Grey cells have formulas in them. Enter information for all other cells.
DATE: 9/18/2014 Eau Claire to Osseo - USH 53 to Mallard
PROJECT ID: 1022-09-80 DESCRIPTION: Road
ROADWAY: IH 94 COUNTY: Eau Claire
General Information
IH WB passing lane station 646+00 to station 603+91
Location: IH EB passing lane station 604+00 to station 725+00
Lift # 2 Target Yield (tons/sta): 16.18
Lift thickness: 2" Paving thickness (in): 2
Total thickness: 4.5" Paving width (ft): 13
Start time: Paver start at 8:00 AM Design Mix ID: 87-14-725-SMA-12.5(R
Stop time: Paver off at 6:30 PM Mix Type: SMA
Rollers off at 7:15 PM AC type: PG70-28
RAP % 0
HMA Yield
Cummulative
Direction & Tons (from Cummulative Yield (Tons / Cummulative Yield (Tons /
Station Location tickets) Length (STA) Length (STA) Tons Sta) Sta)
EB 646+00 0.0 0.0 0.0 0.0 0.0 0.0
EB 603+91 861.38 42.1 42.1 861.38 20.5 20.5
EB 425+00 4400.00 178.9 221.0 3538.62 19.8 19.9
EB 300+00 6400.00 125.0 346.0 2000.00 16.0 18.5
EB 220+00 9200.00 80.0 426.0 2800.00 35.0 21.6
2.67 inches
HMA Temperatures
Time Temperature Behind Paver Temperature at Truck Bed
8:20 AM 291° F 287° F
1:45 PM 286° F 288° F
Inspection Observations
Rolling Pattern: One tandem steel drum roller (Dresser 17128) followed by two vibratory steel drum rollers
(Dynapac CC 624 HH)
Using Automatics: NA
Underlying Surface: E-10 Lower Layer
General Information
Location: (include roadway, lane, STA range and nearby landmarks)
Inspection Observations
Rolling Pattern:
Using Automatics:
Underlying Surface: