CONSTRUCTION CO. LTD
BUILDING AND CIVIL ENGINEERING CONTRACTORS
BETWEEN
.......................... a company registered under the Companies Act, 2012
and having its registered office at..............................................here in
after referred to as "the contractor
AND
...........................................................................................................
.....................................................( the client)
WHEREAS
1. The Owner possessed a plot of land situated at
…………………………………………………………………………………………….
2. The Contractor is engaged in construction activities for a long time
and having good experience in construction of
Building/Flat/Bungalow.
3. The Owner is willing to construct
a.............................................................storeyedhouse/Flat/Bu
ngalow(here in after referred to as the said works)on the said
plot of land
1. Commencement of Work
The Contractor will clear and prepare the said plot of land for
construction of said works as per the said sites plans.
2. Payment
The Owner shall reimburse the Contractor all the expenses
incurred by him in connection with the completion of the said
works on actual basis at regular intervals and shall pay to the
Contractor an advance of 20% before the commencement of the
project. The contractor shall receive payments from the client on
an individual account number (3200424212 CENTENARTY).
The contractor shall implement the project as per the bills of
quantities and interim certificates for an item the contractor
finishes shall be handed over to the project owner and the
contractor receives payments in 7 days.
3. OwnersrightofInspection
The Contractor will permit the Owner to have access to the said
works while the same are under construction and to inspect the
same.
4. Variation
If, in the opinion of the Contractor, any variation or deviation
from the said sites plan is necessary in order to satisfactory
completion of the said works, the Contractor shall do so only with
the prior permission in writing of the Owner.
5. Account of Materials
The Contractor shall keep full and regular account of all the
materials purchased, brought on the site, consumed and balance
lying on the site which shall be open to inspection of Owner at all
reasonable times. All materials or plants used or to be used in
construction shall remain at the contractor's risk and he shall not
be entitled to any compensation for injury to, or loss or
destruction of such work so materials arising from any cause,
whatsoever.
6. Defect
If any defects, shrinkage or other faults appear in the works
within two months after their completion, it shall be the duty of
Contractor to make good the loss.
7. Extension of Time
If due to certain unforeseen/ uncontrollable circumstances, the
Contractor requires any extension of time for completing the works, he
shall immediately make known the same To the Owner and the Owner
may, if he thinks such request reasonable, grant such extension of time
as he may think necessary.
for the said the Arbitration and Conciliation Act,1996 and the
rules made thereunder shall apply to the arbitration proceedings
under this clause. The decisions given by the Arbitrator(s) shall
be final and binding upon the parties.
11. Indemnity
The Contractor shall keep indemnified the Owner from all claims,
demands or actions that may be raised against the Owner by
reason of anything done by the Contractor in the course of
execution of works under this Agreement.
Witness:
1................................................For and behalf of the Owner Director
………………………………………………………..
………………………………………………………..
……………………………………………………….
2.................................................For and behalf of the Contractor
Director
……………………………………………………………..
……………………………………………………………….
……………………………………………………………