAN.22
Condition of cloth and straps 1 M 25.DEC.21 25.JAN.22
Attachments – whistle- lights 1 M 25.DEC.21 25.JAN.22
Condition of retro-reflecting material 1 M 25.DEC.21 25.JAN.22
Validity of batteries for light 1 M 25.DEC.21 25.JAN.22
       
TPA      
Stowed according to LSA plan and inventory. 1 M 25.DEC.21 25.JAN.22
Wear and tear 1 M 25.DEC.21 25.JAN.22
       
Immersion suit      
general Inspection 1 M 25.DEC.21 25.JAN.22
Annual inspection by approved specialist 1 Y  
       
Pyrotechnics      
general Inspection 1 M 25.DEC.21 25.JAN.22
Expire date 1 M 25.DEC.21 25.JAN.22
Condition of containers 1 M 25.DEC.21 25.JAN.22
Renewal 3 Y  
 
 
   
Line throwing appliance      
general Inspection 1 M 25.DEC.21 25.JAN.22
Expire date 1 M 25.DEC.21 25.JAN.22
Condition of containers 1 M 25.DEC.21 25.JAN.22
Renewal 3 Y  
       
SART      
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection/test by approved servicing company 1 Y  
battery renewal 3 Y 25.DEC.21 11-NOV-24
       
EPIRB      
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection by approved servicing company 1 Y  
battery renewal 5 Y  
       
Medical Oxygen Resuscitator      
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection by approved servicing company 1 Y  
HPT of bottles 5 Y  
       
Life Boat Air Cylinder      
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection by approved servicing company 1 Y  
HPTof bottles by approved servicing company 5 Y  
   
Emergency and Safety signs      
IMO reflecting signs are properly posted 1 M 25.DEC.21 25.JAN.22
Escape ways are clearly marked 1 M 25.DEC.21 25.JAN.22
Deck fittings (vent heads – ullaging tubes etc. ) are clearly identified 1 M 25.DEC.21 25.JAN.22
       
General Emergency Alarm System      
System to be activated from a different point. 1 W 25.DEC.21 01.JAN.22
Bells where fitted operational 1 W 25.DEC.21 01.JAN.22
Visual signals where fitted operational 1 W 25.DEC.21 01.JAN.22
       
Safety Lockers      
Proper inventory posted 1 M 25.DEC.21 25.JAN.22
Equipment stored in proper condition 1 M 25.DEC.21 25.JAN.22
No wasted equipment stored in the lockers 1 M 25.DEC.21 25.JAN.22