Installation and Operate guide

DPC Type De-energized tap-changer

DPC Type De-energized tap-changer



2 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide

Recommended practices
ABB Components recommends careful personnel’s safety, including Protective clothing,
consideration of the following factors when safety shoes, safety glasses, hard hat, and
installing De-energized tap-changers. protective gloves.

Before you install a unit, make sure that the To avoid damaging the unit, never exceed the
personnel doing the job have read and fully operating limits stated in delivery documents and
understood the technical guide documents on rating plates.
provided with the unit.
Do not alter or modify a unit without first
Make sure that the personnel who carried out the consulting ABB.
installation, operate, maintenance and repair are
special trained and qualified. Personal protective Follow local and international wiring regulations at
equipment must be worn during work to ensure all times.

WARNING, CAUTION and NOTE Installation and commissioning

WARNING! WARNING!
A WARNING provides information which, if ŸAfter the tap-changer is installed, operate
disregarded could cause injury or death. several cycles, must ensure that the
moving contact is in the center of the fix
CAUTION! contact in each position. Must follow the
A WARNING provides information which, if instructions as specified in section 6.3 to
disregarded could cause damage to the install the cover, and must follow the
equipment. instructions as specified in 6.5 to mount
the bevel gear and the hand-drive.
NOTE: A NOTE provides additional information to
assist in carrying out the work described. Ÿ
When tap-changer is installed, operate
several cycles and do visual inspection on
Safety precautions the position indicator on the top cover.
During drying of the transformers Make sure that the position indication is
in the center of the glass window in each
CAUTION! position.
Do not operate the De-energized tap-
changer during the drying process or Ÿ
The position shown on the hand-drive
afterwards until it is filled with oil to avoid must be same as the position shown on
seizing the top cover glass after installation.

Mounting of gaskets Ÿ
Before operate the tap-changer, must
ensure that the transformer is de-
CAUTION! energized. The HV side and LV side must
Sealing surfaces and gaskets must be clean be switched off. Before energize the
and undamaged. Diametrically opposed transformer, must read the name plate of
bolts in sealing joints must be tightened the transformer carefully and check
alternately several times, beginning with a carefully on the position shown in the
low tightening torque and finally with the hand-drive to ensure that the new
recommended tightening torque as position is correct. The safety precautions
described in section 9 Tightening Torque, in must be executed properly, otherwise, it
this guide. will result in severe consequences,
including equipment damage or personnel
After oil filling injury or death.

CAUTION!
Do not energize the transformer earlier than
three hours after oil filling in atmospheric
pressure. This waiting period is needed to
allow air bubbles to disappear.
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 3


Contents

1 Overview 4

2 Technical data 5
2.1 Type description 5
2.2 Scope 5
2.3 Working condition 5
2.4 Technical data 5

3 Tap-changer structure 6

4 Outline dimension 7

5 Scope of delivery 9

6 Installation 9
6.1 Mounting of the tap-changer when Transformer Ratio 9
Measurement is carried out before drying
6.2 Mounting of the tap-changer when Transformer Ratio 11
Measurement is carried out after drying
6.3 Mounting to the Transformer Cover from the yoke 12
6.4 Connection to Outside Terminals 14
6.5 Mounting the tap-changer to hand-drive mechanism 15

7 BUH Hand-Drive 20
7.1 BUH technical data 20
7.2 Safety precaution 20
7.3 Output signal 20
7.4 Hand-drive operation 20

8 Drying 21

9 Tightening torque 21

10 Disposal and environmental information 22


10.1 Disposal and recycling 22

Appendix 23
Connection diagram 23
4 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide


1 Overview

— DPC Type De-energized tap-changer is specially DPC type De-energized tap-changer is installed in
Figure 1 DPC type De-
energized tap-changer developed by ABB for single phase, large power tank, and BUH hand-drive is installed on the
transformers. The technology and process used in external side of the tank. They will be connected by
this product is based on ABB current mature bevel gear and drive shaft.
design, which will provide maximum reliabilities
for end customers. Its simple and mature The regulating type is linear type, the max position
structure guarantee that it has the same operating is 5 positions. The drive type is manual.
life with the transformer.


Figure 1
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 5


2 Technical data

2.1 Type description 2.2 Scope

DPC L E 1050 / 3200 DPC type De-energized tap-changer is applicable


for 50 Hz or 60 Hz, Single phase, power
Rated through current (A) transformers. The max through current is 3200 A
while the highest equipment voltage is 300 kV.
Lightning impulse
withstand voltage to
earth (kV) 2.3 Working condition
Single phase
2.3.1 The oil temperature should be lower than
Regulating type: Linear
105°C and higher than -25°C.
DPC: De-energized power
tap changer
2.3.2 The environment temperature should be
lower than 40°C and higher than -25°C when stored
in air. The relative humidity should be less than
85%.

2.3.3 Tap-changer should be installed vertically on


transformer.

2.3.4 Should no corrosive/explosive gas in working


environment.

2.4 Technical data

Type DPCLE
Max. rated through current (A) 3200
Frequency (Hz) 50/60
Phase and regulation type Single phase, Linear
Highest equipment voltage (kV) 300
Short circuit withstand Thermal stability (3s r.m.s value) 32
capability (kA) Dynamic stability(peak value) 80
Positions 5
Power frequency withstand voltage (50Hz, 1min) 460
Insulation level
Lighting impulse withstand voltage (1.2/50 μS) 1050
(To earth) (kV)
Switching impulse withstand voltage 850
Internal insulation level (kV) Between first and last contacts 430/160
(Lighting impulse/Power frequency) Between adjacent contacts 430/160
Max weight (Kg) Approximate 220
6 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide


3 Tap-changer structure


Figure 2 DPC De- Bevel gear
energized tap-changer Top flange
structure
Position indictor

Intermedia flange

Cylinder

Shielding ring

Moving contact

Current collector terminal

Fixed contact

Fixed contact short connection

Center shaft

Bottom support


Figure 2
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 7


4 Outline dimension


Figure 3 DPC
De-energized tap-
176.8

changer dimension

116
drawing

20
53.5
E E

Φ650
704.9

Φ480
2198

270

170

D D
170
170
270

50.8
120

Φ669

Φ14×16

Φ705

Grounding

Figure 3
8 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide


4 Outline dimension


Figure 3 DPC De-
energized tap-changer Φ14×8
dimension drawing

Φ660

Φ750

SECTION E-E

60°
4
Current
collector 15
terminal 8
40

3
1

Φ13
2
10°

SECTION D-D

Current collector terminal


short connection bar

Fixed contact

M12 SCREW
40

Cylinder

Flxed contact short connection bar,


T=8


Figure 3
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 9


5 Scope of delivery
1. DPCLE 1050/3200 De-energized tap-changer

2. BUH hand drive

3. Bevel gear and drive shaft with accessories

4. Technical documents, Including test record, drawings, installation and operate guide


6 Installation

The top section of the De-energized tap-changer is Mounting of the tap-changer to the “yoke-fork”
designed to be divided into an upper and a lower can be made according to two alternatives
flange, see Fig.4, to fit the yoke-mounting. depending on when the testing of the
transformation ratio shall be performed.
Before the tap-changer is lifted and attached to
the transformer cover it rests on a fork consisting Transformer ratio measurement before drying, see
of two beams protruding from the upper section 6.1
transformer yoke.
Transformer ratio measurement after drying, see
Note: If guiding pins are used on the fork, they section 6.2
should be insulated with bushings to prevent
circulation currents in the fork when the Mounting onto the transformer to the cover from
transformer is in operation. the yoke, see section 6.3

6.1 Mounting of the tap-changer when Transformer Ratio Measurement is carried out before drying

1. Mounting to the “Yoke-fork” of the transformer, see Fig.4


Figure 4
10 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide

NOTE:Check that the de-energized tap-changer by using a Wrench to turning the square tube.
is positioned in the right way in rotational relation When tap-changer is moving from position 1 to
to the transformer cover before connection of position 5, the square tube shall be turned
conductors. anticlockwise (When facing the bevel gear), 2
circles for each tap-change.
2. Connect the conductors according to section When tap-changer is moving from position 5 to
6.4. position 1, the square tube shall be turned
clockwise (When facing the bevel gear), 2 circles
3. Transformer ratio measurement. for each tap-change.

Tap-change: Fig.5 is showing that the tap-changer is moving


Mount a square tube to the bevel gear by clamps from position 5 to position 1 while the square tube
(included in scope of delivery), turn the bevel gear is turned clockwise.


Figure 5

4. Check the position indicator on the cover for 5. Loosen all the M12 bolts and washers in the top
each position. The numbers shown on the cover and lift the cover carefully min.100mm
indicator should be accordance with the position straight upwards before moving it in horizontal
of the moving contact. Unless otherwise stated, direction. The bevel gear may not be damaged
moving contact should be connected to fix contact when lifting. Keep the O-ring of the cover in a
“1” when in position 1.Moving contact should be dust- free place. See Fig. 4a
connected to fix contact “5” when in position 5.
There are markings on the fixed contact for easily 6. Remove the upper part of the top section by
recognition. loosening the M8-socket head cap screws inside it.
Keep the flange, the O-rings and store them
temporarily on a dust-free place. See Fig.4b
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 11


Figure 4a


Figure 4b


Figure 4c

6.2 Mounting of the tap-changer when NOTE:Check that the de-energized tap-changer
Transformer Ratio Measurement is carried out is positioned in the right way in rotational relation
after drying to the transformer cover, before connection of
conductors.
Lift the tap-changer onto the “Yoke-fork” of the
transformer, See Fig.4d. 4. Remove the lifting eyes when the tap-changer is
in right position on the “Yoke-fork”.
1. Loosen all the M12 bolts and washers in the top
cover and lift the cover carefully min.100mm
straight upwards before moving it in horizontal
direction. The bevel gear may not be damaged
when lifting. Keep the O-ring of the cover in a
dust- free place. See Fig. 4a

2. Remove the upper part of the top section by


loosening the twelve M8-socket head cap screws
inside it. Keep the flange, the O-rings and store
them temporarily on a dust-free place. See Fig.4b

3. When lifting the tap-changer onto the “Yoke-


Fork” it is recommended that lifting eyes M12 are
mounted in the lower flange.


Figure 4d
12 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide

6.3 Mounting to the Transformer Cover from the yoke


Figure 4e. Mount onto the transformer cover from the “Yoke-Fork”

1. Place O-ring in the groove on the transformer 5. Lift the tap-changer until it touches the upper
flange (This O-ring is not included in the tap- flange. Mount a washer and screw in each of the
changer delivery) free holes.

2. Place the upper flange over the opening of the 6. Remove the lifting bar and mount a washer and
transformer cover. screw in each of the free holes.

NOTE:Check that the de-energized tap-changer 7. Mount the studs in the transformer cover
is positioned in the right way in rotational relation through the holes in the upper flange. Fit washers
to the transformer cover. and nuts.

3. Mount the lifting tool on the upper flange with 8. Place the O-ring in the groove in the upper
the four long bolts through the unthreaded holes flange.
in upper flange and in the tapped holes in the
lower flange. 9. Before mounting the cover, must check whether
the position of the drive stud on the mechanism is
4. Check when lifting that the guiding pin in the in the right position as shown in Fig.6 (The drive
lower flange clear the hole in the upper flange. stud has been put in the right position before
delivery, if found not in the right position, need to
CAUTION! adjust its position. But it is not allowed to touch
Lift very carefully to avoid damage to the the wheel gear during adjustment)
tap-changer.
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 13

WARNING!
This step must be implemented. Otherwise,
in some positions, the moving contact may
not touch the fixed contact after one tap-
change is completed.

90°

Drive Stud


Figure 6 Drive Stud positon before mounting the cover

10. Before put the cover onto the upper flange,


must check whether the opening on the drive shaft
of the bevel gear fits the drive stud on the
mechanism. And then mount the cover with M12
washers and screws. After mounting the cover, the
key position should be facing the arrow symbol on
the cover.

The opening on the bevel gear drive should fit the


position of the drive stud as described in section 9.
Need adjustment if not.

WARNING!
After the cover mounting completed, the key
should point to the arrow symbol on the Key in the bevel gear should point to the arrow symbol
cover as shown in Fig. 7. When placing the on the cover.

cover, the guided pin on the upper flange —


should fit the hole on the bottom of the cover. Figure 7
14 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide

6.4 Connection to Outside Terminals

The connection to terminals should follow the connection diagram. There are markings on the fixed
contacts. All terminals are using M12 bolts for connection.

Connection diagram could found in Appendix.

Wrong

Right


Figure 8 Leads connection

CAUTION!
All connections shall be made carefully and in
such a way that there is no risk for them to
come loose. Furthermore, the conductors
must not cause mechanical stresses on the
outside terminals. Make an expansion bend
on every conductor. See Fig. 8

It is recommend that the distance between


the cylinder and any conductor is at least
50mm.

The transformer designer is responsible for


providing sufficient insulating distance in oil.
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 15

6.5 Mounting the tap-changer to hand-drive


mechanism

6.5.1 DPC tap-changer mounting to BUH hand- In hand drive, it has the necessary mechanism for
drive mechanism operating the tap-changer, as well as necessary
BUH hand-drive mechanism is for operating the output terminal for the electrical inter-locking with
tap-changer, make the tap-changer switched from the transformer.
one tap location to another in order to realize the
voltage regulating purpose. Below picture shows the connection of the tap-
changer to the hand-drive mechanism.

1 Bevel gear on cover 3 Bevel gear

4 Bevel gear bracket

5 Horizontal drive shaft,


vertical drive shaft

2 Tap-changer

6 BUH Hand-drive


Figure 9
16 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide

6.5.2 Mounting of External Drive Shafts 6.5.3 Mounting of Horizontal Drive shaft
The external drive shafts consists of square tubes 1. Mount the bevel gear SA21 on the transformer,
and shall be connected to the spherical shaft ends with O-ring SA20, four clamps SA17, hexagon head
on bevel gears and hand-drive mechanism by bolts M10, SA18 and washers SA19, see figure 10.
means of two coupling halves. The square shafts
and protective tubes must be cut before
mounting.

CAUTION!
1. Before mounting of shafts, everything
must be cleaned and greased for correct
function and to avoid corrosion
2. The hand-drive mechanism and tap-
changer shall have the same indicated tap
position.


Figure 10 External shaft system
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 17

2. Determine the dimension K1 between the 4. Cut the protective tubes SA23 and SA24 in the
spherical shaft ends, see Fig.10a. un-slotted end so that both of them get the same
length LB1 according to the table 1 below.
3. Cut the square shaft SA22 to dimension =K1
minus 6 mm.Remove the burrs. Note: Protective tubes with slotted ends shall be
used.


Figure 10a


Table 1. Length dimension for LB1

K1 190~290 291~600 >600


LB1 =(K1+160)/2 =(K1+210)/2 (K1+410)/2


Figure 10b

Note: If K1 is greater than 600 mm the mounted


tubes shall overlap each other at least 300 mm.
Dismounting and inspection of the couplings shall
be possible when one of the tubes is pushed into
the other.

5. Clean the spherical shaft ends and then apply


lubrication oil on the ends. (GULF18-EP synthetic
Lubricating oil or Low viscosity oil or similar
lubrication oil)

6. Fit two couplings halves, SA11, on one end of


the square shaft with six screws SA12 and
washers, SA13. Push the shaft to the bottom of the —
Figure 9c
fitting in the coupling halves. Tighten the two
screws A first and then the others, see Fig 9c.Put
on the protective tubes, SA23 and SA24, the
slotted ends outwards, and two hose clips SA10,
See Fig 10b.
18 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide

7. Open the cover of the bevel gear on the cover, CAUTION!


check whether the key on the vertical drive shaft of The hand-drive mechanism and the tap-
bevel gear points to the earth symbol, see Fig.11. If changer shall have the same indicated tap
not, should adjust its location through external position and the key in the bevel gear onto
drive shaft of the bevel gear. the tap-changer shall be facing the earthing
symbol according to Fig.11.
8. Connect the square shaft with the mounted
coupling halves to the shaft of the bevel gear SA21, 9. Push the two protective tubes on to the bevel
see Fig.12. Mount two coupling halves SA11 to the gears and clamp them with hose clops, SA10, see
square shaft perpendicular to the coupling in the Figure.12.
other end and to the shaft of the bevel gear on the
tap-changer. Tighten light the screws and check Notes: The slot of the protective tubes SA23 and
that the shaft not can be moved more than 2 mm SA24 shall be facing downwards.
in axial direction (Axial play). Tighten the two
screws A first and thereafter the other, see
Fig.10c.

Earthing symbol

Key in the bevel gear


Figure 11


Figure 12
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 19

6.5.4 Mounting of Vertical Drive Shaft


1. Determine the dimension K2 between the
spherical shaft ends, See Figure 13.

2. Cut the vertical square shaft, SA14, to


dimension=K2 minus 6 mm. Remove the burrs.

3. Cut the protective tubes SA15 and SA16 so both


of them get the same length LB2 according to the
table 2 below.


Figure 13


Table 2. Length dimensions for LB2 (mm)

K2 200~290 291~600 >600


LB2 =(K2+180)/2 =(K2+220)/2 (K2+410)/2

4. Clean the spherical shaft ends and then apply


lubrication oil on the ends(GULF18-EP synthetic oil
or low viscosity oil or similar oil)

5. Connect the square shaft with the mounted


coupling halves to the shaft of the bevel gear.
Mount two coupling halves SA14 to the square
shaft perpendicular to the coupling in the other
end, and the shaft of the hand-drive mechanism.
Tighten the screws lightly and check that the shaft
not can be moved more than 2 mm in axial
direction (Axial play).Tighten the screws A first and
thereafter the other. See Fig.13 and Fig.10c.

6. Mount the tube with the greater diameter,


SA16, to the bevel gear with a hose clip SA10.

7. Pull down the protective tube SA15 to the flange


of hand drive and mount the hose clip SA10.See
Fig.14.Note the clearance for draining. (Min 3mm).

Figure 14

CAUTION!
The hand-drive mechanism and the tap-
changer should have the same indicated
tap-position and the key in the bevel gear
onto the tap-changer shall be facing the
earthing symbol according to Fig.11
20 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide


7 BUH Hand-Drive

7.1 BUH technical data In order to fulfill this safety requirements, a safety
design is provided in the hand-crank. When insert
BUH Hand-Drive technical data is shown in table 3. the hand crank to the operation port on the hand-
— drive, the Micro-cam switch in the operation port
Table 3 will close or break the transformer circuit breaker.
Item Parameter Value Need to connect this Micro-cam switch to the
1 Max positions 5 circuit of transformer’s breakers to realize this
2 Position output contact capacity DC110 V/0.5 A function.
3 Control contact output capacity NO AC220 V/2 A
NC AC220 V/2 A Micro cam switch terminal is in X1, see table 4
4 Output Shaft drive torque 50 Nm —
5 Output Shaft turns per switching 2 Table 4

6 Hand crank turns in per switching 12 turns Terminal Signal


7 Protection class IP55 X1-1 Normally closed
8 Mechanical life 20000 X1-2 Normally Open
9 Weight Approximate 15 Kg X1-3 COM

7.2 Safety precaution Position indication terminal CX1 is provided in


BUH hand-drive. See table 5.
Specific safety lock is designed in hand-drive.
Once one switching completed, the mechanism —
Table 5
will be locked. Need to open the lock before next
switching. Terminal Signal
CX1-1 Position signal “1”

WARNING! CX1-2 Position signal “2”

Before operate the tap-changer, CX1-3 Position signal “3”

transformer must be de-energized. The HV CX1-4 Position signal “4”

and LV side must be switched off. Before CX1-5 Position signal “5”

energize the transformer, must read the CX1-6 COM

nameplate of the transformer carefully and


check carefully on the position shown on the 7.4 Hand-drive operation
hand-drive to ensure that the new position
is correct. The safety precautions must be Before operate the tap-changer, must ensure that
executed properly, otherwise, it will result in the transformer is de-energized.
severe consequences, including equipment
damage or personnel injury or death. Steps of operate hand-drive:
1. Inset the hand crank into the operation port
7.3 Output signal
2. Open the safety Lock with key
WARNING!
Before operation,Transformer and tap- 3. Operate the hand crank 12 turns clockwise or
changer must be inter-locked. Tap-changer anticlockwise until the safety lock is locked
could be operated only if transformer is de- again.
energized. Transformer could be energized
only if the tap-changer is in the right 4. Check the location of the pointers. Make sure
position. that the smaller pointer is in the green area and
the bigger pointer is in the right position. If not,
need to repair the hand-drive.
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 21


8 Drying

In order to ensure tap-changer's dielectric


strength, tap-changer should be dried with the
transformer.

CAUTION!
After drying, tap-changer is not allowed to
operate without oil. The contact should
apply lubrication oil if have to operate the
tap-changer.


9 Tightening torque

The following tightening torques are recommended:

M6 10 Nm ±10%
M8 24.5 Nm±10%
M10 49 Nm±10%
M12 84 Nm±10%

Unless otherwise stated in this guide.


22 1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide


10 Disposal and environmental information

10.1 Disposal and recycling

ABB strives to minimize the product’s impact on Cylinder


the environment throughout its entire life cycle. Cylinder is made of thermosetting plastic which is
Technical and product development focuses on not possible to recycle. It shall be sent to an
environmental aspects. approved treatment plant or recycling company.
It will not harm to the environment.
The eco-cycle approach is strived for and
Consideration is taken to the materials’ Plastic
environmental impact and recycling alternatives. The engineering plastic used in this product is
The manufacturing processes are selected to be as thermosetting plastic which is not possible to
safe for the environment as possible. recycle. It shall be sent to an approved treatment
plant or recycling company. It will not harm to the
Disposing of worn-out equipment environment.
Worn-out equipment must be phased out in an
environmentally sound manner. Rubber
Rubber shall be sent to an approved environmental
When disposing of used equipment, much of the waste treatment plant or recycling company,
material, or energy content in the material, can be disposal or use in new product. In this product,
recycled following sorting and cleaning. The rubber is mainly used for sealing.
amount that is recycled varies depending on the
technical resources and experience in each Oils and greases
country. Non-recyclable components should be Before disposal, oil, grease and similar products
sent to an approved environmental waste must be removed and sent to an approved
treatment plant for destruction or disposal. environmental waste treatment plant or recycling
company. By utilizing gravimetric forces, oil waste
Metals can be separated into oil, water and a range of
Metals should be sorted according to type and contaminants. In many cases, the oil can then be
surface coating and sent to an approved recycling reused. Alternatively, the energy content in oil can be
company. Following the removal of any paint or recovered through combustion at a plant designed
other surface coating, clean metal can usually be for the purpose.
melted down and used in new products. Many
metal components of iron, steel and aluminum are Others
large and easy to identify, e.g. Contacts, flanges. Must sent to an approved environmental waste
ABB strives to reduce the use of precious metals treatment plant or recycling company.
and the release of environmentally hazardous
metals.
1ZKM013119 Rev A EN, DPC type De-energized tap-changer Installation and operate guide 23


Appendix

Connection diagram

Pos. Connection
Max effective number of turns in Pos.1.
1 1-15
2 2-15
Digram shows that the tap-changer is
in 3 position (Rating position). 3 3-15
4 4-15
5 5-15

2 15

3 5

1 4
2
3
4
5

Current collector

Insulation & Component Division
ABB Hefei Transformer Co.Ltd.
Address: Lianhua Road 3318,
Hefei Eco. & Tech. Develop Zone
Post code: 230601
Tel: 0551-6227 3940

www.abb.com/transformercomponents

1ZKM013119 Rev A, EN, 2018-08-04 © Copyright 2018 ABB All rights reserved

扫一扫,进入手机旺铺

Disclaimer:
This document is for promotion purpose, so only for
reference. ABB Hefei make no guaranty for the accuracy of
the information or the use of the information. All
information is subject to change without notice.

You might also like