Professional Documents
Culture Documents
GROUP NO. : 18
Sr. No. NAME OF PROJECTEE Roll No.
1 Ashutosh Jha 300103318009
2 Sahil Gufran 300103318046
3 Vikas Dewangan 300103318032
4 Wasim Akhtar Khan 300103318050
Problem Identification :-
Remark(Week-2)09-09-2021 to16-09-2021
Remark(Week-3)17-09-2021 to23-09-2021
In this phase we have found several ways on how we implement the problem statement to get
the desired output.
Sign Project Mentor Sign Project Guide Sign Project Coordinator
In this phase we have gathered the information and started working on our project.
HOD
(InformationTechnology)
GROUP NO. : 18
Remark(Week-2)09-10-2021 to16-10-2021
In this phase we have examined every aspects of front end of our project in details.
This is mainly to see that our project runs as expected and to check design , execution , feasibility
and evaluation of our project .
Remark(Week-3)17-10-2021 to23-10-2021
HOD
(InformationTechnology)
GROUP NO. : 18
API Identification :-
In this phase we have identified which type of API we have to used in our project .
This includes both local and server API.
Remark(Week-2)09-11-2021 to 16-11-2021
API Analysis :-
Remark(Week-3)17-11-2021 to 23-11-2021
Public Testing :-
In this phase we have Tested from n number of users and successfully runs the project and get
feedback from the users
Sign Project Mentor Sign Project Guide Sign Project Coordinator
We gathered information of required tools and studied how to operate and use it
in our projects.
HOD
(InformationTechnology)