Professional Documents
Culture Documents
+
Customer Segments
CR
T/ d
Landis+Gyr E650 Grid r-C ed cte
te nect nne
e n o
bi M t co er c
Large m ec rm
industrial Co - Dir nsfo AR
ra T/
customers -T -A c t e d e c t e
d
INVESTMENT PROTECTION THROUGH FLEXIBLE er
M et nne conn
MODULARITY e ct c o e r
Industrial customers tiv e rm
Ac - Dir nsfo
ra
-T
Commercial customers
Residential customers
03-11, 1 – Investment protection through flexible modularity 03-11, 2 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Overview The Landis+Gyr E650 Family - Overview
Apparent energy
3x127/220V
3x230/400V
3x58/100V
0.3(1.2)A
5 (120)A
ZMD402C
ZMD410A
ZMD310A
ZMD405C
ZMD410C
ZMD310C
ZMD405A
ZMD402A
ZFD405C
ZFD410A
ZFD402C
ZFD410C
ZFD405A
ZFD402A
3x100V
3x220V
5 (10)A
5 (20)A
1 (10)A
2 (4)A
1 (2)A
New in B31
03-11, 3 – Investment protection through flexible modularity 03-11, 4 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Overview The Landis+Gyr E650 Family - Overview
Modular or Simple Tariff Functions
ZxDxxxXR44.2407.c2 S3(a) ZxDxxxXT44.2407 S3(a)
integrated interface exchangeable modules ZMD405CRxx.0457.c1 S3
( type R ) ( type T )
Tariff Type Energy only
Energy and Demand
Time of Use Without Time of Use
With Time of Use
24
41
44
21
ZMD310CR/AR ZMD310CT/AT
ZFD4xxCR/AR ZFD4xxCT/AT
ZMD4xxCR/AR ZMD4xxCT/AT
Note: xx can be 10 / 05 / 02
03-11, 5 – Investment protection through flexible modularity 03-11, 6 – Investment protection through flexible modularity
1
The Landis+Gyr E650 Family - Overview The Landis+Gyr E650 Family - Overview
Additional Functionality (1) Additional Functionality (2)
ZMD310CR44.xxx7.c1 S3a
ZMD405CR44.045x.c1 S3
Control Inputs 2 additional inputs
4 additional inputs Load Profile disabled
enabled
Output Contacts 2 additional outputs
4 additional outputs DC magnet disabled
6 additional outputs detection enabled
X
Integrated Ripple Control Receiver
2
7
9
0
Additional Power Supply (100…240VDC/AC)
DC magnet detection is supported by the following meter types:
Additional Power Supply (12…24VDC) + ZMD310xT
+ ZxD410xT
X
The following In- and Outputs are + ZxD405xT
0037
2407
4207
0437
0607
0457
standard in the Basic E650: 0467 + ZxD402xT
• 3 control inputs Series 2: The meter supports either the DC magnet detection or the terminal cover
• 2 output contacts detection but not both at the same time.
not applicable for Series 3 Series 3: The meter supports both the DC magnet and terminal cover
detection at the same time.
03-11, 7 – Investment protection through flexible modularity 03-11, 8 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Overview The Landis+Gyr E650 Family - Overview
Communication Symmetrical connection
ZMD405CR44.0257.xx S3 ZMD405CT44.0257.xx S3 + Is available in all transformer connected meter versions of the ZMD400.
Integrated Interfaces Interchangeable Interface Interchangeable Modems
(Meter-Type R) (Meter-Type T) (Meter-Type T) + The type designation is extended with a small “s” to indicate the
symmetrical connection.
GSM/GPRS Modem
ZMD410CT44.0457 S3s
GSM Modem
PSTN Modem *
RS485 Interface
RS422 Interface
RS232 Interface
CS Interface
Ethernet Interface
M-Bus Interface 1 2 3 4 5 6 7 8 9 11
2 Pulse Inputs S0
* /V22b, V34b
M20
M22
G30
G31
G32
P30
P32
E20
E22
A4
A5
B1
B2
B4
D2
c6
c1
c2
c3
I1 U1 I2 U2 I3 U3 N I3 I2 I1
03-11, 9 – Investment protection through flexible modularity 03-11, 10 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Overview The Landis+Gyr E650 Family - Overview
Type Designation + Terminal cover detection
ZMD x 10 C T 44 . 2 4 0 7 S3(a)
Connection ZFD 3-phase, 3-wire + With the ZMD310 and ZxD400 meter a accessory kit is available to detect
Diagram ZMD 3-phase, 4-wire the terminal cover removal.
Connection 3 Direct, digital measuring
Type 4 Transformer, digital measuring
Accuracy 10 Class 1.0 to IEC
05 Class 0.5 to IEC + The state changes of the
02 Class 0.2 to IEC switch can be registered
Energy C Active, Reactive and Apparent
Type A Active
in to the event log over a
Model T modular Communication control input.
R integrated Interface
Tariff 21 Energy only, no TOU Note:
Functions 24 Energy only, with TOU Series 2: The meter supports either the
41 Energy and Demand, no TOU DC magnet detection or the terminal
44 Energy and Demand, with TOU cover detection but not both at the
Additional additional inputs on extension board same time.
Functions* additional outputs on extension board
5/6 integrated additional Power Supply Series 3: The meter supports both
the DC magnet and terminal cover
2/7 DC magnet detection / Load Profile Memory detection at the same time.
Series 3
* Integrated ripple control receiver is available with Series 2
03-11, 11 – Investment protection through flexible modularity 03-11, 12 – Investment protection through flexible modularity
2
The Landis+Gyr E650 Family - Measuring System The Landis+Gyr E650 Family - Measuring System
Measured Quantities Block-Diagram of E650-Meter
44 Measuring quantities based
on power: Reset Microprocessor Display
+Q Keys
Calendar Clock Signal
+ Active energy / power
+ Reactive energy / power Time Switch Utilization Data LCD-Display
+ Apparent energy / power for
+ Power factor Optical
Control Tariff Billing
+ for each direction or quadrant Ut Interface
Inputs Control
-P +P + for each phase or total
Interface
I1 Board
16 additional measuring I2 A/D Calibra- Signal
quantities as instantaneous I3 tion Output
values: A/D processing
+
U1 Contacts
U2
+ Voltage (per phase) U3 Measurement Test
N System Extension
+ Current (per phase and neutral) Board Diodes
+ Active- and Reactive Power (Sum) Inputs
Power supply
-Q + Phase angles (U-U and U-I) Outputs Communication
Memory Unit with
+ Frequency Voltage Load-Profile
Add. PS
Supervision Impulse-Inputs
03-11, 13 – Investment protection through flexible modularity 03-11, 14 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Measuring System The Landis+Gyr E650 Family - Energy and Demand
Registers
Block-Diagram of Digital Signal Processor
Digital
Values
Measured Quantities Selection
A/D Digital Calibra- i i2 Ix 6 x ±Ax ME 1
Converter Filter tion i Total Energy Current Average Last Average
Selection of maximal 8 quantities
6 x ±Rx ME 2
Ix
Formation of mean values per second
The Landis+Gyr E650 Family - Energy and Demand The Landis+Gyr E650 Family - Energy and Demand
Registers Registers
Energy and Demand Rate Registers
Special Energy Registers
ME 1-8, 19-27 ME 1-8 ME 1-8
ME 1 All Energy Rate Registers can be defined in three different modes:
Selection of Measured Quantities
ME 7
Available for:Billing Period Load Profile 1, 2
Energy Rate 2 Maximum 2 Cum. Maximum 2
ME 8
Cumulative Value Yes Yes
… Maximum 1 Cum. Maximum 1
Billing Period Delta Value Yes No
ME 19 Integration Period Delta Value No Yes
…
…
ME 27 Energy Rate 1
P
PF = PF Average over
S PF Minimum 2 Billing Period
PF Minimum 1
New from B31
03-11, 17 – Investment protection through flexible modularity 03-11, 18 – Investment protection through flexible modularity
3
The Landis+Gyr E650 Family - Energy and Demand The Landis+Gyr E650 Family - Energy and Demand
Registers Registers
Sliding (Rolling) Demand Stored Values (Billing Periods)
Stored Values are Captured at the Event of a Billing Period Reset:
The Integration Period for the Demand Registers can be divided into
Sub-Intervals. This Function is called Sliding Demand or Rolling Demand. Billing Periods can be stored by the following Controls:
Integration Number of Sub-Intervals • Control Inputs (KA / KB) • Internal Real Time Clock (at full hours)
Period 1 2 3 4 5 6 10 12 15 • Integrated RCR* - weekly (any day)
In Minutes Duration of Sub-Intervals in Minutes
• Reset Button - monthly at up to 6 days
1 1 - - - - - - - - • Communication - at daylight saving begin and end
2 2 1 - - - - - - - * : not applicable to Series 3
3 3 - 1 - - - - - -
5 5 - - - 1 - - - - The following Registers can be Captured at the Billing Period Reset:
10 10 5 - - 2 - 1 - - • *Maximum Demand Registers • Energy Total Registers
15 15 - 5 - 3 - - - 1 • Energy Rate Registers
20 10 - 5 4 - 2 - - • *Minimum Power Factor Registers
20 - Cumulating Value Registers
30 30 15 10 - 6 5 3 - 2 • *Billing Period Average Power Factor - *Billing Period Delta Value Registers
60 60 30 20 15 12 10 6 5 4 * : These Registers are reset at Billing Period Reset
03-11, 19 – Investment protection through flexible modularity 03-11, 20 – Investment protection through flexible modularity
ME1
+ Using this function with two LP‘s it is possible to define 3 different periods,
the integration period for the maximum demand, the subinterval capture
period for one LP and an independent capture period for the 2nd LP.
03-11, 21 – Investment protection through flexible modularity 03-11, 22 – Investment protection through flexible modularity
§ NLA, No load active. Transformer (iron) losses of + Following values are available:
active energy.
NLA = U2h / RFe. The value of RFe can be set by THD of active energy import +THD A Sum Sum
parameterisation. THD of active energy export -THDA Sum Sum
THD of active energy (percent) THDA [%] Sum Sum
§ I2h (Cu), Ampere square hours (with RCu = 1 W)
THD of phase voltages (absolute) THDU Sum / Phases Sum
§ U2h (Fe), Voltage square hours (with RFe 1 MW) THD of voltage (percent) THDU [%] Sum Sum
THD of phase currents (absolute) THDI Sum / Phases Sum
THD of current (percent) THDI [%] Sum Sum
03-11, 23 – Investment protection through flexible modularity 03-11, 24 – Investment protection through flexible modularity
4
The Landis+Gyr E650 Family - Load Profile The Landis+Gyr E650 Family - Load Profile
Load Profile Capturing Load Profile Data Format
Definition of Profile including:
• Definition of Captured Values
Profile Values are Captured in regular Intervals: Identification / Header • Length of Capture Period
• Number of Entries
The Capture Period of the Profile is always synchronous to the full hour
Date / Time / Status Start of a new Day with:
The Capture Period is selected between the Demand Integration Period • Date and Time
Maximum
Maximum 14
14 Values
Values each
eachEntry
Entry • Status (acc. VDEW)
Maximum
Maximum 14
14 Values
Valueseach
eachEntry
Entry
and the Demand Subinterval*. Maximum 14
Maximum
Maximum 14Values
Valueseach
eachEntry
Entry
Maximum14 14Values
Valueseach
eachEntry
Entry Captured Objects:
* : With Subinterval as Capturing period, no Demand Values can be selected • 1 to 14 Values
The following Registers can be Captured into the Load Profile: Date / Time / Status
The handling of the following
• Last Average Demand • Average Values (over Capture Period) Maximum
Maximum 14
14 Values
Values each
eachEntry
Entry Events must
Maximum
Maximum 14
14 Values
Valueseach
eachEntry
Entry
• Last Average Power Factor - Voltages (all 3 Phases) Maximum
Maximum 14
14Values
Valueseach
eachEntry
Entry be parameterised:
Maximum
Maximum14 14Values
Valueseach
eachEntry
Entry
• Energy Total Registers - Currents (3 Phases and Neutral) • Supply Interruptions
• Energy Integration Period Registers - Mains Frequency • Demand Rate Switching
End • Billing Period Reset
03-11, 25 – Investment protection through flexible modularity 03-11, 26 – Investment protection through flexible modularity
The Landis+Gyr E650 Family The Landis+Gyr E650 Family - Load Profile
Two Load profiles with B31
Load Profile 1 and 2 Memory allocation
+ The capacity of the load profile has
been increased (double) as well as the
number of captured channels (from 14
to 26).
+ The ZMD300/400 Series 3 supports now
up to 2 load profiles, e.g. for billing and
monitoring purposes.
+ The two capture periods are
independent.
+ One of the capture period is equal to
In total a maximum of 7542 memory pages can be allocated as followed:
the demand integration period.
Use Number of memory Default setting
+ The instantaneous values can be Event log
pages
1 to max. 74
memory pages
11 pages
captured in either in the load profile 1 or Stored values 1 to max. 78 17 pages
03-11, 27 – Investment protection through flexible modularity 03-11, 28 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Event Monitoring The Landis+Gyr E650 Family - Event Monitoring
Monitors for Voltage and Current Monitors for Power and Power-Factor
The following parameters are available: For each Phase individual 8 Demand Monitors with: For each Monitor individual
• Threshold for Over-Voltage Event-Counters store the - Selection of Measured Quantity Event-Counters store the
• Threshold for Under-Voltage number of Exceedings. - Current- or Last Average-Demand number of Exceedings.
- Definition of Threshold and Tariff
• Activation Delay for Voltage Monitors
• Threshold for Phase Over-Current The Events of every Phase 2 Power-Factor (PF) Monitors with: The Events of every Monitor
can be used for Control - Definition of Threshold and Tariff can be used for Control
• Threshold for Neutral Over-Current - Apparent Power Threshold for PF
• Activation Delay for Current Monitors purposes and stored in the purposes and stored in the
(to filter out short Events) Event Log-Book Event Log-Book
Vt
Vm: Monitored Value
Vm: Monitored Value Vm
Vt td Vt: Threshold Value
Vt: Threshold Value
Vm CA-Alert CA-Alert: Current-Average-Alert
td td: Activation Delay LA-Alert: Last-Average-Alert &
Alert Alert: Alert Signal LA-Alert Power-Factor-Alert
03-11, 29 – Investment protection through flexible modularity 03-11, 30 – Investment protection through flexible modularity
5
The Landis+Gyr E650 Family - Event Monitoring The Landis+Gyr E650 Family - Event Monitoring
Monitors for other special Events The Event Log-Book
Many other Internal Signals of State Information or Actions are available for The Event Log-Book stores the Events in an a-periodic Memory according to
the Event Log-Book. the parameterisation. With full Memory new entries delete the oldest ones.
We list here some of the most used ones, please refer to the user manual
for detailed information:
Time / Day Stamp of the Event
• Phase Fail per Phase, Total Power Down,
• Battery (voltage low, replaced, voltage ok), Status-Byte („VDEW“-standard)
• Time/Date invalid, Time/Date adjusted,
Event-Number (Landis+Gyr specific)
• Error in the data processing detected
• and many others Actual Information of Error-Bytes
For the Control of Outputs (like LCD-Display-Arrows or Output-Contacts) you Optional the following fields can be
can select the Alarm Signal for the invalid Time/Date and all Monitors for captured:
Demand, Power-Factor, Voltage and Current. • Event-State (Landis+Gyr specific)
• Energy Total Registers
03-11, 31 – Investment protection through flexible modularity 03-11, 32 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Event Monitoring The Landis+Gyr E650 Family
Network Quality Events with B31
Alert-Function + We have introduced 3 new network quality
dedicated events:
Supervision of selected functions: These events will (if § Under- and Overvoltage per phase
• Phase voltage - total number of the events
selected) initiate the - cumulated duration of the events
• Checksum errors - duration of the longest, with time stamp
• Low battery voltage emission of an SMS through - duration of the shortest, with time stamp
- 30 last events (with time stamp, duration,
• etc. a connected GSM modem magnitude, phase)
§ Phase fail
- number of cuts
- cumulated duration of cuts
- duration of the longest, with time stamp
These events will (if selected) set a special control signal - duration of the shortest, with time stamp
- 30 last cuts (with time stamp, duration,
The following actions can now be controlled: magnitude, phase)
- indication with an arrow on the LCD + The three events can be defined as
- state of output contact previously in the event log or as the new
dedicated event log.
- Rate-Registers for Energy, Power, Power-Factor and Time + With the new dedicated event log it is
possible to define a snapshot buffer.
03-11, 33 – Investment protection through flexible modularity 03-11, 34 – Investment protection through flexible modularity
§ According to its parameterization, the auxiliary power loss Bit 1-7 not used
§ This calculation method is limited to Class 2. detection can trigger the Missing Additional Power supply
§ Power factor calculation is not supported when this event (58) and can be used to trigger an alert. The
method is in use. appearance of an alert can be indicated by an arrow on
§ This method includes the harmonics. display or by the Alert LED.
03-11, 35 – Investment protection through flexible modularity 03-11, 36 – Investment protection through flexible modularity - Landis+Gyr - E650 Series 3
6
The Landis+Gyr E650 Family The Landis+Gyr E650 Family
Additional features with B31 General Meter Functions
+ Current without voltage Real Time Clock
§ In some applications the voltage transformer is protected against short circuit by a fuse + Accuracy < 5ppm ( < 0,5sec/Tag)
in the measurement circuit. In case the fuse blows up, this is detected and indicated. + Synchronization / Setting by
§ 3 new events are defined to indicate current without voltage per phase (event nr 55, − By control input or integrated RCR*
56 and 57) (to the Minute, Integration-Period or Day)
§ The occurrence of the event is indicated in a status, C.4.2 Current without Voltage − With Set Commands via Communication
Status − Manually in Set-Mode with the Push-Buttons
Bit # Description State definition * Not applicable for Series 3
Bit 0 Current without voltage L1 0 = I below threshold
1 = I above threshold + Summer-/winter time to:
Bit 1 Current without voltage L2 0 = I below threshold
1 = I above threshold
− European Standard
Bit 2 Current without voltage L3 0 = I below threshold
1 = I above threshold
− Free parameterised Start and End
Bit 3-7 not used + Backup time:
§ The event occurrence can be included in bit 24 of the status code of the load profile if − Standard with Super cap approx. 21 days
it is enabled by parameterisation. (after continuous supply during 300 hours)
− With optional Battery approx. 10 years
(ENERGIZER Lithium EL 223AP • 6 V)
03-11, 37 – Investment protection through flexible modularity 03-11, 38 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Visual Meter Interface The Landis+Gyr E650 Family - Visual Meter Interface
Overview of Interface Objects Liquid Crystal Display Elements
9 1 2 3 1 2 3 4
03-11, 41 – Investment protection through flexible modularity 03-11, 42 – Investment protection through flexible modularity
7
The Landis+Gyr E650 Family - Visual Meter Interface The Landis+Gyr E650 Family - Visual Meter Interface
OBIS: Identification System (IEC62056-61) Display of Data
03-11, 43 – Investment protection through flexible modularity 03-11, 44 – Investment protection through flexible modularity
The Landis+Gyr E650 Family - Visual Meter Interface The Landis+Gyr E650 Family - Visual Meter Interface
Installation Check Function Special Display Features and alert indication
Advanced Operation with Up and Down Keys
+ Up- and Down scrolling
+ Long Key-Stroke -> Jump over Stored Values
+ Press both keys simultaneously -> one level up
The Landis+Gyr E650 Family - Visual Meter Interface The Landis+Gyr E650 Family
Test Mode
Communication Interfaces
Optical Interface
+ Fast Register Testing with higher Resolution in Test Mode (up to
5 decimals in test mode)
Register ,
Display test mode
+ Physical Characteristic according to IEC62056-21 (former IEC61107)
+ Initial Baud-Rate always 300 bps
+ Test with one Scanning Head by switching var + Initial Protocol always „IEC1107“
impulses to middle LED
+ Change to „dlms“ at initialisation possible
+ Fast No-Load detection and indication in 10 Seconds + Maximum Baud-Rate 9600 bps
03-11, 47 – Investment protection through flexible modularity 03-11, 48 – Investment protection through flexible modularity
8
The Landis+Gyr E650 Family The Landis+Gyr E650 Family
Communication Interfaces Communication Interfaces
Integrated Communication Interfaces Modular Communication with CU-xx
These Interfaces are These Communication Units are available for:
l Initial Baud-Rate 300 to 9600 bps
available for: ZMD300AT, ZMD300CT, ZxD400AT, ZxD400CT
ZMD310AR, ZMD310CR l Initial Protocol auto-detected
ZxD400AR, ZxD400CR Meter modularity: „Plug + Play“ Communication Units
l Data Baud-Rate 2400 to 9600 bps
RS232: c1 This meets your needs for today while The right technology at the right time.
• simple 3-wire Interface leaving you a free hand for tomorrow. The right investment at the right time.
• 1 x RJ12 Plug You decide when to equip your meters
RS485: c2 or with what technology to give them the
• simple 3-wire Interface communication capabilities you and your
• 2 x RJ12 Plug customer need.
CS: c3 or
• simple 2-wire Interface
• 2 x “WAGO”
RS422: c6 or
• simple 4-wire interface
• 2 x RJ12Plug
03-11, 49 – Investment protection through flexible modularity 03-11, 50 – Investment protection through flexible modularity
03-11, 51 – Investment protection through flexible modularity 03-11, 52 – Investment protection through flexible modularity
03-11, 53 – Investment protection through flexible modularity 03-11, 54 – Investment protection through flexible modularity
9
The Landis+Gyr E650 Family
Tools for Meter Maintenance
Thank you
Manufacturer Utility Central Services Utility Local Services
Field para-
Configuration Test +
meteri Installation Readout Maintenance
verification
sation
MAP105
10