Life Boat: Maint. Interval Date of Last Done Est. Next Due
Life Boat: Maint. Interval Date of Last Done Est. Next Due
Est. Next
Maint. Last
Maintainance Item (DEC.2021) Interval Done
Due
LSA
LIFE BOAT
Boat’s shell inside and outside, grab lines, limit switches, metal fittings 1 W 25.DEC.21 01.JAN.22
Boat hoists and slips (view – control – grease) 1 W 25.DEC.21 01.JAN.22
Refill fuel-check lubs in crankshaft & gear box .Battery if fitted -recharge 1 W 25.DEC.21 01.JAN.22
Motor (run for 3 min.) gear box & gear box train engaging satisfactory 1 W 25.DEC.21 01.JAN.22
Quick release and on load release gear is properly completely reset in lock position. 1 W 25.DEC.21 01.JAN.22
Containers of: drinking water- small items-food rations –storm oil 1 W 25.DEC.21 01.JAN.22
Propeller blades and shaft bearing, grease bearings. 1 W 25.DEC.21 01.JAN.22
Rudder tiller, gudgeon , pintle, thouarts, seat belts if fitted 1 W 25.DEC.21 01.JAN.22
Lighting if fitted all lights to be tested. (navigation –search- cabin) 1 W 25.DEC.21 01.JAN.22
Lowering /Housing instructions posted readable under emergency lighting 1 W 25.DEC.21 01.JAN.22
Check for water oil accumulation in bilges and drain. 1 W 25.DEC.21 01.JAN.22
Weather and sea conditions permitting, l/boat to be removed from stowage position 1 W 25.DEC.21 01.JAN.22
Without any person on board to the extend necessary to verify proper operation of launching 25.DEC.21
1 W 01.JAN.22
appliances.
Weather and sea conditions permitting l/boat to be turned out without any persons on board 1 W 25.DEC.21 01.JAN.22
During l/b swing out verify free movement of moving parts and lubricate. (Ref.lub. diagram) 1 M 25.DEC.21 25.JAN.22
Check life boat equipment Replace drinking water in containers 1 M 25.DEC.21 25.JAN.22
In enclosed type l/b check: tightness of openings & emergency air supply if fitted 1 M 25.DEC.21 25.JAN.22
Embarkation ladder (Steps-Spreaders-Ropes-Shackles) 1 M 25.DEC.21 25.JAN.22
During L/B waterborne check: auto release mechanism. 3 M 25.DEC.21 25.MAR.22
: water sprinkler if fitted 3 M 25.DEC.21 25.MAR.22
Condition of grab lines and painters. 3 M 25.DEC.21 25.MAR.22
Condition of wooden gratings. 3 M 25.DEC.21 25.MAR.22
Engine fuel filter to be cleaned and fuel tank to be drained 3 M 25.DEC.21 25.MAR.22
Fuel tank to be emptied and fuel to be renewed 3 M 25.DEC.21 25.MAR.22
On load release mechanism if fitted. (By approved tech.) 1 Y
RESUE BOAT
Boat’s shell inside and outside, grab lines, limit switches, metal fittings 1 W 25.DEC.21 01.JAN.22
Boat hoists and slips (view – control – grease) 1 W 25.DEC.21 01.JAN.22
Refill fuel-check lubs in crankshaft & gear box .Battery if fitted -recharge 1 W 25.DEC.21 01.JAN.22
Boat’s shell inside and outside, grab lines, limit switches, metal fittings 1 W 25.DEC.21 01.JAN.22
Boat hoists and slips (view – control – grease) 1 W 25.DEC.21 01.JAN.22
Refill fuel-check lubs in crankshaft & gear box .Battery if fitted -recharge 1 W 25.DEC.21 01.JAN.22
Motor (run for 3 min.) gear box & gear box train engaging satisfactory 1 W 25.DEC.21 01.JAN.22
Quick release and on load release gear is properly completely reset in lock position. 1 W 25.DEC.21 01.JAN.22
Containers of: drinking water- small items-food rations –storm oil 1 W 25.DEC.21 01.JAN.22
Propeller blades and shaft bearing, grease bearings. 1 W 25.DEC.21 01.JAN.22
Rudder tiller, gudgeon , pintle, thouarts, seat belts if fitted 1 W 25.DEC.21 01.JAN.22
Lighting if fitted all lights to be tested. (navigation –search- cabin) 1 W 25.DEC.21 01.JAN.22
Lowering /Housing instructions posted readable under emergency lighting 1 W 25.DEC.21 01.JAN.22
Check for water oil accumulation in bilges and drain. 1 W 25.DEC.21 01.JAN.22
Weather and sea conditions permitting, R/boat to be removed from stowage position 1 W 25.DEC.21 01.JAN.22
Without any person on board to the extend necessary to verify proper operation of launching 25.DEC.21
01.JAN.22
appliances. 1 W
Weather and sea conditions permitting R/boat to be turned out without any persons on board 1 W 25.DEC.21 01.JAN.22
During R/B swing out verify free movement of moving parts and lubricate. (Ref.lub. diagram) 1 M 25.DEC.21 25.JAN.22
Check R/boat equipment 1 M 25.DEC.21 25.JAN.22
Embarkation ladder (Steps-Spreaders-Ropes-Shackles) 1 M 25.DEC.21 25.JAN.22
Condition of grab lines and painters. 3 M 25.DEC.21 25.MAR.22
Engine fuel filter to be cleaned and fuel tank to be drained 3 M 25.DEC.21 25.MAR.22
Fuel tank to be emptied and fuel to be renewed 3 M 25.DEC.21 25.MAR.22
annual inspection By approved tech 1 Y
Lifeboats Launching Appliances
Visual inspection 1 W 25.DEC.21 01.JAN.22
Brake handles moving freely up-down 1 W 25.DEC.21 01.JAN.22
During boats swing out, all moving parts to move freely. 1 M 25.DEC.21 25.JAN.22
Falls grippes and attachments lubricate shackles turnbuckles and other fittings 1 M 25.DEC.21 25.JAN.22
Lashing wire and attachments 1 M 25.DEC.21 25.JAN.22
Securing bolts and nuts 1 M 25.DEC.21 25.JAN.22
Proper operation of limit switches. 1 M 25.DEC.21 25.JAN.22
Winches proper operation 1 M 25.DEC.21 25.JAN.22
Remote control wires 3 M 25.DEC.21 25.MAR.22
During L/b waterborne swivels to move freely. Lubricate. 3 M 25.DEC.21 25.MAR.22
On load test of 1.1 times of life boat weight and its full complement (By approved tech.) 5 Y
Life raft
Condition of cradle 1 M 25.DEC.21 25.JAN.22
Condition of containers and water tight packing 1 M 25.DEC.21 25.JAN.22
Markings, Name, Plate, Date Serviced 1 M 25.DEC.21 25.JAN.22
Attached water tight tube with life raft I.D. 1 M 25.DEC.21 25.JAN.22
Condition of cradle 1 M 25.DEC.21 25.JAN.22
Condition of lashing 1 M 25.DEC.21 25.JAN.22
Condition of shackles, slip hook and turnbuckle. 1 M 25.DEC.21 25.JAN.22
Condition of weak ling or painter 1 M 25.DEC.21 25.JAN.22
Securing of release on deck 1 M 25.DEC.21 25.JAN.22
Serviced by approved servicing station (Solas III 20.8.1,2) 1 Y
Emcy Generator
Check oil, water and fuel & Run on test 1 W 25.DEC.21 01.JAN.22
Life buoys
Positions according to LSA Plan. & Safety Equipment Inventory. 1 M 25.DEC.21 25.JAN.22
Wear and tear. – Retro reflecting tapes – Condition of lines & length. 1 M 25.DEC.21 25.JAN.22
Condition of distinguish paint and Markings 1 M 25.DEC.21 25.JAN.22
Self igniting lights operational. (water activated batteries if fitted valid) 1 M 25.DEC.21 25.JAN.22
MOB – Quick release 1 M 25.DEC.21 25.JAN.22
MOB - weight of life buoy (more than 4 kgrs) 1 M 25.DEC.21 25.JAN.22
MOB - length of light/smoke attachment 4 meters. 1 M 25.DEC.21 25.JAN.22
Condition of Imo reflecting signs. 1 M 25.DEC.21 25.JAN.22
Life jackets
Number & location of life jackets according to LSA Plan & S. equipment inventory 1 M 25.DEC.21 25.JAN.22
Condition of cloth and straps 1 M 25.DEC.21 25.JAN.22
Attachments – whistle- lights 1 M 25.DEC.21 25.JAN.22
Condition of retro-reflecting material 1 M 25.DEC.21 25.JAN.22
Validity of batteries for light 1 M 25.DEC.21 25.JAN.22
TPA
Stowed according to LSA plan and inventory. 1 M 25.DEC.21 25.JAN.22
Wear and tear 1 M 25.DEC.21 25.JAN.22
Immersion suit
general Inspection 1 M 25.DEC.21 25.JAN.22
Annual inspection by approved specialist 1 Y
Pyrotechnics
general Inspection 1 M 25.DEC.21 25.JAN.22
Expire date 1 M 25.DEC.21 25.JAN.22
Condition of containers 1 M 25.DEC.21 25.JAN.22
Renewal 3 Y
Line throwing appliance
general Inspection 1 M 25.DEC.21 25.JAN.22
Expire date 1 M 25.DEC.21 25.JAN.22
Condition of containers 1 M 25.DEC.21 25.JAN.22
Renewal 3 Y
SART
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection/test by approved servicing company 1 Y
battery renewal 3 Y 25.DEC.21 11-NOV-24
EPIRB
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection by approved servicing company 1 Y
battery renewal 5 Y
Medical Oxygen Resuscitator
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection by approved servicing company 1 Y
HPT of bottles 5 Y
Life Boat Air Cylinder
general Inspection 1 M 25.DEC.21 25.JAN.22
annual inspection by approved servicing company 1 Y
HPTof bottles by approved servicing company 5 Y
Emergency and Safety signs
IMO reflecting signs are properly posted 1 M 25.DEC.21 25.JAN.22
Escape ways are clearly marked 1 M 25.DEC.21 25.JAN.22
Deck fittings (vent heads – ullaging tubes etc. ) are clearly identified 1 M 25.DEC.21 25.JAN.22
General Emergency Alarm System
System to be activated from a different point. 1 W 25.DEC.21 01.JAN.22
Bells where fitted operational 1 W 25.DEC.21 01.JAN.22
Visual signals where fitted operational 1 W 25.DEC.21 01.JAN.22
Safety Lockers
Proper inventory posted 1 M 25.DEC.21 25.JAN.22
Equipment stored in proper condition 1 M 25.DEC.21 25.JAN.22
No wasted equipment stored in the lockers 1 M 25.DEC.21 25.JAN.22