Lifting Work Activity - 5-7 September 2021 35t
Lifting Work Activity - 5-7 September 2021 35t
Work Content
□ wireless
Presence of overhead □ protection □ Caution sign □ guard
line and Method of □レ Nothing
measures
obstacle □ protection □ Caution sign □ guard
and Method of measures □
レ Nothing
Hanging load Hanging hook Total weight Working radius Crane load rating
amount
Inclination □
and Method of measures □
レ Nothing
レ WEIGHT OF HOOK
BREAK DOWN レ SAFETY TOLERANCE
TOTAL 520 KG
B
Soft ground □Ground improvement □Spread iron plate
□ Nothing
size 1500 x 6000 T=22
)
Preventive Action Toolbox Meeting before Work
Make sure the work area is sterile from people passing by
Use tag line when loading unloading Provide handytalky as Lifting Method :
communication Barricade hazardous work area 1. The rapture will be carried out at the point A to B
Give a sign to inform the dengerous area 2. Using a wire rope with a diameter of 18 mm
Make sure SIA and SIO is still active 3. Fastening on the platform material using 4 .webbing slings with a capacity of 1000 kg / sling,
Make sure the lifting materials does not exceed the safety
factor
implementato Responsible limit
person Sign of participants