PROJECT TITLE : MISC. WORKS 2021 - DAIHO LAGUNA (PROPOSED FIRE PROTECTION WORK FOR FACTORY 2)
SUBCONTRACT : SUPPLY AND INSTALLATION OF FIRE PROTECTION SYSTEM FOR FACTORY 2
VENDOR : OPERATION & MAINTENANCE TECHNOLOGY PHILS., INC. PURCHASE ORDER NO. : DAL-21-156
INTERIM CERTIFICATE NO. : DAL-21-156-DEC282021-004 DATE OF CERTIFICATION : DEC. 28, 2021
WORK PERIOD AS OF : DEC. 23, 2021
PAYMENT RESPONSE TO :
Subcontract Payment Claim No. : 4TH PAYMENT
Dated : DEC. 28, 2021
Original Subcontract Works (see Attachment 1) 31,399,231.74 12,170,224.49 25,705,628.74 81.87% 13,535,404.25
Deduction :-
(a) Retention 10% (1,217,022.45) (2,570,562.87) (1,353,540.42)
AMOUNT DUE FOR PAYMENT EXC. VAT PHP 9,127,668.37 PHP 19,279,221.56 PHP 10,151,553.19
Note :
1. This Payment Response must be attached to your tax invoice.
2. Prepare your tax invoice accordingly and attention to SMCC PHILIPPINES INC.
3. Send the original copy of invoice with interim / Final certificate to Project QS / SMCC-Head Office
4. Please refer to attached valuation
Signed by:
DEC. 28, 2021 December 29, 2021 For Dec,29,2021
Ann Jeannette Perez Christopher Carlos Uy Edwin Martin Daniel Ajero Kazushi Kurita
Quantity Surveyor Site Engineer Site Manager - M&E Project Manager Regional Manager
Acknowledged by:
PROJECT NAME: MISC. WORKS 2021 - DAIHO LAGUNA (PROPOSED FIRE PROTECTION WORK FOR FACTORY 2) DATE OF CERTIFICATION Dec-28-2021
PURCHASE ORDER NO.: DAL-21-156 WORK PERIOD AS OF Dec-23-2021
VENDOR: OPERATION & MAINTENANCE TECHNOLOGY PHILS., INC.
INTERIM CERTIFICATE NO.: DAL-21-156-DEC282021-004
SUBCONTRACT PAYMENT CLAIM NO.: 4TH PAYMENT
DATE: Dec-28-2021
1 Supply of Labor and Materials, Delivery and Installation of Fire Protection System
Mechanical Works
A. Aerosol Fire Suppression System 1.00 lot 2,111,000.00 2,111,000.00 0.00 lot 2,111,000.00 - 0.00% - 0.00% - 0.00% -
Electrical Room
* Aerosol Generator 8/2 2.00 set 290,000.00 580,000.00 0.00 set 290,000.00 - 0.0% - 0.00% - 0.0% -
* Fire Suppression Control Panel 1.00 set 222,000.00 222,000.00 0.00 set 222,000.00 - 0.0% - 0.00% - 0.0% -
* Smoke Detector w/ Base 1.00 set 8,500.00 8,500.00 0.00 set 8,500.00 - 0.0% - 0.00% - 0.0% -
* Heat Detector w/ Base 1.00 set 8,500.00 8,500.00 0.00 set 8,500.00 - 0.0% - 0.00% - 0.0% -
* Strobe Horn 1.00 pcs 13,500.00 13,500.00 0.00 pcs 13,500.00 - 0.0% - 0.00% - 0.0% -
* Alarm Bell 1.00 pcs 9,500.00 9,500.00 0.00 pcs 9,500.00 - 0.0% - 0.00% - 0.0% -
* Abort Switch 1.00 pcs 13,500.00 13,500.00 0.00 pcs 13,500.00 - 0.0% - 0.00% - 0.0% -
* Manual Discharge Station 1.00 pcs 15,500.00 15,500.00 0.00 pcs 15,500.00 - 0.0% - 0.00% - 0.0% -
* Electrical Materials 1.00 lot 480,000.00 480,000.00 0.00 lot 480,000.00 - 0.0% - 0.00% - 0.0% -
Genset Room
Server Room
* Aerosol Generator 8/1 1.00 set 207,000.00 207,000.00 0.00 set 207,000.00 - 0.0% - 0.00% - 0.0% -
* Fire Suppression Control Panel 1.00 set 132,000.00 132,000.00 0.00 set 132,000.00 - 0.0% - 0.00% - 0.0% -
* Smoke Detector w/ Base 1.00 set 8,500.00 8,500.00 0.00 set 8,500.00 - 0.0% - 0.00% - 0.0% -
* Heat Detector w/ Base 1.00 set 8,500.00 8,500.00 0.00 set 8,500.00 - 0.0% - 0.00% - 0.0% -
* Strobe Horn 1.00 pcs 13,500.00 13,500.00 0.00 pcs 13,500.00 - 0.0% - 0.00% - 0.0% -
* Alarm Bell 1.00 pcs 9,500.00 9,500.00 0.00 pcs 9,500.00 - 0.0% - 0.00% - 0.0% -
* Abort Switch 1.00 pcs 13,500.00 13,500.00 0.00 pcs 13,500.00 - 0.0% - 0.00% - 0.0% -
* Manual Discharge Station 1.00 pcs 15,500.00 15,500.00 0.00 pcs 15,500.00 - 0.0% - 0.00% - 0.0% -
* Electrical Materials 1.00 lot 352,000.00 352,000.00 0.00 lot 352,000.00 - 0.0% - 0.00% - 0.0% -
B. Fire Protection System 1.00 lot 13,540,448.00 13,540,448.00 0.74 lot 13,540,448.00 9,957,425.00 73.5% 9,957,425.00 26.41% 3,575,386.00 47.1% 6,382,039.00
Installation of Fire Hose Cabinet (Outside Building)
* FIRE HOSE CABINET 10.00 pcs 22,400.00 224,000.00 10.00 pcs 22,400.00 224,000.00 100.0% 224,000.00 0.00% - 100.0% 224,000.00
Installation of Fire Extinguisher -
* DRY CHEMICAL FIRE EXTINGUISHER 105.00 pcs 5,320.00 558,600.00 0.00 pcs 5,320.00 - 0.0% - 0.00% - 0.0% -
Capacity: 20 Lbs -
Leadtime: 30 Days Upon P.O -
* HCFC 123 FIRE EXTINGUISHER 20.00 pcs 21,700.00 434,000.00 0.00 pcs 21,700.00 - 0.0% - 0.00% - 0.0% -
Capacity: 20 Lbs
Leadtime: 30 Days Upon P.O
PROJECT NAME: MISC. WORKS 2021 - DAIHO LAGUNA (PROPOSED FIRE PROTECTION WORK FOR FACTORY 2) DATE OF CERTIFICATION Dec-28-2021
PURCHASE ORDER NO.: DAL-21-156 WORK PERIOD AS OF Dec-23-2021
VENDOR: OPERATION & MAINTENANCE TECHNOLOGY PHILS., INC.
INTERIM CERTIFICATE NO.: DAL-21-156-DEC282021-004
SUBCONTRACT PAYMENT CLAIM NO.: 4TH PAYMENT
DATE: Dec-28-2021
Electronics Works 1.00 lot 3,192,000.00 3,192,000.00 1.00 lot 3,192,000.00 3,192,420.00 100.0% 3,192,420.00 36.25% 1,157,044.00 63.8% 2,035,376.00
A. Electronics for Fire Detection and Alarm System
Fire Detection and Alarm System
* Conventional FACP 16 Zones 1.00 assy 210,000.00 210,000.00 0.15 assy 210,000.00 31,500.00 15.0% 31,500.00 12.00% 25,200.00 3.0% 6,300.00
* Conventional Smoke/Heat Detectors 360.00 pcs 3,220.00 1,159,200.00 360.00 pcs 3,220.00 1,159,200.00 100.0% 1,159,200.00 20.83% 241,500.00 79.2% 917,700.00
* Conventional Manual Call Point 20.00 pcs 4,900.00 98,000.00 34.00 pcs 4,900.00 166,600.00 170.0% 166,600.00 55.00% 53,900.00 115.0% 112,700.00
* Conventional Horn Strobe 20.00 pcs 3,080.00 61,600.00 34.00 pcs 3,080.00 104,720.00 170.0% 104,720.00 55.00% 33,880.00 115.0% 70,840.00
* Conventional Fire Alarm Bell 10.00 pcs 2,800.00 28,000.00 34.00 pcs 2,800.00 95,200.00 340.0% 95,200.00 110.00% 30,800.00 230.0% 64,400.00
* TF Wire, EMT Conduits,Fittings, Supports and Accessories 1.00 lot 1,593,200.00 1,593,200.00 1.00 lot 1,593,200.00 1,593,200.00 100.0% 1,593,200.00 47.00% 748,804.00 53.0% 844,396.00
Supervisory Control System
* TF Wire, 1.25mm² (yellow) 225.00 m 28.00 6,300.00 225.00 m 28.00 6,300.00 100.0% 6,300.00 88.89% 5,600.00 11.1% 700.00
* TF Wire, 1.25mm² (blue) 225.00 m 28.00 6,300.00 225.00 m 28.00 6,300.00 100.0% 6,300.00 88.89% 5,600.00 11.1% 700.00
* Terminal Lugs and Accessories 1.00 lot 1,400.00 1,400.00 1.00 lot 1,400.00 1,400.00 100.0% 1,400.00 40.00% 560.00 60.0% 840.00
* Pipe Conduits and Fittings 1.00 lot 28,000.00 28,000.00 1.00 lot 28,000.00 28,000.00 100.0% 28,000.00 40.00% 11,200.00 60.0% 16,800.00
Brackets and Supports 1.00 lot 1,106,000.00 1,106,000.00 1.00 lot 1,106,000.00 1,106,000.00 100.0% 1,106,000.00 45.00% 497,700.00 55.0% 608,300.00
Painting Materials 1.00 lot 310,800.00 310,800.00 1.00 lot 310,800.00 310,800.00 100.0% 310,800.00 45.00% 139,860.00 55.0% 170,940.00
Restoration Materials 1.00 lot 84,000.00 84,000.00 1.00 lot 84,000.00 84,000.00 100.0% 84,000.00 30.00% 25,200.00 70.0% 58,800.00
Temporary Facility 1.00 lot 812,000.00 812,000.00 1.00 lot 812,000.00 812,000.00 100.0% 812,000.00 100.00% 812,000.00 0.0% -
Technical Cost
A. Installation fee for DAIHO Factory 1 1.00 lot 7,100,000.00 7,100,000.00 1.00 lot 7,100,000.00 7,100,000.00 100.0% 7,100,000.00 60.00% 4,260,000.00 40.0% 2,840,000.00
SITE EXPENSE AND INDIRECT WORKS
Tools Depreciation 1.00 lot 657,910.80 657,910.80 1.00 lot 657,910.80 657,910.80 100.0% 657,910.80 50.00% 328,955.40 50.0% 328,955.40
Miscellaneous & Consumables 1.00 lot 986,866.19 986,866.19 1.00 lot 986,866.19 986,866.19 100.0% 986,866.19 50.00% 493,433.10 50.0% 493,433.10
Travel & Transportation 1.00 lot 1,644,776.99 1,644,776.99 1.00 lot 1,644,776.99 1,644,776.99 100.0% 1,644,776.99 50.00% 822,388.50 50.0% 822,388.50
OVERHEAD AND PROFIT 1.00 lot 4,745,002.74 4,745,002.74 1.00 lot 4,745,002.74 4,745,002.74 100.0% 4,745,002.74 27.00% 1,281,150.74 73.0% 3,463,852.00
2 Discount 1.00 lot (4,891,572.98) (4,891,572.98) 1.00 lot (4,891,572.98) (4,891,572.98) 100.0% (4,891,572.98) 25.00% (1,222,893.25) 75.0% (3,668,679.74)
Amount Certified For This Payment 31,399,231.74 81.87% 25,705,628.74 81.87% 25,705,628.74 38.76% 12,170,224.49 43.11% 13,535,404.25