You are on page 1of 12
Pevt(4) Prestvessed Concrete prion. ala | 7 \S pon Ailes Bales) sly Wally Gnd) yy SN WA) es Gt Comp, Rabudt bys leds oF Aub ear alee 4 1 cn bee sy = bla os lay & sper Bole BLA alle © AST AN ab ysl, Guay! dar OWL, (Ua ct dejo . lyfe pe Fe Cl Abs Qe hat Be Es Bile) bendy Fhe obye laze Bis 2% r _ he Cash me B31b=~ 1 ie Shs | eal LP Be sic B sige SOY Arvin fe Fan Prestressing. Prestvesringy CED Sag is Cy Wives BIT yy79 AST Mie 895 eH P Go pitts Bie) 395 A di BR Nt EP El ma : on Ment Pre Stvessed Concvete ee 5 hi Gy Processes einai 24 y Pre tension Etec! oa ] . 8,4 Suhel SY, Shen An 1B) Copsze poms gf cue Cals de eee I Post=Tensingise! of Bal ¥E, (0585 ily aN\ yg peer Cer Sale ys oy SPL BY OSE Sue diss Fibs] i Loy. evn losses Twin losses Losses 2 lo 315 ¥. ore jes oF Lading In Plestvesed Concrete, own wt} Titel Fase = Trans fer fave DF ica SPU) eh path me ST Aa 2 8W OLY AT AU : Sry) JPY ~e Db Pr Hee 927) oi UE ‘ (0) -P; Pree ve A Z top -h Pee f = eu -i- Z bot. uheve_ ; Fes = ody Feas Le Fey 2.0.22 [Feat - o.afiy) 0-7 FPA) Aisig AB 5 pol “e — Aey se) aaa! ap BL tt spo) cei’ prestve seing- ole e * gree| ly) Wor King, stag ¢_ Toe oe eae at Wreetay = Pho hed tf hee aoe ee Gop A Z top Zeop a < = Ps Foo eve. ERC Se x hei 1 A Zpor- Z Bor Wheve— ee Few = a4 For = App it Few = 079 (Fond Pe all cca beens Question 5: (12 Points) For the fully prestressed beam shown in the figure, determine the required force at transfer, the amount of prestressing see and the » stresses at final stage. Use conere concrete strength at transfer i 2 | a| [420 mn 3 & } | | \ i | | £ i i att . Pen ST & Giving, pata, fog ee % Fund Prestressed eam Fen = bo Simm % Foal = 0T6 Fans 45 Nimo * FPN = 4906 Mim * Fp = Zee Mfmor * Fhoving Wt 2 bk Im + bk 2 19 kW Im * Comevete Covey spo wes % bestes = 17, LE UIm —> Assumed D Geometric Design ec eat Wire men x vthaiced force pt tvensfer * Asp * Stvewfes At Final Frage A= (24200 #1500) & (deo 802) = ARID wo VJo0 ¥ 1260" tes —— Ww Woo 8 Ws Ge = SEs soem 2 x Assi beet e y= oe ay Ae H8007 2 Age xt! mm ca 4 a. UME HIF park [El venster Sse ieee auth | senator sate 4s ry oh? e Hy 2 @2 Wy- Cone ave = oun wt = WeAr UG * Bhai! 2 ay whee kelw? (ieee) + TA) 2270.5 knew boo les 2foe we fee Hy aon Veer Ze Fy ; 4 Fsiese mses oad as Bobet? BAS #18 es He” Pe = TAIT-U KM Lo tee - Bee He 2 onus Fou be Foz" “ay 2y J = Pg wre Pred feo, MUS oy ae ahd Parts Lager’ Beat ¥10® Pos 7272 kW take Py = 7Ne72 KW (Bl Cale. Asp Mees ot, 2 TNEEEY | siden fmalley of V4do co OThpu — oShpy a \ 2-74 Zoo 969 100 = 147 Wim = VAho Mmm [Bl Fined $1080 due Dity Les fe od eoceueee P= Pei-tosses) = TH272 (1-017) 45678 kw Wy ows FO4+ LL ste bee ky Me = We ek a5 ary g = = UTS earns és l, Fep 2 2%, Se ee aah o Ane A Ze 2 - ro 3 Me 2 . of ! | 2 Bitten? , drier ae — Maegan! ou Beg ot IA | Soh Flo DAS #0 UL bk Ie <-24 HA ok few - Mey Soo = -lero8M/mm? 00 aa Question 3: (10 Points ) For the fully prestressed beam shown in the figure, determine the Tequired force at transfer, the amount of prestressing steel and the Stresses at final stage. The span of the beam is equal to 23.5 m. Use concrete with f= 55 N/mm? and the concrete strength at transfer is 75% of the cube strength, The provided prestressing steel with Sy = 1850 N/mm? and f,, = 2150 N/mm?, The flooring weight is equal 7.5 kN/m, the live load is equal 22.0 kN/m and the concrete cover is 100 mm. Assume the losses is equal to 14%, : 1800 mm Jet [450 mm Fen = 55 Ma : *FPY = 180 MA Khe=r, Foie osha = TS KM om here Hed *ffe ee A GVeV Zea wm Noses eby Geomeryje Pesign eam ie eae MAE Zeond Hoon Lye Vee tite cs Az Cx rw04 Ihoo) + (as : i (thoy 700) 2 WS #1 ck grsvor|, 45 me | 526 man) xt bedi #12" £ 2 ee De Se arden? aesme Zee Bede Z 5he ee ) Wanster te due te own wey Py sme 2 re77s balnd % 23 kwon’ = ovum wt 2% Az Ceol fe A 2 BLO U3 VS. ig 7a Kem os Cc th - Guev 2 She -be 2 A eee 5 Pee aie z ora fai 2 mrad AU = 1 AN3 eunt of nh. Presra I sheep : v Age _ 152 vd sae att fair 98 fe 7 TF ww oPhy ol n v\* ns 10 Whos Final stage plains Be te Dib bts Pe he Pete besser) = TAGL Hie ols) 2 6838-72 hd ae BUS Helle Wye oa fc thd = aye thet ' viel? psn (ea) plakak ener Nee RF Oe 5 co ef 227M ye . Be _ tle ork fon bop a tg 2 7 A Zs age sua 2 V8) Me & an io? genta ok 639TUt hh ee ; ra 5h # loo 7 Qag al Zu a 4s y - yr 7 | 1, Z tere Question §: ( 12 Points) AN SC For the fully prestressed a % am shown in figure 2, determine the required force at transf@}the amount of prestressing steel and the stresses at final Use concrete with fo, = 65 Nimm? & fay; = 43 Nimmg Festressing steel with fj, = 1800 N/mm? & fy, = 2000 e flooring weight is equal to 9 KN/m and the live load is age ‘N/m. Assume the concrete cover is equal a is equal to 17%. to 120 mm and & 1100 mm _ ier —t A bho gil § 350mm ° ° oO od . 9° i Figure 2 Question 4; (12 Points ) A post-tensioned simply supported beam of span 23 m having a Tectangular cross-section of dimensions 400 mm * 1150 mm. Assume that the beam made of concrete with féy = 50 N/mm? and the concrete Strength at transfer is 75% of the cube strength. The provided Prestressing steel with yy equal to 1800 N/mm? and fu equal to 2100 N/mm’. Assume the losses are 16% of the initial prestressing. The weight of flooring cover is equal to 7 KN/m, the live load is equal to 189 kN/m and the concrete cover can be taken equal to 100 mm. If the beam is fully prestressed, determine the required force at transfer, the amount of prestressing steel and the stresses at final stage.

You might also like