You are on page 1of 4

ICT IGCSE Lesson 1 week 6

The Systems Life Cycle

Objective:-
Chapter 7: The Systems Life Cycle

To know about stages of system life cycle


To know about Analysis stage

• 7.1 Analysis
• 7.2 Design
• 7.3 Development and Testing
• 7.4 Implementation
• 7.5 Documentation
• 7.6 Evaluation
faisal.awh@gmail.com
ICT IGCSE Lesson 1 week 6
The Systems Life Cycle
Systems Analysts will review an existing system which is currently not meeting
expectations. The steps shown below will be followed to develop a new system
which is fit for purpose.
Chapter 7: The Systems Life Cycle

Analysis: Collecting information about the present system and identifying problems.

Design: Designing a new system to correct the problems identified in the analysis.

Development & Testing: Developing and testing new system.

Implementation: Replacing the old system with the new system.

Documentation: Creating technical and user documentation for new system.

Evaluation: Evaluating whether the new system meets the requirements of the
design requirements.
faisal.awh@gmail.com
ICT IGCSE Lesson 1 week 6
The Systems Life Cycle

7.1 Analysis

Analysis techniques Advantages Disadvantages


Chapter 7: The Systems Life Cycle

Observation The use of the current system is • The analyst can obtain • Some employees may feel
observed to find out how it reliable information about uncomfortable being
the current system. observed
works.
• Information will not be • Employees may perform
biased as it’s the analyst’s differently if they know
point of view. they being observed.

Interview People who use the system are • Can ask open ended • It can be a time
interviewed to gauge their questions to gauge to consuming process.
more feedback. • The interviewee cant
feedback.
• Questions can be modified remain anonymous with
during interview. this method.

Questionnaire Questionnaires are distributed • Questionnaires can reach • Questionnaires may not
to employees/ customers to a larger audience. be completed accurately.
s • Questions can be • May not be all returned.
find out a range of opinions
answered quickly using • Can not expand or clarify
about the current system. tick boxes – cheaper answers to questions.
method of analysing.

Collecting Existing documentation for the • Analyst's can see how • It can be a time consuming
current system is analysed to current the paper system process.
Documents operates. • Due to the amount of time
identify what data is inputted
• Can obtain information required this is a costly
and outputted. critical to the system. method.

faisal.awh@gmail.com
ICT IGCSE Lesson 1 week 6
The Systems Life Cycle

7.1 Analysis

Data which is inputted, Problems with the The requirements of the user
Chapter 7: The Systems Life Cycle

processed and outputted into current system are and the potential new system
the system are identified. identified. are identified.

Data may be paper based. What could be What is the new system meant
improved? to do?

New System Requirements Specification


• Once the systems analysts have completed the analysis stage of the systems life cycle they
should be fully aware of the limitations of the current system.

• The next step will be to design a new system (normally computer based) to resolve the
problems identified by the users and the systems analyst.

• The Requirements Specification will be created which will outline the required
improvements and expectations for the new system.

faisal.awh@gmail.com