You are on page 1of 9

ENVIRONMENTAL IMPACT ASSESSMENT

LEGEND
1 – CONSTRUCTION PERIOD
2 – OPERATION PERIOD

MAJOR MINOR NO MINOR MAJOR


POSITIVE POSITIVE IMPACT NEGATIVE NEGATIVE
IMPACT IMPACT IMPACT IMPACT

IMPACT ELEMENTS IMPACTING IMPACTS PREDICTION IMPACT MITIGATING/


ENHANCEMENT
MEASURES
A. Physical 1 2
Characteristic
a.1.Basic Land Condition
1.A.Geologic Conditions
Major Land Formation There will be a major Limit the possible dredging and
positive impact because reclamation of the site that may
some areas will be affected affect the land formation.
during dredging and
reclamation.
Geologic Structures There will be a major Proper planning and utilization of
negative impact since the site development is necessary to
deformation of rocks require limit the deformation of the
for excavation of the port geologic structures.

44
column.
Geologic Resource There will be a major Proper utilization of geologic
negative impact; there will resources is necessary to lessen the
be a consumption of negative impact.
geologic resources.
1. B, Soil Condition
Soil Classifications There will be a minor
positive impact due to soil
classification will suit for
the proposal.
Soil Permeability There will be no appreciable
impact since there will be a
major effect to the soil
permeability.
Inherit Fertility There will be no appreciable
impact since there will be
no affect in the fertility.
A.2.Biotic Community
Condition

2.A.Plant

General Type and There will be a minor Minimize the clearing to lessen the
Dominant negative impact and there negative affect with the ecosystem.
Species be an alteration of
behaviour of species.

Densities and Distribution There will be less number of Relocate for the vegetation and

45
trees due to clearing of the enhance the greeneries of the site
site. development.
Animal Habitat Value There will be some clearing Proper replacement natural corals
for construction in the land. for mitigating the affected area.
This may slightly affect
some of the position of
species.
Endangered Species There will be a minor Limit the disturbance of the
negative impact; there will affected area as much as possible
be a clearing that may affect and
on disposition of the Re-vegetate the affected area.
species.
Fire Potential There will be a minor There should be a proper clearing
negative impact; materials of the area and eliminate all the
like debris and solid waste flammable objects that might
during construction are fire affected especially during
potentials. construction
Timber Value There will be minor Proper landscaping of new
negative impact since there replanted talisay, mangrove, and
are trees are in the area. ipil-ipil trees will improve its
natural landscape and its condition.
2.B.Animal
General Type of There will be a minor Limit the nuisance and provide an
Dominant negative impact; there will artificial corals in the affected area
Species be minor effect with the of excavation in the sea floor.
habitat of the marine life
especially during the
construction of the wharfs.
Endangered Species There will be a minor Refrain from the affect of
negative impact since behavioural pattern of the marine

46
seascape may affect during species.
construction.
2.C.Watershed Condition
Water Quality There will be no risk to
hazard on water quality.
Source of Public or Sources of water will Provide an underwater connection
Private improve of the utility.
Water Supply on Site

Location of Wells, There will be no no risk to


Springs, etc. hazard on location of wells,
springs , etc.

2.D.Air shed Condition

General Climatic Type There will be no affect on


the climate.
Air Quality The clearing of site may Proper mitigating in enforcing the
affect the temperature by replacement of the vegetation.
cutting of the trees.
Odour Levels There are materials that Products that contain negative
would create negative effect in terms of its odour level
impacts during construction should be placed in a container
and other odorous products vans to limit the negative effect.
during the operation of the
project.
Average Rainfall There will be no positive or
negative effect in the
amount of rainfall.

47
Prevailing wind There will be no appreciable
impact in the prevailing
wind.
B. Socio- Economic Characteristics

B.1.Land Use
Present Zoning The site zoning is for The land use will be disestablish
Classification institutional but convertible from the protected area
for industrial zone therefore management.
it is compatible to the land
use plan.
Surrounding Land Use The surrounding land uses
is also compatible for the
the site that is convertible
for industrial area and has a
nice scenic views.
Existing Structures There is an existing wharfs The wharf will be enhance for the
and light material structure project and will be take in the
of military outpost will be operation by the PCG.
rehabilitate.
Historic Value There is no historic value or
events within the site.
Scenic value The proposed project will Provide open space and park-like
be design compatible to the ambience to the proposal for people
environment and will add to experience the scenic value of
panoramic view. the place.
Noise Value There will be often noise of The project will provide buffers to
sea during the construction avoid disturbance in ecosystem.
and operation of the project.

48
Population Density There are settlers existing There will be a relocation area for
within the site. the settlers.
Taxes Generated There will be a generation
of income taxes beneficially
for the government.
Payroll Generated There will be additional
personnel of PCG and non-
personnel to operate the
project.
Value Property There will be increase of
value of property since the
project will be established.
B.2.Service System
Local Street There will be an
improvement of the roads.
Health No existing health facilities.

Police Station There will be no impact The project itself is in aware for
since there is a port police such enforcement for some
station to be provided in the response for public safety.
proposal.
Fire Station There will be no impact Provide an adequate fire safety
since there are fire stations. equipment.
Recreation (park reserves) There is no impact because The project will provide a park-like
the site is located in ambience.
institutional zone.
Health (hospital, clinics) There is no hospital situated The project will provide an
in the site. infirmary for the coast guard.

49
Electrical Supply There are existing power Provide additional alternative
lines in the site. electrical supply like solar power
and generators.
Solid/Liquid Waste There are no waste disposal Proper disposal of waste during the
Disposal management in the site. operation and provide a portable
waste disposal containers.
Telephone Service There are no existing Wireless communication services
communication lines. will be provided for the project.

B.3.Community Characteristics
Total Population There is no presence of
large community in the site.
Housing Value There is no existence of
housing value proclaimed in
the site.
Income Level There will be a production
of income level in the
community.
Employment Level There will be an The project will provide operation
employment opportunities of environmental protection.
on site during and after
construction of the project.
Health Level There are minor negative
impact in health level
caused by the material
elements during
construction.

50
Crime Level There will be an installation
of police station on the site.

C. Aesthetic Effects

Land (Scenic Feature) The area will have a livelier


scenic feature that will
invite more
passengers,visitors and
investors.
Atmosphere There no impacts or affect
in terms of the atmosphere.

Water (Sea) There will be a major Provide a proper waste disposal.


negative effect in terms of
water pollution during
construction.

D. Flora and Fauna

A.Flora There will be a minor effect Provide proper mitigation of


of the plants during the replanting of trees and installation
construction of the proposal. of artificial and natural corals.

51
There will be a minor effect Get some breeds of the fishes and
of the animals and fishes water animals and taking care of
B.Fauna
living the sea during them for them to multiply and put
construction. them back to the sea.