Lifting Plan 27 September 2021
Lifting Plan 27 September 2021
Work Content
Install Platform Dust Collector 500kg
loading scaffolding to transportation
Crane name ROUGHTER CRANE SANY SRC350
& Ability
□ wireless
Presence of overhead □ protection □ Caution sign □ guard
line and Method of □レ Nothing
measures
obstacle □ protection □ Caution sign □ guard
and Method of measures □
レ Nothing
Hanging load Hanging hook Total weight Working radius Crane load rating
amount
TOTAL 520 KG
Soft ground □Ground improvement □Spread iron plate
□ Nothing
size 1500 x 6000 T=22
Crane work
schedule
08.30-12.00 Install Platform Dust Collector 500kg
)
Preventive Action Toolbox Meeting before Work
Make sure the work area is sterile from people passing by
Use tag line when loading unloading Provide handytalky as
communication Barricade hazardous work area
Give a sign to inform the dengerous area
Make sure SIA and SIO is still active
Make sure the lifting materials does not exceed the safety Lifting Method :
factor
implementato Responsible limit
person Sign of participants 1. The rapture will be carried out at the point A to B
r 2. Using a wire rope with a diameter of 18 mm
3. Fastening on the platform material using 4.webbing slings with a capacity of 1000 kg / sling