! STANDARD SCHEDULE OF RATES
; lFoR BASrC rTEMS ONLYI
il
;
I
;$
2O2L-2O22
-^-r -^-
I
I
s
!
/)
!
lwrTH EFFECT FROM 13.O9.2O21I
!
;
I
s
!
I
I
!,
4
Ri[{7iJ'" tr' r-t#[' It-? t{!!I+ii]\f*:;1.:::La:;1iH*::t::Ii::irilrr:r:ailf,.::t\(I1+ilt:I/tIri:isrr::;:r[t:
GOVERNMENT OF TAMIL NADU
WATER RESOURCES DEPARTMENT
Sub: WRD - Standard Schedule of Rates with Basic Rates for the year 2021-2022
for adoption in preparation of estimates with effect from 13.09 .2O2t -
Approved - Communication of - Regarding.
q
En g i neer-i r(€#ief WRD &
2021-2022
(w.E.F. 13.O9.2021)
INDEX
sl.
No. Description Page
1 General Note L-7
For special nature of works, for which rates are not covered in the Schedule of Rates,
such as road works, water supply, drainage, etc., separate schedule of rates:is.sued
''
bV the respective officers / department / board are to be foltowed.
Extra percentage other than those for the specified areas noted below, shall not be
allowed.
1. CORPORATION LIMITS:
An extra 1oolo on the Rates of Labour, Rates of Works and for Head Load shall be
(i) Erstwhile Chennai Corporation limits and the belt area of 32 km around erstwhile
Chennai Corporation limits (i.e.) prior to formation of Greater Chennai Corporation,
(iii) coimbatore corporation limits and also for works in Hosur Taluk.
2. An extra 5olo on the Rates of Labour, Rates of Works and for Head Load shall be
allowed for the works in Trichy, Salem, Tirunelveli, Tiruppur, Erode, Thoothukudi and
3. RESTRICTED AREAS:
(i) An extra 1oolo on the Rates of Labour and Rates of Works shall be allowed for
(ii) An extra 1oolo on the Rates of Labour, Rates of Works and Conveyance Charges
(iii) An extra 5olo orl the Rates of Labour, Rates of Works and Conveyance Charges
charges and Head Load shall be allowed for works in Reserve Forest Areas.
As the transport facilities in most of the Hilly Areas are now considerably improved and
as there is no necessity for allowing extra percentage as hitherto followed, the Hilly
Areas are now again regrouped as detailed hereunder and the extra percentage allowable
has been revised accordingly and fixed.
The conveyance table approved and furnished in the schedule of rates under the Head
(i) For works in Nilgiris District an extra 4oo/o onthe rates of labour, rates of work,
head load and an extra 25olo on the rates of materials shall be allowed.
(ii) For works in Mudumalai sanctuary, shandy Nallah sheep Farm, Dansandle
areas, an extra 4oo/o over rates of labour, rates of work and head load and an
( iii) For works in Valparai Area an extra 4Oo/o on the rates of labour, rates of work,
head load and an extra25o/o on the rates of materials shall be allowed.
2
(vi) (a) An extra 5oo/o on the Rates of Labour for works in Thekkady shallbe
allowed,
(b) Add25o/o extra shall be allowable on the Rates of Materials which are
to be supplied at Thekkady, subject to the condition that there shall
not be any extra on conveyance, tollgate fee, interstate allowance,
etc. The conveyance charge as applicable for Ghat Road,Cart,Track,
etc., as per schedule of rates is only applicable.
(vii) An extra 6oolo shall be allowable on the Rates of Materials to be supplied for
Periyar Dam Site subject to the condition that there shall not be any extra on
applicable for Ghat Road, Cart Track, etc., as per schedule of rates is only
applicable.
(viii) An extra l00o/o on the Rates of Labour for works in Periyar Dam Site under normal
(ix) An extra LSOo/o on the Rates of Labour for works in Periyar Dam. Site under
hanging condition shall be allowed.
(x) An extra 50o/o on the Rates of Labour, Rates of Materials, Rate of Works and Head
Load shall be allowed for the works at Lower Camp above Kuruvanthu Bridge, Bodi
Panchayat.
(xi) An extra 4oo/o on the Rates of Labour, Rates of works and Head Load and an
extra 25olo over the Rates of Materials shall be allowed for the works at Kodaikanal.
(xii) An extra 25o/o on the Rates of Labour, Rates of Materials, Rates of Works and
Head Load shall be allowed for works in Yercaud, Yercaud Sub-Taluk, Boothamalai,
3
(xiii) An extra 4Oo/o on the Rates of Labour, Rates of Works and Head Load and an
extra 25o/o over the Rates of Materials shall be allowed for works in Kalrayan Hills,
(xiv) An extra 4Oo/o on the Rates of Labour, Rates of Works and Head Load and an
extra 25o/o over the Rates of Materials shall be allowed for works in Jawadhu Hills,
-: i,
Elagiri Hills, Kalrayan Hills, Nakkanamalai Hills, Naickerneri Hills Tiruvannarnalai &
Vellore Districts.
(xv) An extra 4Oo/o on the Rates of Labour, Rates of Works and Head Load and an
extra 25olo over the Rates of Materials shall be allowed for works in Piranmalai
(xvi) An extra 4Oo/o on the Rates of Labour, Rates of Works and Head Load and an
extra 25o/o over the Rates of Materials shall be allowed for works in Chitteri Hills,
Sittiling in Kalrayan Hills in Dharmapuri District.
(xvii) An extra 4Oo/o on the Rates of Labour, Rates of Works and Head Load and an
extra 25olo over the Rates of Materials shall be allowed for works in Kalrayan Hills
(xviii) An extra 40o/o on the Rates of Labour, Rates of Works and Head Load and an
extra 25o/o over the Rates of Materials shall be allowed for works in Pachamalai
An extra 25o/o on the Rates of Labour, Rates of works and Head Load
shall be allowed.
4
(b). For works in Other Islands:
Conveyance Charges and Head Load shall be allowed for other Islands in
Manoli Island, (10) Minoliputti Island, (11) Nadu Island (12) Nallathannie
Island, (13) Pullivasal Island (14) Poomarichan Island, (15) Muyal Island,
Conveyance Charges and Head Load shall be allowed for Van, Kasuvar,
6. TUNNELS:
An extra 15olo on the Rates of Labour and Rates of Works shall be allowed for
works inside Tunnels.
7. DAM srrEs UNDER HANGTNG coNDrrroN (other than periyar Dam Site):
An extra 75o/o on the Rates of Labour employed for the items of works, which
may have to be executed by hanging from the top of Dam through slings (or)
.
rope ladders to work in dizzy height. (This witt apply onty for maintenance
(i) The rates of labour means the labour rates fixed under the head, Rates of Labour.
( ii) Rates of Works includes the labour for earthwork, refilling foundation,
dismantling, jungle clearance, head load, etc., also where human labour alone is
involved.
(iii) The percentage increase provided for the materials are applicable only for the
(iv) The percentage increase provided for Rates of Works are allowable only on the
:
(v) The percentage increase provided for Conveyance Charges are allowablelfor the
(vi) The extra percentage allowable as specified above shall not be applicable for the
conveyance charges shall be allowed for the items covered under these two
categories. The rates approved therein are applicable at site of work.
(vii) While adopting source of any materials inside the special tracts viz., Corporation
limits, Reserve Forest Areas, Hilly Areas, Islands, Dam Sites etc., where extra
percentage allowable for the materials which are quarried or manufactured locally,
it is the duty of the officer in charge of the work (not below the rank of Assistant
Executive Engineer), to analyse and confirm whether the finished cost of such
materials / works are higher if the materials are conveyed and brought to the site
" from the areas outside the specified area, where such extra percentage are not
permissible.
(viii) The necessity of inclusion of relevant footnotes in respect of the districts covered
under their region other than the general notes furnished above, if any, may be
6
(ix) As per Notification No.31/2017- Central tax (Rates) dated 13th October,2OtT the
concessional rate OF GST at 12olo (CGST at 60/o + SGST at 60lo) is leviable for any
The Contractor is eligible to get refund of excess tax paid over or liable topay tax
as per Notification No.20/2017, Central Tax (Rate) dated 22.8.2Ot7, ruoiification
(x) Further, for Works Contract services involving predominanfly earth works (that is,
constituting more than 75o/o of the value of the works contract) supplied to Central
GST is to be calculated at 5olo (CGST at2.So/o + SGST at 2.5olo) over and above the
Basic Rate,
Engineer-in
Chief Engineer (General), pWD,
- 5' (Member)
ft."ennai
7
STATEMENT SHOWING THE EXTRA PERCENTAGE ALLOWABLE AS PER GENERAL NOTE TO
SCHEDULE OF RATES FORTHE YEAR 2O2L-2O22
(with effect from 13.O9.2021)
Percentage extra allowable on
Rate of
5.No Area work
(where Convey- Head
Labour Material human ance load
labour
involved)
1 For works in (i) Erstwhile Chennai Corporation t0o/o tOo/o 10o/o
Iimits and the belt area of 32 km around
erstwhile Chennai Corporation limits (i.e.)
prior to formation of Greater Chennai
Corporation, (ii) Madurai Corporation limits,
(iii) Coimbatore Corporation limits and also for
works in Hosur Taluk
B
Percentage extra allowable on
Rate of
work
(where Convey-
sl. Area human ance
No. Head
Labour Material labour Ioad
involved)
x For works at Lower Camp above Kuruvanthu 50o/o 50o/o 50o/o 50%
Bridge, Bodi Hills, Cumbam Mettu, Sirumalai,
Pachai Kamatchi Hills, Palani Hills,
Tiruparankundram Hills, Irdumban Hills,
Megamalai Panchayat and Thummakundu
Panchayat
xi For works at Kodaikanal 4Oo/o 25o/o 40o/o 40o/o
xii For works at Yercaud Hills, Yercaud Sub-Taluk, 25o/o 25o/o 25o/o 25o/o
Boothamalai, Aranuthumalai, Sarugumalai
andTiruchengodu Hills in Salem and Namakkal
Districts
XIII For works at Kalrayan Hills, Pachamalai 4Oo/o 25o/o 4Oo/o 40o/o
Hills,Kolli Hills in Salem and Namakkal
Districts
xiv For works at Jawadhu Hills, Elagiri Hills, 4Oo/o 25o/o 4Oo/o 40o/o
Kalrayan Hills, Nakkanamalai Hills,
Naickenneri Hills in Tiruvannamalai and
Vellore Districts
XV For works at Piranmalai covering Oduvarpatti, 40o/o 25o/o 4Oo/o 40o/o
Kattugudipatti, Pannadaipattu, V.Pudur
Villages, Mamalai covering Vannar Iruppu,
Nagamangalam Villages, Usilamalai covering
Poolankurichi Village, Hillocks at
Musundapatti, Usilam, Ammapatty and
Thuthampatti in Sivagangai District
xvt For works at Chitheri Hills, Sittiling in 4Oo/o 25o/o 40o/o 40o/o
KalrayanHills in Dharmapuri District
xvii For works at Kalrayan Hills in Cuddalore 4Oo/o 25o/o 4Oo/o 40o/o
andVillupu ram Districts
xviii For works at Pachamalai Hils in Trichy, 4Oo/o 25o/o 4Oo/o 4Oo/o
Karurand Pera mbalur Districts
5 Islands
i For works at Rameswaram Island in 25o/o 25o/o 25o/o
Ramanathapuram District
ii For works in other Islands, viz. Upputhannie, L25o/o L25o/o \250/o 125o/o l25o/o
Puleevilaichalli, Alaiappar, Valimunai, Appa,
Thalaiyari, Valai, Mullai, Manoli, Minidiputti,
Nadu, Nallathannie, Pullivasal, Poomarichan,
Muyal, Singala, Kuruseedar Islands in
Ramanathapuram District
9
Percentage extra allowable on
Rate of
sl. work
Area
No. (where Head
Labour Material Convey-
human load
ance
labour
involved)
iii For works in Van, Kasuvar, Karaichalli anc L25o/o L25o/o l25o/o 725o/o t25o/o
Vilankurichi Islands in Thoothukudi District
6 Tunnels
i Where Human labour alone is involved L5o/o t5o/o
Tvtw
Engineer-in WRD &
Chief Engineer (General), PWD,
Chennai - 5. (Member)
8dNs
10
ANNEXURE-I
RATES OF LABOUR
Basic Rate
Sch. approved for the
sl.
No.
Item Description of Labour Unit year
No. 202L-2022
(w.e.f. 13.09.21)
I HIGHLY SKILLED CATEGORY
11
Basic Rate
Sch. approved for the
sl. Item Description of Labour
No. Unit year
No. 2(J2L-2022
(w.e.f. 13.09.21)
19 72 Wodder Day 556.00
L2
Basic Rate
Sch. approved for the
sl. Description of Labour
No.
Item Unit year
No. 2fJ2L-2022
(w.e.f. 13.O9.21)
NOTE:
1 TheBasicRateadoptedunderthisHead,..Annexure-I-RatesorLrc
all taxes and GST.
2 The rates for items other than those mentioned above are to Oe aaoptea from tnegcheOute
of Rates issued by the Engineer-in-Chief (Buildings) & Chief Engineer (Buildingd); Chennai
Region, Chennai -5.
ttcp
ibf, WRD &
Chief Engineer (General), pWD,
chennai -5'
yS-
13
ANNEXURE.II
RATES OF MATERIAT.S
27
^vugil rLUile tor masonry worKs (Hard Granite)
1
cum. 445.O0
2 28 ugil rLUile tur revetment worKs cum. 385.00
3 29 Jtruuy stze ror revetment (Hard Granite)
cum. 424.O0
4 29a rLUile riltar or stze u.I5 x 0.15 x 2.1m
Each 164,00
5 30 ruers wrrnout Dtasttng for revetment cum. 113.00
6 30a s wtLnouf otasung ror masonry cum. | 146.00
7 32 Lourse KUDDIe stone for masonry works
cum. 355.00
B 33 Kuut.lte >tone tor Arch works
cum. 385.00
9 33 (A) esse(r Jlone /ucm x 30cm x 29cm Each 175.00
I
10 II l^ la
esseu )rone slcm x i0cm x 29cm Each 1 58.00
11 (B) essect >rone J/cm x 30cm x 29cm Each 722.00
72 34 y rrresseo ro stze on all faces cum. 6380.00
13 35 uuL >f,one Kougnty Dressed
cum. 4390.00
14 36 urr )rone ruly Dressed to size all faces cum. 4845.00
15 El^^
3B r r\.,L'ril19 JLUne >s Slze 1ruOt leSS than 1OCm sqm.
thick) 353.00
16 39a rl.,rE rrdu rur Lurverf (j races one line dressed) cum. 4620.00
Above 1.2m
77 b Qln
err (5 races one tine dressed) cum. 4200.oo
Upto 1.2m
1B 40 Qla
Lurverf (5 races two line dressed) cum. 5140.00
19 41 Far r_upilrg
I
lr races two ltne dressed) cum. 5140.00
20 42 DUIIU JfONES
cum, 642.00
21 43a LUne J..O) X U.45 x 0.15m Each 439.00
L4
Basic Rate
Sch.
sl. Description of Materials Unit approved for the
No.
Item year 2021-2022
No.
(w.e.f. 13.09.21)
22 44a Hectametre Stone 0.9x0. 1x0. 1m Each 722.00
25 45a Demarcation Stone (two line dressed for top 30 Each 91.00
cm)75x15x15cm
26 b Demarcation Stone (two line dressed for top 30 Each 117.00
cm)90x23x23cm
27 c Demarcation Stone (two line dressed for top 30 Each 109.00
cm)75x23x23cm
28 d Demarcation Stone (two line dressed for top 30 Each 99.00
cm)90x15x15cm
29 e Demarcation Stone with letter cut 75 x 15 x Each L22.O0
15cm
30 f Edge Stone 45 x 15 x 15 cm Each 55.50
31 s(i) T.R.S. Bench mark stone the exposed surface Each 140.00
neatly dressed to a height of 15cm including
cutting letters 15 x 15 x 60cm
32 s(ii) T.R.S. Bench mark stone the exposed surface Each 10 1.00
neatly dressed to a height of 15cm including
cutting letters 10 x 10 x 25cm
33 46a Guard Stone (Two line dressed for 45 cm) 23cm Each 162.00
dia 1.0m long
34 b Guard Stone (Top O.7m chisel dressed and Each 173.00
0.50m bottom roughly dressed) 0.23 x 0.23 x
1.20m long. Two line dressed top 45cm) 23cm
dia 1.0m long
35 c Guard Stone (Top 0.7m chisel dressed and Each 162.00
0.50m bottom roughly dressed) 0.23 x 0.23 x
0.90m long. Two line dressed top 45 cm) 23cm
dia 0.90m long
36 d Guard Stone (Top 0.7m chisel dressed and Each 113.00
0.50m bottom roughly dressed) 0.15 x 0.15 x
0.90m long. Two line dressed top 45 cm) 23cm
dia 0.90m long
37 e Guard Stone 23cm dia 0.90m long Each 83.40
15
Basic Rate
Sch.
sl. Item Description of Materials Unit approved for the
No. year 2O21-2022
No,
(w.e.f. 13.09.21)
3B 59 Sand for Mortar x cum. 447.O0
New Item
5 The rates for items other than those mentioned above are to be adopted from tfre Sc5eOute
of Rates issued by the Engineer-in-Chief (Buildings) & Chief Engineer (Buildings), Chennai
Reqion, Chennai -5.
ll lll
Engineer-i ief, WRD &
Chief Engineer (General), pWD,
Chennai - 5.
ry
16
ANNEXURE.III
RATES OF WORKS
17
Sch. Basic Rate
s!. Item Description of Works approved for the
No. Unit year 2O21-2022
No.
(w.e.f. 13.O9.21)
C, Quarrying and Blasting
18
Sch" Basic Rate
sl .
Item Description of Works approved for the
No. Unit year 2O2t-2O22
No.
(w.e.f. 13.O9.21)
44 50c Trimming the bed and the side slope of the bank sqm. 19.90
in all soils except hard rock upto a thickness of 7.5
cm to 15 cm and making it ready to receive the
concrete
45 50D Sectioning during forming bunds when earth cum. 12.00
moving machinery, lorries and rollers are used for
consolidation.
19
Sch. Basic Rate
sl .
Item Description of Works approved for the
No. Unit year 2O21-2022
No.
(w.e.f. 13.09.21)
57 B By power roller including hire charges cum. 33.60
20
Sch. Basic Rate
sl .
ftem approved for the
No. Description of Works Unit
No. year 2O21-2022
(w.e.f. 13.09.21)
70 92A Sinking well in loose soils, tign--btack IoEon cum. 100.00
soil, sandy loam and ordinary soil under water
including bailing or pumping charges, if
necessary, etc., complete - First depth of 2
metres
77 928 Sinking well in Sand, inctuaing -bailing cum. 740.40
or pumping charges, if necessary, etc.,
complete - First depth of 2 metres
72 92C Sinking well in hard stiff clay, tight blai[ cotton cum. 740.40
soil, hard red earth, shales, murram, gravel,
stoney earth, and earth mixed with smali
size boulders and hard gravelty soil
including bailing or pumping charges if
necessary etc., complete - First depth of 2
metres
F. Rate for Earth Work - Oeptoying
Machinery
73 1 Earth work in all soils except- hard -lock cum. 50.10
requiring blasting and conveying for formation
of bund with lead of 0 to 100 metre deploying
earth moving machinery and tippers includini
benching, formation of bunds, bieaking clods]
sectioning etc., complete
74 1a trdrLn worK tn ail soils except hard rock cum. 3.9s
requiring blasting and conveying for formation
of bund with an extra lead of every 100 metre
or part thereof deploying earth moving
machinery and tippers including benchingl
formation of bunds, breaking clods, sectioning
etc., complete
75 2 trarEn worK oeploying earth moving
machinery for desilting channel and formin!
bund on either side and depositing the
on banks including jungle cleiranceeartf, etc
complete
76 a rng wtqtn up to JM cum. 29.50
77 b tg wtu[n oI 5m -1um cum. 36.2s
7B 3 trdrLn worK excavatton cleploying earth moving
cum. 42.70
machinery for desilting channel having a width
of more than 10m and forming bund on either
sides and depositing the earth on banks
including jungle clearance etc complete
2L
sl Sch. Basic Rate
.
No.
Item Description of Works Unit approved for the
No. year 2O21-ZO2Z
gr Lrr r LnAK(iEs - Concrete - Brick _fty.e.f. 13.09.21)
or Stone Masonry - Above or Below Ground
Level
STATEMENT I
A r-oncrere - ADove Ground Level
79 1 Atte ro rne Dastc rates for works upto 4.50M cum.
height in ground floor (height to be reckoned 103.30
from floor level ie., plinth levet in Ct;
BO 2 lruu rur worKs tn every upper floor over the rate cum.
of preceding floor 203.50
!rt ll
22
Sch. Basic Rate
sl .
Item approved for the
No. Description of Works Unit
No. year 2O21-2022
(w.e.f. 13.09.21)
9B (iii) Driving bamboo / casurina 7 eucatyptus pitEs into RM 19.90
ground beyond 1m depth from ground level. For
every 1m (or) part thereof
M. River Conservancy of Korambu Works
I
99 375A Brush wood bundles one metrelirttrTna-one one 3.80
metre long within an initial lead of 1.6 K.M. bundle
100 3758 Extra for every additional leaA@ one 0.45
above item) bundle
101 37BA Driving casurina piles in@ RM 9.65
scaffolding etc., complete
102 37BB Lasunna wautng pieces 40 mm to 50 mm RM 13,45
di.ameter including fixing with nails and tying
with ropes
r. EreaKtng Metals
103 50A Labour _ charges for ffi cum. 350.00
metal from departmental blasted stones
704 508 LaDour cnarges for breaking 20mm cum. 524.00
metal from departmental blasted stones
105 50c Lapour cnarges for breaking 50mm cum. 210.00
metal from departmental blasted stones
Note: llleDd5lCKaIeaoopteounderthisHead,',Annexure-III_Ratesoffi
all taxes and GST.
FrlrlT N'TTE
DISMANTLING
\<V^^IIIIII AIIIJ I'LA:'II.N(J - APPLICABLE FOR SCHEDULE ITEM T.TO.
Sg ANd 39A
I rrE uELruLlrurr tJr +u"/o ls [o De maoe tor
the quantity of voids
payment is for the lesser of the two viz. solid measurement on stock meaiurement and
(or) stock ,"uirrur.nt
minus 4Oo/o of stock measurement for voids.
%
2 Tha ratoc f
or stock ,n"ur,."rl.i,!",11'ib1r"'l;,ff;r"&,H:*:?Jl:tJr.'+r:::
for head load only' The-Notes 3, 4, 5 under (o) earth work ;11 #""Hffig;,:"
Item No.39, 39A and 40A shall be applicable to Schedule
23
Standard specificatiorr
bank and compacting by watering and consolidition in accordance
with TNBp.
Standard specification No.20B d
require neat banking in accordance with the standard splcifications.
Double the relevant rate for stan
;:H:::j?:f,,..,:-"ll':*:":g'i:.? .1?.","_.|".r
foundationt buiroinsr,.uo,i**ts, piers,
wings and returns of bridges, culverts, sluices, regulatois and cross ,uronrr?o?lT,t'
retaining walls, toe walls, cut-off walls and uoiv iatG
oianicuts, weirs, retaining walls of
causeway, bed dams, trenches for water supptf and drainage
works for laying pipes and
sewers, pits and avenue trees, trial pits and pifs for poles
and towers and toe wall for
revetment.
An extra 50o/o over the rate of ordinary excavation in
all soils, the rock classification given
above shall be allowed fordrains, channels and canal
niving bed width 1.25 metre and
below' The extra percentage is applicable only f*;;pil
upto 2 metre; the depth being
measured from the bottom of excavation.
fli.','Jt','1T1"t-X"*Ti"^".*"'lP::ll:::1?:;;;;id;anners
width anJ .inur hlvins
tvil tg uefl
bed
1'25 metre to 2 metre. The extra percentage is applicable
metre. The depth being measured from the bott6m oiixcavation. only for depth upto 2
ia merre of
fl:ll"i.ff"T:d
The rates do not include
l"T 10olo
(or) i{#:^:^""TJ::y:,f:rl",lle^,?|;y:qfoi.a":*"t"iins ror estimate purpose. Acruars
wherever is ress ro be arowed for de-wat";in;'.#;irl""i=ol1'#r"""lr.i::li"J:
above this percentage, prior approval of the superinienJing
rngineer should be obtained.
For open well excavation
rates beyond t2 metre depth, *ri: piogress should
ili,tlafi.UaJ"": be BX, Lox,72x,
SINKING OF WELLS
l'"fl",,ry,j:jL
::y#:T upto ll;-;;i;'#pii.lor" ror open excavation shal be
adopted the depth iJ:^y_::^o:':n:
at which tire water is mei'with]'=a:rffi''.,ff"iffiti".[tffi',1:
underwater shatl be the rate for ilre previorr'rtug"
Bl,['3] ,nde, open werr excavation
24
4 A schematic working sheet for open well excavation and sinking of wells for deriving the
rates is given below:
Open Well Depthinmetes Sinking of Wells
X 2
2X 4 2Y
3X 6 4Y
4X B 6Y
5X 10 BY
6X .L2 t2 10Y
metre
BX t4 13Y
10X and 16 16Y and so on
so on
Note: X - Basic rate for open well excavation
Note: Y - Basic rate for sinking well
LIFT CHARGES . CONCRETE . BRICK OR STONE MASONRY ABOVE OR BELOW GROUND LEVEL
General The rates for items other than those mentioned above are to Oe aOopteO frorn tfre ScneO*
of Rates issued by the Engineer-in-Chief (Buildings) & Chief Engineer (Buildings), Chennai
Region, Chennai -5.
Tr7lr'
hier wRo a
Chief Engineer (General), PWD,
Chennai - 5. (Member)
ryr"
25
ANNEXURE-VIII
RATES OF NEW TECHNIQUES
Geogrids
26
sl. Basic Rate approved
No. Description Unit for the year
202L-2022
(w.e.f. 13.09.21)
17 Synthetic Geogrid having uttim@ sqm. 1025.00
kN /m
1B Synthetic Geogrid having urtim@ sqm. 1000.00
kN /m
19 Synthetic Geogrid having Utti@ sqm. 1088.00
kN/m
Drainage Composite
21
sqm. 630.00
-G^"^o-Ylll:tjc
thermobonding a draining core _ HDPE guonui
comprises of t*9 sgts of parallel orertayeiA- riOi
integrally connected to have a rhomboidal shape *itn -u
polyethylene film and a nonwoven Geotextiles
navint
mass per unit area L3O g/m2 and tensile strength
of 3.6
kN/m h.aving in ptane_ flory gaOacity of O.7 L (ms)-ai
7
hydraulic gradient of 1.0 & 20 kpa pressure and
tensile
strength of 13.5 kN/m with mass per unit area of g30
gsm,.
II. RATES OF WORKS
A. Geosynthetics - Geotextiles
27
Basic Rate approved
sl. for the year
No.
Description Unit 202L-2022
(w.e.f. 13.09.21)
4 Providing and laying needle punched and mechanically sqm. 140.00
bonded Non-woven Geotextiles of Type-I
indigenously manufactured from high quality fibres on the
prepared subgrade for separation as per MORTH
Specification 702
5 Providing and laying needle punched and mechanically sqm. 125.00
bonded Non-woven Geotextiles of Type-II
indigenously manufactured from high quality fibres on the
prepared subgrade for separation as per MORTH
Speciflcation 702
6 Providing and laying needle punched and mechanically sqm. 110.00
bonded Non-woven Geotextiles of Type-III
indigenously manufactured from high quality fibres on the
prepared subgrade for separation
B. Geosynthetics - Geomembranes
28
Basic Rate approved
sl. for the year
No. Description Unit
202L-2022
(w.e.f. 13.09.21)
C. Geogrids
29
Basic Rate approved
sl. for the year
No.
Description Unit
202L-2022
(w.e.f. 13.O9.21)
72 Supplying and laying of Bi-Axial Extruded High sqm. 193.45
Modulus Polypropylene Geogrids conforming to MORTH
SPECIFICATION for base/sub-base reinforcement having
minimum Tensile Strength 20 kN/m in the
longitudinal and transverse direction, with 7 kN/m and
L4 kN/m tensile strength at 2o/o and 5o/o strain
respectively in the longitudinal and transverse direction,
junction efficiency not less than 95olo and with 38mm
138mm mesh opening.
13 Supplying and laying of Bi-Axiat Extruded High sqm. 296.45
Modulus Polypropylene Geogrids conforming to MORTH
SPECIFICATION for base/sub-base reinforcement having
minimum Tensile Strength 3O kN/m in the longitudinal
and transverse direction, with 10.5 kN/m and 21kN/m
tensile strength at 2o/o and 5olo strain respectively
in the longitudinal and transverse direction, junction
efficiency not less than 95olo and with 38mm x 38mm
mesh opening.
L4 Supplying and laying of Bi-Axial Extruded High sqm. 428.90
Modulus Polypropylene Geogrids conforming to MORTH
SPECIFICATION for base/sub-base reinforcement having
minimum Tensile Strength 40 kN/m in the
longitudinal and transverse direction, with 14 kN/m
and 28 kN/m tensile strength at 2o/o and 5olo strain
respectively in the longitudinal and transverse direction,
junction efficiency not less than 95olo and with 38mm
d 38mm mesh opening
15 Providing and laying Fibreglass Geogrids of Tensile sqm. 150.00
Strength - 5O kN/m manufactured from high quality
fibre glass strands and coated with a polymei modified
bitumen as reinforcement to asphalt overlay flexible
pavements and asphalt over distressed grid pCC as per
MORTH Specification 708
30
Basic Rate approved
for the year
202L-2022
(w.e.f. 13.09.21)
D. Geosynthetic Clay Liners (cCL)
31
Basic Rate approved
for the year
202L-2022
(w.e.f. 13.09.21)
Supplying and laying of drainage composite for use behind sqm.
walls, between two different fills, alongside drains of
road, below concrete lining of canals etc. having
thermobonding a draining core - HDPE geonet comprises
of two sets of parallel overlayed ribs integrally connected
to have a rhomboidal shape with a polyethylene film
and a nonwoven Geotextiles having mass per unit area
130 gsm and tensile strength of 8.0 kN/m that will be
working as separation or protecting layer, Geocomposite
having in plane flow capacity of 0.7 L/ (m.s) at hydraulic
gradient of 1.0 & 20 kPa pressure and tensile strength of
13.5 kN/m , with mass per unit area of 830 gsm, at easily
accessible location including top and bottom, with all leads
and lifts, materials, manpower and machinery, materials,
labour etc., complete and as directed by Engineer-in-
Charge
32
Basic Rate approved
for the year
2(J2L-2022
(w.e.f. 13.O9.21)
Providing and making Gabion structure with cum.
Mechanically Woven Double Twisted Hexagonal Shaped
Wire Mesh Gabion Boxes as per IS 16014:201g, Sp
116:2018 of required size, Mesh type 10 x t2
(D=100mm with tolerance of 3- 2o/o), Zinc +
loa/o Aluminium Alloy + PVC Coated, Mesh Wire
diameter 2.7 / 3.7mm (IDIOD), mechanically edged /
selvedged with partitions at every 1m interval and
shall have minimum 10 numbers of openings per
meter _of mesh perpendicular to twist, tying with lacing
wire of diameter 2.2/ 3.Zmm (IDIOD), supptied @3%
by weight of Gabion boxes, filled with boulders with
least dimension of 200mm, as per drawing, all
complete as per directions of Engineer-in-Charge
Stttu
EngineerT hief WRD &
Chief Engin 6r (General), pWD,
Chennai - 5. (Member)
33
&ot'
ANNEXURE.XII
RATES OF GATE / HOIST AND ALLIED WORKS FOR TRRIGATION PROJECTS
Basic Rate
sl. approved for the
No.
Description of Machi neries Unit year 2O2L-2O22
(w.e.f. 13.09.21)
GATES AND HOISTS FOR DAM
I
1 Design, fabrication, supply, erection and commissioning of Tonne 194500.00
embedded parts consisting of sill beam, wall plates, seal
seats, anchors, anchor girders, yoke girders, tie flats,
trunnion supports, rope and pulley supports etc., with all
accessories for spillway radial gates including cost of all
materials, machinery, labour, cutting, aligning, anchoring,
welding, finishing, cleaning, applying one coat of zinc rich
epoxy primer and four coats of cold applied coal tar epoxy
paint etc., complete as per speciflcations and approved
drawings with lead upto 1 km and all lifts for structural steel
components and all leads and lifts including packing /
forwarding charges for other materials.
Note:
1. Wt of 1 set embedded parts in tonnes
-- O.OL77 x (L2 x H x h)o'ozs
Where
(L) is length in m = clear distance between piers
(H) is height of radial gate in m = FRL - Sill level + 0.15 m
(h) is head of water above sill of gate in m = FRL - Sill level
2. Quantity of structural steel = 97.9o/o of computed weight of 1
set
2 Design, fabrication, supply, erection, testing and Tonne 245500.00
commissioning of radial gate consisting of skin plate,
stiffeners, horizontal girders, sector arms, trunnion
assemblies, tie beam, pulley supports, bracings, rubber
seals, clamps etc., with all accessories for spillway including cost
of all materials, machinery, Iabour, cutting, bending,
aligning, anchoring, welding, finishing, cleaning, applying
one coat of zinc rich epoxy primer and three coats of
cold applied coal tar epoxy paint, seal fixing etc., complete as
per specifications and approved drawings with lead upto 1 km
and all lifts for structural steel components and all leads and lifts
including packing / forwarding charges for other materials.
Note:
1. Weight of 1 spillway gate in tonnes
= 0.0710 x (L2xHx[;o.oza
Where,
(L) is length in m = clear distance between piers
(H) is height of radial gate in m = FRL - Silt level + 0.15 m
(h) is head of water above sill of gate in m = FRL - Sill level
2. Quantity of structural steel = 92.5o/o of computed weight of 1
gate
34
Basic Rate
sl. Description of Machineries approved for the
No. Unit year 2O2L-2O22
(w.e.f. 13.09.21)
3 Design, fabrication, supply, erection, testing and Tonne 59800.00
commissioning of electrically operated rope drum hoist with
deck bridge of adequate capacity consisting of base frames, rope
drums, connecting shaft, gear system, brake system, electric
motor, wire ropes, gate position indicator, manual operation
arrangement etc., with all accessories for spillway radial gate
including cost of all materials, machinery, labour, cutting,
aligning, anchoring, welding, finishing, cleaning, greasing,
providing hand railing and approach staircase with gate to hoist
platform, applying two coats of zinc chromate red oxide
primer and three coats of approved synthetic enamel paint
etc., complete as per specifications and approved drawings
with lead upto 1 km and all lifts for structural steel
components and all leads and lifts including packing /
forwarding charges for other materials.
Note:
1. Hoist capacity in t including 25 o/o reserve capacity= 1.5 x
Wt. of gate(Hoist capacity shall be rounded off to next 10
tonne)
2. Weight of hoist with all accessories: 175 kg. per tonne
capacity of hoist2. Quantity of structural steel = 39.2o/o of
computed weight of t hoist
35
Basic Rate
sl. approved for the
No.
Description of Machi neries Unit year 2021-2022
(w.e.f. 13.o9.21)
5 Design, fabrication, supply, erection and commissioning of Tonne 323300.00
embedded parts consisting of sill beam, slide tracks, seal
seats, guide rails, dogglng sets for storage of stop log
elements etc., with all accessories for spillway stop log gate
elements including cost of all materials, machinery labour,
cutting, aligning, welding, anchoring, finishing, cleaning,
applying one coat of zinc rich epoxy primer and four coats of cold
applied coal tar epoxy paint etc., complete as per
specifications and approved drawings with lead upto 1 km and all
lifts for structural steel components and all leads and lifts
including packing / forwarding charges for other materials.
Note:
1. Wt of 1 set embedded parts in tonnes
= 0.0025 x (L2 x H x h)0.716
Where(L) is length = clear distance between piers + 0.65 m
(H) is total height of stop log gate in m = FRL - Sill level +0.20 m
(h) is head of water above sill of gate in m = FRL - Sill level
Note:
1. Total wt of 1 set stoplog elements in tonnes
= 0.0553 x (L2 x H x hlo.zte
Where
(tl is length = Clear distance between piers + 0.65 m.
(H) is total height of stoptog gate in m = FRL - Siil levet +
0.20 m
(h) is head of water above sill of gate in m = FRL - Sill level
36
Basic Rate
Description of Machi neries approved for the
year 2O2L-2O22
(w.e.f. 13.O9.21)
Design, fabrication, supply, erection, testing an- Tonne 193200.00
commissioning of automatic lifting beam with all accessories for
handling, lowering and lifting of spillway stop log gate
elements including cost of all materials, machinery, labour,
cutting, aligning, welding, finishing, cleaning, applying one
coat of zinc rich epoxy primer and two coats of cold applied coal
tar epoxy paint etc., complete as per specifications and approved
drawings with lead upto 1 km and all lifts for structural steel
components and all leads and lifts including packing /
forwarding charges for other components / materials.
Note:
1. Weight of lifting beam in tonnes
= 0.O22L2x (L2 x H x h)o.zro 7 p
Where(L) is length = clear distance between piers + 0.65 m
(H) is total height of stoplog gate in m = FRL - Sill level +0.20 m
(h) is head of water above sill of gate in m = FRL - Sill level
(n) is number of gate elements in 1 set
2. Quantity of structural steel = 94.r o/o of computed weight of 1
No.
37
Basic Rate
sl. approved for the
No.
Description of Machineries Unit year 2021-2022
(w.e.f. 13.09.21)
9 Design, fabrication, supply, erection and commissioning of rail RM 9200.00
track using 45 kg / m standard rails on spillway bridge for
movement of gantry crane for handling and operating spillway
stop log gate elements / river sluice / canal sluice emergency gate
including cost of all materials, machinery, labour, aligning,
anchoring, welding, cleaning, applying one coat of zinc rich
epoxy primer and two coats of cold applied coal tar epoxy paint
for buffers and rail supporting plates etc., complete as per
specifications and approved drawings with lead upto 1 km
and all lifts for structural steel components and all leads and
lifts including packing / forwarding charges for other materials,
Note:
1. Weight of gantry track including fixtures: 100 to 105 kg / RM
of track. (weight per metre includes rails with fixtures on boffr
sides)
2. Quantity of structural steel = 5.3olo of computed weight of track
38
Basic Rate
approved for the
year 2O21-2022
(w.e.f. 13.09.21)
Design, fabrication, supply, erection and commissioning of Tonne 192800.00
embedded parts ( with groove riner upto breast wall tevLt
)
consisting of sill beam, wheel tracks, seal seats, guide rails, breast
wall liner ( upto one vent height plus 1 m above the roof of vent
) etc., with all accessories for river / canal sluice service gate
including cost of all materials, machinery, labour, cutting,
aligning, anchoring, welding, finishing, cleaning, applying
one coat of zinc rich epoxy primer and four coats of coto apptieo
coal tar epoxy paint etc., complete as per specifications and
approved drawings with lead upto 1 km and all lifts for structural
steel components and ail leads and rifts incruding packing
forwarding charges for other materials.
/
Note:
1. Wt of 1 set embedded parts in tonnes
= 0.0444 x (L2 x H x h1o.0ss
weight of breast wall rining: 250 kg / sqm of breast wall weight
of groove liner: 200 kg. / sqm of groove lining
Where(L) is length = clear vent opening in m1 0.70 m.
(H) isheight of gate in m = Clearvent height in m + 0.30 m
(h) is head of water above sill of gate in m = FRL - Sill level
39
Basic Rate
sl. approved for the
No. Description of Machineries Unit year 2O2L-2O22
(w.e.f. 13.O9.21)
13 Design, fabrication, supply, erection, testing and Tonne 176500.00
commissioning of fixed wheel type vertical lift service gate
consisting of skin plate, vertical and horizontal girders,
wheels, stiffeners, lifting brackets, guide rollers, ballast
blocks, teflon claded rubber seals etc., with all accessories for
river sluice /canal sluice vent including cost of all materials,
machinery, labour, cutting, aligning, welding, finishing,
cleaning, applying one coat of zinc rich epoxy primer and
three coats cold applied coal tar Opoxy paint, seal fixing etc.,
complete as per specifications and approved drawingi with
lead upto 1 km and all rifts for structural steel com[onents
and all leads and lifts including packing / forwarding charges for
other materials.
weight of hoist with alr accessories: 250 kg. per tonne capacity
of hoist
40
Basic Rate
sl. approved for the
No. Description of Machineries Unit year 2O2L-2O22
(w.e.f. 13,09.21)
15 Design, fabrication, supply, erection and commissioning of Tonne 261800.00
embedded pafts (without groove liners) consisting of sill
beam, wheel tracks, seal seats, guide rails, breast wall liner upto
lm height above the roof of vent etc., with all
accessories for river /
canal sluice emergency gate including cost
of all materials, machinery, labour, cutting, aligning, welding
anchoring, finishing, cleaning, applying one coat of zinc rich
epoxy primer and four coats of cold applied coal tar epoxy paint
etc., complete as per specifications and approved drawings with
lead upto 1 km and all lifts for structural steel componenti and
all leads and lifts including packing / forwarding charges
for other components / materials.
4t
Basic Rate
sl. approved for the
No. Description of Machineries Unit year 2021-2022
(w.e.f. 13.O9.21)
L7 Design, fabrication, supply, erection, testtng and Tonne 175700.00
commissioning of fixed wheel type vertical lift emergency
gate consistingof skin plate, horizontal and vertical girders,
wheels, stiffeners, lifting brackets, guide rollers, ballast
blocks, teflon claded rubber seals etc., with all accessories for
river sluice / canal sluice vent including cost of all materials,
machinery, Iabour, cutting, aligning, welding, finishing,
cleaning, applying one coat of zinc rich epoxy primer and
three coats of cold applied coal tar epoxy paint, seal fixing
etc., complete as per specifications and approved drawingi
with lead upto 1 km and all lifts for structural steel
components and all leads and lifts including packing /
forwarding charges for other materials.
42
Basic Rate
sl. approved for the
No. Description of Machineries Unit year 2021-2022
(w.e.f. 13.09.21)
II GATES AND HOISTS FOR BARRAGE:
Note:
1..Weight of 1 gate in tonnes = 0.0335 (L2 x H x h)o.zro
Where,
(L) is length = Clear distance between piers in m +1m
(H) is total height of gate in m = FRL - Sill level + 0.20 m
(h) is head of water above siil of gate in m = FRL - Si[ rever
43
Basic Rate
sl. approved for the
No. Description of Machineries Unit year 2O2L-2O22
(w.e.f. 13.09.21)
27 Design, fabrication, supply, erection and commissioning of Tonne 153600.00
structural steel hoist bridge consisting of columns, beams,
bracings, stiffeners, ties, chequered plate covering, hand
railing, ladder etc., with all other accessories for supporting
rope drum hoist for operating barrage gates including cost of all
materials, machinery, labour, cutting, aligning, anchoring,
welding, finishing, cleaning, applying two coats of zinc
chromate red oxide primer and three coats of approved
synthetic enamel paint etc., complete as per specifications
and approved drawings with lead upto 1 km and all lifts for
structural steel components and all leads and lifts including
packing / forwarding charges for other materials.
Note:
1. Columns (with bracings / anchors / stiffeners): 400 kg. per
metre height
Beams (with cross beams/ stiffeners): 400 kg. per metre
spanRailing / Chequered plate / Ladder etc: 10 o/o of wt
columns / beams
Weight proposed includes all columns / beams for t hoist.
44
Basic Rate
approved for the
year 2021-2022
(w.e.f. 13.O9.21)
AUTOMATIC OUTFLOW REGULATING GATE FOR
45
Basic Rate
st. approved for the
No. Description of Machineries Unit year 2O2L-2O22
(w.e.f. 13.O9.21)
25 Design, fabrication, supply, erectio@ Tonne 261700.00
commissioning of hoisting cum damping system consisting of low
level horizontal lever link, low lever rong aciuating lever, hilh level
vertical lever link, high level short actuating lever, high- Ievel
hoisting bracket, axle for lever system, rriction shoes,
supporting box for shoes, rack assembly, ratchet pawl, supporting
structure, bracket plate etc., with all accessories for' outflow
regulating automatic aate including cost of all materials,
machinery, labour,
.cutting, aligning, anchoring, welding,
finishing, cleaning, apprying one coat zinl'rich epoxy firimei ano
three coats of cord appried coar tar epoxy paint etc., comprete
as per specifications and approved drawings with lead upto
1 km and alr rifts for structurar steer components and
all leads and rifts incruding packing / rorwaroing ihurg".
for other materials.
Note:
1. Weight of h_oisting cum damping system in tonnes
= 0.0695 x (L2 x H x hlo.ozs
Where,
(L) is length = Clear distance between piers in m.
(H) is height of gate in m = FSL - Sill tevel + 0.20 m
(h) is head of water above siil of gate in m FSL - siil rever
=
2. Quantity of structural steel = g4.2o/o of computed weight
gate,
for 1
46
Basic Rate
approved for the
year 2O21-2OZz
(w.e.f. 13.09.21)
Design, fabrication, supply Tonne
commissioning of
radiar gate consisting of skin- prate,
stiffeners, horizontal girlers, sector arms, trunnion
assemblies, tie beam,.pulley supports, bracings, rubber seals,
seal
clamps etc., with ail accessories for canal ieguratoi incruoing
cost of all materials, . machinery, labour, Jutting, bending]
alignin_9, anchoring, welding, finishing, cleaning, .fiirfying on"
coat of zinc rich epoxy primer and three coats of c6io appiieo
coat
tar epoxy paint, sear fixing etc., comprete as per speciflcations
and approved drawings with read upto 1 km and ail rifts for
structural steel components and all leads and lifts inctuoing
packing / forwarding charges for other materials.
Note:
1. Weight of 1 radial gate in tonnes
= 0.1685 x (L2 x H x h;o.ozs
Where
(L) is length = Clear distance between piers in m
(H) is height of gate in m = FSL - Sill level + 0.20 m
(h) is head of water above sill of gate in m FSL - Siil revel
=
2. Quantity of structurar steer = 94.3o/o of computed weight for 1
gate
Tonne 83100.00
g or u"o Io u u,'Joj#1.,.r" !i!l'."rt,, r'"",;:Ln --Jrrrr,
co m m i ss i o n i n
.il:
drum hoist conststing of hoist' ptatforms, ibl" "o
connecting shaft, gear system, electric motol, etectro_
magnetic brake system, control panel, pulleys, wire -rope,
manual operation system, railing, taOder Ltc., w-itn all
accessories for operating canal regulator radial gate
including cost
-;llgning,
of att materials, machinery, tabour,
. .i,tia.;;
cieaning ,greasing, -apptyirig two
-
anchoring, welding, finishing,
coats of zinc chromate red oxide primer and trrree
appro_ved synthetic enamel painL etc., complete
ioais or
specifications and approved drawings with read ,pi;l
; per
lifts for structurar steer componJnts and ail reads uno k, Jnd arl
including packing / forwarding charges for other materials. rin,
Note:
1. Capacity of hoist in t with 25 o/o reserve capacity
= 2.00 x Wt of gate
(.ryqi..t capacity shail be rounded off to next 5 tonne)
weight of hoist with ail accessories: 300 kg per tonne
capacity of
hoist
47
Basic Rate
approved for the
year 2O21-ZOZT
(w.e.f. 13.O9.21)
Design, fabrication,
Tonne
capacity manuauy operaied rope
-ptatforms,
::,T't:,^:,ile--"1-,19:quate
consisting of hoist
*i .["]st_,shaft, gear system, brake
I connecting iop" drrr.,
system, pulleys, wire
rope, manual operation system, railing, ladder 'with
etc., all
accessories for operating canal regulator radial gate
includingcost
of all materials, machinery, labour, cutting, aligning
anchoring,
welding, finishing, cleaning, greasing, applying two
coats of
zinc chromate red oxide primer and three'.o.tr-oi -uppioruo
synthetic enamer paint etc., comprete as per
speciiications
and approved drawings with read upto 1 km and
structurar steer components and ail reads and
a, rifts for
packing
rifts incruding
/ forwarding charges for other materials.
Note:
1. Capacity of hoist in t with 25 o/o res€rve capacity=
2.00 x Wt of
gate (Hoist capacity shall be rounded off to next -
Design, OO
Tonne 272200.00
:f:yi:1,1:n:!,*lll-l"o sear seat
wheel tracks, seal seats, guide rails, groove
)
consistins ;:iri;;",",
lining upto top
etc., with all accessories for verticar rift roiler gate
for .Inui
/ regulator incruding cost of ail materiars, machinery, "r.upu
rabour,
cutting, aligning, anchoring, welding, finishing, cleaning,
applying one coat of zinc rich epoxy primer
and four coats of cold
applied coar tar epoxy paint etc., comprete as per
specifiiations
and approved drawings with read upto 1 km
and ail rifts for
structural steer components and ail reads and
packing rifts inctloing
/ forwarding charges for other materiars.
Note:
1. Wt of 1 set of embedded parts in tonnes
= 0.1332 x (L2 x H x h;o.oss
Where,
(L) is length = Clear vent width in m +
0.50 m
(H) is height of gate in m Ctear vent
= height in m + 0.20 m
(h) is head of water above siil of gate in
m FSL - = siil rever
4B
Basic Rate
Description of Machineries approved for the
year 2O2L-2OZT
(w.e.f. 13.O9.21)
Design, fabrication, su Tonne
wheet verticat tift sate 1 wiin"top
:"T:::l:lns.of
). f!1ed prate,
consisting of skin
typ.-e-
iiin"n"rs, n"iii"rL)
'uno sear
girders, wheels, guide rollers, rubber seals Jlrti."r
. etc.,
accessories for canal escape / regulator vent including
witn all
cosi of all
materials, machinery, labour, cutting, aligning, wetaini,
iinLning,
cleaning, applying one coat of Tinc -rich-' epoxy
three coats of cold applied coal tar epoxy paint, ,"it f,rimer
anO
complete as per specifications and approved drawings
ri*in!
upto 1 km and ail rifts for structurar steer .orponuni,
-una"t..,
witf, teao
ail
leads and rifts incruding packing / forw'aroing in..g", ro.
other materials.
Note:
.1..Weight of 1 gate in tonnes = 0.0BBB (L2 x H x h)o.oss
Where
(L) is length = Clear vent width in m + 0.50
m
(H) is height of gate in m = crear vent height
in m +
(h) is head of water above sill of gate in m FSL - 0.20 m
= Sill lever
2. Quantlty of structurar steer = 92,!o/o of computed weight for 1
gate
49
sl. Basic Rate
No. Description of Machineries Unit approved for the
year 2O2L-2O22
(w.e.f. 13.O9.21)
33 Design, fabrication, supply,
Tonne 206300.00
embedded parts consisting of sifl beam, wheer tracks, sear
seats, guide rails, gate groove liners etc., with all accessories
ror
canal escape / regurator stop rog gate incruding cost of ail
materials, machinery, labour, cutting, aligning, anchoring,
welding, finishing, cleaning, applying one coat zinc rich epoxy
primer and four coats of cord appried coar tar epoxy paint
etc.,
complete as per specifications and approved drawings with
lead upto 1 km and ail rifts for structurar steer com[onents
and all leads and rifts incruding packing / forwarding charges
for
other materials.
Note:
1. Wt of 1 set of embedded parts in tonnes
= 0.0665 x (L2 x H x hlo.zro
Where,
(L) is length = Clear distance between piers in m + 0.50
m.
(H) is total height of stoprog gate in m FSL - silr rever
= +0.30 m
(h) is head of water above sill of gate in m FSL - sill
= level
50
Basic Rate
Description of Machineries approved for the
year 2021-2OZz
(w.e.f. 13.09.21)
GATES ANO HOI,STS FOR PUM
Design, fabrication, supply,
Tonne 198800.00
embedded parts consisting of liners for trash rack grooves
(for
coarse and fine screens) with ail accessories ror
fump house
intake structure incruding cost of ail materiars, machinery,
labour, cutting, aligning, anchoring, welding, finishing,
cleaning, applying one coat of zinc rich epoxy primer
and four
coats of cold applied coal tar epoxy paint etc., complete
as
per specifications and approved (rawings with
lead upto 1 km and
all lifts for structural steel components and ail reads and rifts
including packing / forwarding charges for other materials.
Note:
1. Wt of 1 set of embedded parts in tonnes
= 100 to 125 kg / m height
2. Quantity of structurar steer = 100.0olo of computed weight
for
1 set.
Design, fabrication, supply,
Tonne 136500.00
trash racks consisting of a number of paners or suitaor"
height with verticar trash bars werded to structurar
steer
frame at wider intervar and provided with werd mesh
frame for
pump house intake structure including cost of all
materials, machinery, labour, cutting, aiigning, welding,
finishing, cleaning, applying one coat of zinc rich
epoxy
primer and four coats cord appried coar tar
epoxy paint etc.,
complete as per specifications and approved drawings'
with read
upto 1 km and ail rifts for structurar steer compon-ents
and ail
leads and rifts incruding packing / forwarding charges
for other
materials.
Note:
t. Wt of trash rack panels for 1 vent in tonnes
= 0.0375 x (L2 x H x h)0.716
Where
(L) is length = crear distance between piers in
m + o.2o m
(H) is total height of trash rack panets in m
(h) is head of water above siil of trash rack in m
= FSL - siil rever
2. Quantity of structural steel = 100.0olo of computed
51
Basic Rate
sl. approved for the
No. Description of Machineries Unit year 2021-2022
(w.e.f. 13.o9.21)
37 Design, fabrication, supply, ere Tonne 206300,00
embedded parts consisting of sill beam, wheel tracks, seal
seats, guide rails, gate groove llners etc., with all accessories for
pump house intake stop log gate including cost of all
materials, machinery, labour, cutting, aligning, anchoring,
welding, finishing, cleaning, applying one coat zinc rich epoxy
primer and four coats of cold applied coal tar epoxy paint etc.,
complete as per specifications and approved'drawings with
lead upto 1 km and ail rifts for structural steel com[onents
and all leads and lifts including packing / forwarding charges for
other materials.
Note:
l.Wt of 1 set of embedded parts in tonnes
= 0.0665 x (L2 x H x h;o.zro
Where,
(L) is length = Clear distance between piers in m + 0.50 m
(H) is total height of stoplog gate in m = FSL - siil tevel +0.30
m
(h) is head of water above siil of gate in m FSL - siil rever
=
2' Quantity of structural steer = 95.9o/o of computed weight for 1
set.
52
Basic Rate
Description of Machineries approved for the
year 2021-2022
(w.e.f. 13.O9.21)
Design, fabrication, supply, erection and commissioning of Tonne
electrically operated mono-rail hoist assembly consistin! of
electric motor, rope drum, gear system, wire iope with li-fting
attachment, festoon cabling etc., with all accessories for
operating pump house stop-log gate including cost of all
materials ( excluding providing mono-rail hoist supporting
structure and mono-rail with fixtures ), machinery,' iabour,
cleaning, greasing etc., complete as per specifications and
approved drawings with all leads and lifts.
2. Mono rail beam with cross beams: 100 kg per metre rength
3. Quantity of structural steel = g7.go/o of computed weight for 1
span.
53
Basic Rate
approved for the
year 2O2L-2O22
(w.e.f. 13.O9.21)
Design, fabrication, suppty Tonne 238900.00
commissioning Eor crane consisting of doubre girder 5ox
type
construction, rail mounted end carriages with Tong and cross
travel arrangement, main and auxir-iary hoists "or ipecirieo
capacity, rails, pendant control, gear boxes, electric -[.,oto.r,
brakes, rope drums, wire ropes, s-heaves, end buffer stofpers,
pendant operated DSL bus bars with all accessories
for main and
auxiliary hoists for handling pumps and accesso.ils in pump
houge including cost of -all materials, macninery,'iu'Uorr,
cutting, aligning, welding, finishing, cleaning, jreising,
applying two coats of zinc chromate red oxide pliriei
ano
three_. coats of synthetic. enamel paint etc., complete
as per
specifications and approved drawings with all leads.,io
ririr.
Note:
1. EOT crane Main hoist capacity = 1,25 x Maximum lifting
load in
tonne
2. EOT crane auxiliary hoist capacity = 70 o/o of main hoist
3. Rate for Eor crane shail be based on capacity of main
hoist
S:TJ [tu'lXi;,t;:1j}l}j,""1{''i"^?:l',:-1q;n*;;#,,,,.tu,ar
basic steer 1 km read incruded in
rate shall be deducted rrom totar reao. fn6-qr;r;il'#'iirffi*,^:lJ:iij?t'#3:flJ;
out additional lead, Ioading and un-loading charges
snaii ne'as per Note: 2 under each item.
The basic rates are inc
and transportation of all materials other than
structuiaisteer from their roui." oi supply upto
work site' No lead charles shall be added for
materiars oirrer than structural steel.
Unless otherwise specirltC
the fabricated and bought out gate and hoist .ornpon"nir. -
54
B Thebasicratesareinclusiveofpreparatoryworkssuchasrec
shop painting, cleaning, positioning and anchoring first stage embedment's, cleining surface for
field painting etc.
9 The basic rates are exclusive of cost of river diversion dewatering, desilting etc.
10 Unlessotherwisespecified,thebasicratesforallitemsareonpertonn@
or per number shall be worked out on the basis of rate per tonne and the tonnage computed as
per detailed designs or as per empirical formulae furnished in the " Note " undeieach item.
11 Minimumdryfilmthicknessforzincrichepoxyprimerpaintandco'@
microns per coat and 100 microns per coat respectively
.;
72 TheBasicRateadoptedunderthisHead,''Annexure-xII-
Works for Irrigation Projects" is exclusive of all taxes and GST.
,trr
Engineer-i fWRD&
Chief Engineer (General), pWD,
Chennai - 5, (Member)
55
ANNEXURE-XIII
RATES OF HIRE CHARGES FOR PLANTS & MACHINERIES
Basic Rate
sl. approved
No. Description of Machineries Unit for the year 2O21-
2022
(w.e.f. 13.O9.21)
1 Pumping charges of concrete including hire charges of Cum. 233.00
pump, piping work and accessories etc,
2 Carriage of concrete by Transit Mixer Km./ 33.00
cum.
3 Cutting Saw Machine Day 1498,00
5 Air Compressor 250 cfm. with two teaAs ioiTnzumatrc Day 1776.00
Cutters / Hammers
6 Excavation of diaphragm wall OV tutEifranicaf CraO Sq.m 1443.00
NOTE:
1 rrrtr DdbrL KdLe aoopteo unoer tnls hlead, "Annexure-XIII - Basic Rates of Hire Charges for
Plants and Machineries" is exclusive of all taxes and GST.
2
li.'i7p",,."r) *"iJ""','J:ffiHff::ffiJH:?;J,';:ilTil:n'liT'o::;:::YH:'ff;lil:''
3 ges er prdnr macnrnery on per day basis are for single shift of EIGHT
working
hours.
-Pr01
Engine hier wRn g
Lnter Engtneer (General), PWD,
Chennai - 5. (Member)
8-'\d,,
56