Bangka Island Flood Management in

Bangka Belitung Province


TECH-2 Loan Agreement Number: Loan EDCF INA-22

TECH-2 CONSULTANT’S ORGANIZATION AND EXPERIENCE


NOTE : [Provide here a brief (not more than three pages) description of the background and organization of your firm/entity and
each associate if any, for performing the Services.]

A. CONSULTANT’S ORGANIZATION
A.1 Introduction
Kunhwa Engineering & Consulting Co., Ltd. (KUNHWA) in joint venture with PT. Indra
Karya (Persero), PT. Aditya Engineering Consultant. formed an excellent project team of
experts for Engineering Services for Bangka Island Flood Management in Bangka Belitung
Province. Also the local associated consulting firms, [PT.Indra Karya (Persero)]., will support
to the project team for optimum project execution condition. The Kunhwa’s JV experts with
local partner are selected among a pool of Professional Engineers, and the best suited and
experienced professional staff will be assigned to the consulting services to promote the
economic development of Indonesia and its surrounding region and the improvement of the
quality of life of the local residents.

A.2 General Company Information

A.2.1 Leading Firm: Kunhwa Engineering & Consulting Co., Ltd. (KUNHWA)
KUNHWA in the spirit of progress has been a dynamic and innovative firm since its foundation
in 1990. We are now internationally recognized as a top engineering and consulting company
based on outstanding project track record, our advanced engineering system, and our
expertise.

For three (3) decades of providing engineering and consulting services, KUNHWA has
successfully carried out more than 6,000 projects involving F/S, Engineering Design and
Construction Supervision.
Especially, in the field of Road and Highway, KUNHWA is a leading engineering company in
Korea.

KUNHWA has been consistently ranked in the annual survey listings of Engineering News
Record (ENR Record). In 2020, KUNHWA is listed at position 144 in the just released ranking
of ‘The Top 225 International Design Firms’.

Moreover, KUNHWA has well-organized project management and project support system
defined within the framework of KUNHWA’s quality management system certified with
international standard: ISO 9001 (Quality systems Model for Quality Assurance), ISO 14001
(Environmental Management Systems) and VE (Value Engineering for Road). Also KUNHWA
is registered in EDCF (Korea Exim Bank) and KOICA, ADB (Asian Development Bank),
IBRD/IDA (World Bank), AfDB (African Development Bank), EBRD (European Bank for
Reconstruction and Development) as Consultant.

TECH 2-1
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Organizational Chart

Average Annual Turnover in last 3 years


Amount Currency
Year Exchange Equivalent
(KRW)
2020 199,226,567,198 1US$ =1,180.11KRW 168,820,336

2019 187,138,832,361 1US$ =1,166.72KRW 160,397,381

2018 169,721,980,338 1US$ =1,101.47KRW 154,086,793

Average Annual Total Turnover 155,053,399

List of Board of Directors, and Beneficial Ownership


Board of Directors Beneficial Ownership

Name Designation Name of Shareholder Amount of Shares

Jeong, Jo Hwa Chairman / CEO Hwang, Kwang Ung 185,000 (18.59%)

Hwang, Gyu Young President Oh, Sea Hwang 165,000 (16.58%)

Hong, Kyung Pyo President Kim, Young Yoon 145,000 (14.57%)

Kim, Moon Seok President Others (27) 500,000 (50.26%)

TECH 2-2
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

A.2.2 JV Partner: [PT. Indra Karya (Persero)]


PT. Indra Karya (Persero) is State-Owned Enterprise that was founded 1961 and engaged in
the construction field as Contractor Company. In 1972 the company was reorganized into
engineering and management consulting services. Since then, the company has been
growing and able to establish itself as leading Engineering Consultant Company Indonesia.

As an important preliminary step, PT. Indra Karya (Persero) focuses its business in electric
power and water resources development. The success in achieving the initial goals, has
encouraged PT. Indra Karya (Persero) to expand the fields, such as : Buildings and Factories,
Transportation (Toll Roads, Bridges, Ports, Airports, Train Facilities/Infrastructure/LRT,
Community Empowerment, Public Housing, Sanitation, Water Waste and Drainage, Regional
Development, Industrial Development/Specific Areas in line with current development market
segment in Indonesia.
PT.Indra Karya (Persero) has been succeeded in completing all the contract assignments
handled professionally both as Independent Company or as Joint Venture Lead Firms. This
achievement can not be separated from the support of human resources of the company PT.
Indra Karya Persero also has its own land laboratory, integrated planning studio, integrated
online project implementation monitoring system (EKPP), ISO 9001:20 15, OHSAS 18001 :
2007 as welI as backup support for professionals in their fields to foster a second opinion
cultureon products produced by PT. Indra Karya (Persero).

In the next five years, PT. Indra Karya (Persero) has a plan to strengthen and diversify the
business into an EXPANDED CONSULTANTS, specifically the expansion of the water and
energy resources business(upstream-mid-downstream), thus PT. Indra Karya (Persero) will
become Engineering, Developer and Industry at the same time. Engineering activities as an
upstream part, will continue to handle the consulting work that has been energy, carried out
so far. Developer activities as part of the center will act as a developer of reservoirs / ponds /
situ for the management of clean water, wastewater, energy and tourism. Industrial activities
as a downstream part run an industrialization business, namely bottled drinking water (AMDK)
that already has a trademark called INFRESH, this industry provides clean water from river
water sources, reservoirs, ground water, sea water to supply the needs of the Special Area.
PT. Indra Karya has been entrusted to carry out A Large Scale Engineering Projects with high
technology as Lead Firm Consultants Association for IBRD finances projects (Central Java
Transmission & Substantion also Musi HE PP Project) and ADB (HEPP Tanggari II and
Sengguruh HPP).

TECH 2-3
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Organizational Chart

List of Board of Directors

A.2.3 JV Partner: PT. Aditya Engineering Consultant


PT. Aditya Engineering Consultant established since 1990 originally named CV. Aditya was
formed on the initiative of several Engineer in the field of Civil Engineering. In 2004 after take
part throughout Indonesia, this company became Perseroan Terbatas (Private Company) under
leadership of Ir. Herryan Kendra Kaharudin MT.PU.SDA.

The activities of the Company deal with a lot of water resources project in almost all provinces in
Indonesia with the Company's Branches currently in several provincial capitals, namely:

A. Sumatera Region
 Aceh Province
 Riau Islands Province

TECH 2-4
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

 West Sumatera Province


 South Sumatera Province
 Riau Province
 Bengkulu Province
 Lampung Province
B. Java Region
 DKI Jakarta Province
 Central Java / Solo Province
C. Kalimantan Region
 West Kalimantan Province
D. Sulawesi Region
 North Sulawesi Province
 Gorontalo Province
 Southeast Sulawesi Province
E. Papua Region
 Papua Province
 West Papua Province
Each branch has the capacity as the person in charge of activities in its territory led by a
Bachelor of Engineering and mastering the field of activity assisted by several technical staff.
At present the PT. Aditya Engineering Consultant addressed at Jalan Batu Permata No. 2A
BuahBatu - Bandung with a total of 40 employees from various disciplines assisted by several
resource persons especially in the field of Water Resources who have the capability as a
technical person in charge of the company leadership while at the same time fostering young
engineers in engineering. Company structure of PT. Aditya Engineering Consultant is led by 1
(one) President Director with 2 (two) directors and 1 (one) Commissioner with more than 10
resource persons from various disciplines. Considering the activities of PT. Aditya Engineering
Consultant is dominated by the Water sector, the company leader is also one of the managers of
the Water Resources Organization, HATHI and has a Certificate of Expertise (SKA) in the form
of Primary Professional (PU. SDA).
Based on Managerial capabilities with this background of Water section, the leader is able to
bring PT. Aditya Engineering Consultant at the National level for the past 10 (ten) years as an
experienced company and can cooperate with several Foreign Consultants including SMEC,
PCI, NIPPON Koui and others. Also cooperating with Consultant Services companies from
BUMN, including Indra Karya, Virama Karya and Bina Karya. The divisions in the company's
structure include, among others, the fields of Survey, Study, Engineering, Agriculture,
Environment, and Economics and Taxation. The organizational structure of the company can be
seen as follows:

TECH 2-5
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Commissioner

President Director

Engineering Director Financial Director

Head of the Engineering Head of the Taxation


Division Division

Head of the Adm/


Finance Division

Head of the Provincial


Branch

Figure 1. Company Management Structure

Information:
1. Commissioner : Dewi Evianne
2. President Director : Herryan Kendra Kaharudin
3. Engineering Director : Budi Anton
: Taufiq
: Andica Brawijaya
: Ima Mirayani
: Eri Yanwari Hikmawan
: Muchlis Anshary
4. Head of Division : Each Field
5. Head of Branches : Each Province

TECH 2-6
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

B. CONSULTANT’S EXPERIENCE
B.1 Consultant’s Experience
B.1.1 Leading Firm: Kunhwa Engineering & Consulting Co., Ltd. (KUNHWA)
Name of consulting services: Approximate value of the contract
(in current US$):
Country: Duration of the consulting services
Location within country: (months):
Name of the Employer: Approximate value of the services provided by
your firm under the contract (in current US$):

Address and Telephone No.: Number of man-months provided by


(indicate contact person of the Employer) associated Consultants:

Start date (month/year): Completion Name of senior professional staff of your firm
date (month/year): involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): Project Coordinate, Team Leader):

Name of associated Consultants, if any: Role of


the contract (leading or just partner)

Narrative description of Project:


Description of actual services provided by your staff within the consulting services:

B.1.2 JV Partner: [PT. Indra Karya (Persero)]

Name of consulting services: Approximate value of the contract


Master Plan for Flood Control and Urban (in current US$):
Drainage System US$ 390.550,35

Country: Indonesia Duration of the consulting services


Location within country: Tangerang (months): 7 Months
Name of the Employer: Approximate value of the services provided by
Pemerintah Kota Tangerang Dinas Pekerjaan your firm under the contract (in current US$):
Umum dan Penataan Ruang US$ 390.550,35
Address and Telephone No.: Number of man-months provided by
KS Tubun Street No.96 Tangerang City Tel. associated Consultants:
(021) 5534067, Fax (021) 55771508 117 M/M

Start date : 18/5/2017 Name of senior professional staff of your firm


Completion date : 13/12/2017 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 7 Months Project Coordinate, Team Leader):
Certificate of Minutes of Work Handover: Team Leader = Ir. Pieter L. Soemardi, Dipl. HE,
602.21/3/7/7-BASTHP/PERTEK/LPSE/2017 ACPE

TECH 2-7
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of associated Consultants, if any: Role of


the contract (leading or just partner)
PT. Indra Karya
Narrative description of Project:
The Purpose of the Master Plan Activities for Flood Control and Urban Drainage Systems in
Tangerang City area is the production of a document that can provide a reference
comprehensively on the condition of the problem and the potential of the drainage system as the
basis for planning the drainage network in Tangerang City and used as the basis for Regional
Regulations ratified by the Mayor.
Description of actual services provided by your staff within the consulting services:
 Secondary data collection
 Performing Hydrological Analysis
 Field Identification and Completeness Survey
 Ground Control Point Job
 Unmanned Aerial/Drone Shooting (High Resolution Imagery for forbidden area, namely
Soekarno-Hatta Airport)
 Aerial Photo/Photogrammetry Data Processing
 Photo Map Making
 Creation of DSM, DEM and Contours
 Image interpretation and digitization
 Making Spatial Thematic Maps
 Database Compilation
 Technical Base Map Cartography and Photo Map
 Map Album printing

Name of consulting services: Approximate value of the contract


Study of Solo Valley Werken as Flood Control (in current US$):
in Ngawi Regency, Bojonegoro, Lamongan, US$ 223.658,24
Gresik
Country: Indonesia Duration of the consulting services
Location within country: Central Java (months): 8 Months
Name of the Employer: Approximate value of the services provided by
Satuan Kerja Balai Besar Wilayah Sungai your firm under the contract (in current US$):
Bengawan Solo US$ 223.658,24
Address and Telephone No.: Number of man-months provided by
Solo – Kartasura street Km. 7. PO. BOX 267 associated Consultants:
Tel/Fax (0271) 716428, Pabelan, Kartasura, 276 M/M
Sukoharjo
Start date : 13/3/2014 Name of senior professional staff of your firm
Completion date : 7/11/2014 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 8 Months Project Coordinate, Team Leader):
Certificate of Minutes of Work Handover: Team Leader = Ir. Justina H. Wahyono
KU0203-BS/BAST/PP/X/2014-01
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Indra Karya
Narrative description of Project:
The Study of Solo Valley Werken as Flood Control in Ngawi Regency, Bojonegoro, Lamongan,
Gresik aims to obtain output in the form of Basic Documents and Study Reports of Solo Valley

TECH 2-8
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Werken as Flood Control and utilization in Ngawi Regency, Bojonegoro, Lamongan, Gresik
Description of actual services provided by your staff within the consulting services:
 Secondary data collection
 Preparation and Measurement Results of the Situation in the Field
 Geological Investigations and Soil Mechanics
 Calculation of Hydrological and Hydraulic Analysis
 River Management Planning
 Making Basic Design Planning
 Cost forecast analysis and economic analysis

Name of consulting services: Approximate value of the contract


Review of the Master Plan for Flood Control (in current US$):
and Management US$ 414.810,35
Country: Indonesia Duration of the consulting services
Location within country: Samarinda (months): 6 months
Name of the Employer: Approximate value of the services provided by
Samarinda City Government Department of your firm under the contract (in current US$): US$
Highways and Irrigation 124.443,1
Address and Telephone No.: Number of man-months provided by
Kesuma Bangsa street number. 82, Samarinda associated Consultants:
City Tel/Fax. (0541) 733512 147 M/M

Start date (month/year): 23/6/2014 Name of senior professional staff of your firm
Completion date (month/year): involved and functions performed (indicate most
19/12/2014 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 6 months Project Manager: Ferdinandus Baskoro H. S. W,
Certificate of Minutes of Work Handover: ST
01/BASTP/RMPPB/XII/2014
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
Leading – PT. Ika Adya Perkasa (70%)
Partner – PT. Indra Karya (30%)
Narrative description of Project: The Purpose of the Review of the Master Plan for Flood Control
and Management in Samarinda City area is the production of a document that can provide a
reference comprehensively on the condition of the problem
Description of actual services provided by your staff within the consulting services:
 Secondary data collection
 Ground Control Point Job
 Performing Hydrological Analysis
 Unmanned Aerial/Drone Shooting
 Aerial Photo/Photogrammetry Data Processing
 Photo Map Making
 Creation of DSM, DEM and Contours
 Image interpretation and digitization
 Field Identification and Completeness Survey
 Making Spatial Thematic Maps
 Database Compilation
 Technical Base Map Cartography and Photo Map
 Map Album printing

TECH 2-9
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of consulting services: Approximate value of the contract


Consulting Service of Technical Study on River (in current US$):
Diverting of the Taiwasi, Sebadan, Ringgu, and US$ 125.000
Kawawa River
Country: Indonesia Duration of the consulting services
Location within country: South Kalimantan (months): 6 Months
Name of the Employer: Approximate value of the services provided by
PT. Borneo Indobara your firm under the contract (in current US$):
US$ 125.000
Address and Telephone No.: Number of man-months provided by
Sinar Mas Land Plaza, Tower 2, 7th floor, M. H. associated Consultants:
Thamrin street, Number 51, Gondangdia, 127 M/M
Menteng, Central Jakarta
Start date : 8/5/2019 Name of senior professional staff of your firm
Completion date : 4/11/2019 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 6 Months Project Coordinate, Team Leader):
Certificate of Minutes of Work Handover: Project Manager: Gagah Guntur Ariwibowo, ST
010/BAST/BIB-IK/XII/2019
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Indra Karya
Narrative description of Project:
The aim of Consulting Service of Technical Study on Displacement of the Taiwasi, Sebadan,
Ringgu, and Kawawa River is to find out all the technical needs and obstacles in relocating these
rivers in order to find the right solution and the activity can be carried out in accordance with the
technical
Description of actual services provided by your staff within the consulting services:
 Assess existing information/data and determine information gaps that need to be collected;
 Carry out necessary topographic and other surveys as may be required;
 Field Identification and Completeness Survey
 Undertake hydrometric and hydrological surveys;
 Update/confirm water balance/allocation model as needed to assess sustainable yield
 Carry out geological and geotechnical investigations;
 Carry out environment impact assessment and prepare AMDAL
 Making Spatial Thematic Maps
 Database Compilation

Name of consulting services: Approximate value of the contract


Detail Design West Divertion Canal at West (in current US$):
Lombok Regency US$ 66.696,49
Country: Indonesia Duration of the consulting services
Location within country: West Lombok Regency (months): 6 months
Name of the Employer: Approximate value of the services provided by
Satuan Kerja Balai Wilayah Sungai Nusa your firm under the contract (in current US$): US$
Tenggara I 66.696,49

TECH 2-10
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Address and Telephone No.: Number of man-months provided by


Achmad Yani street number. 1 Gerimax Indah – associated Consultants:
Narmada West Lombok Tel. (0370) 672282 115 M/M

Start date (month/year): 1/4/2014 Name of senior professional staff of your firm
Completion date (month/year): involved and functions performed (indicate most
26/11/2014 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 8 months Project Manager: Gagah Guntur Ariwibowo, ST
Certificate of Minutes of Work Handover:
IK.02.04-AS/BAST/SAT.BWS-NT.I/SPK-
PP/2254/2014
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Indra Karya
Narrative description of Project: The Purpose of Detail Design West Divertion Canal at West
Lombok Regency is to get a detailed design so that the canal can function properly and can
control the flood
Description of actual services provided by your staff within the consulting services:
 Making detail design of canal
 Performing Hydrological Analysis
 Secondary data collection
 Ground Control Point Job
 Unmanned Aerial/Drone Shooting
 Aerial Photo/Photogrammetry Data Processing
 Photo Map Making
 Creation of DSM, DEM and Contours
 Image interpretation and digitization
 Field Identification and Completeness Survey
 Making Spatial Thematic Maps
 Database Compilation
 Technical Base Map Cartography and Photo Map

Name of consulting services: Approximate value of the contract


Preparation of Jragung Multipurpose Dam (in current US$):
Project US$ 1.844.935,58

Country: Indonesia Duration of the consulting services


Location within country: Central Java (months):
21 months
Name of the Employer: Approximate value of the services provided by
Center of Dams, Directorate General of Water your firm under the contract (in current US$):
Resources, Ministry of Public Works and US$ 1.844.935,58
Housing
Address and Telephone No.: Number of man-months provided by
Pattimura street Number. 20 Telp. (021) associated Consultants:
27515389 Kebayoran Baru – South Jakarta 238 M/M
12110
Start date : 6/10/2017 Name of senior professional staff of your firm
Completion date : 1/7/2019 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,

TECH 2-11
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

(months): 21 months Project Coordinate, Team Leader):


Certificate of Minutes of Work Handover: Project Manager: Gagah Guntur Ariwibowo, ST
KU.07.06/IK-JRAGUNG/01/VII/2019
Name of associated Consultants, if any: Role of
the contract
PT. Indra Karya
Narrative description of Project:
The main objective of Preparation of Jragung Multipurpose Dam Project is to meet irrigation
requirements, control floods, generate power and source bulk water. The dam will be constructed
on the Jragung river and will have a catchment area of 94 km 2.
Description of actual services provided by your staff within the consulting services:
 Review the existing feasibility study (FS) and detailed engineering design (DEDs);
 Assess existing information/data and determine information gaps that need to be collected;
 Carry out necessary topographic and other surveys as may be required;
 Undertake hydrometric and hydrological surveys;
 Update/confirm water balance/allocation model as needed to assess sustainable yield in the
sub basin
 Carry out geological and geotechnical investigations;
 Carry out simulations of dam operations;
 Update/prepare thedetailed engineering designs (DED)(complete in all respect including,
but not limited to, all drawings, technical specifications, bills of quantities (BOQs) and
method of measurement, and other documents, etc.);
 Assess land requirements and prepare the land acquisition and resettlement (LARAP)
documents and support approval process with BPN ;
 Carry out environment impact assessment and prepare AMDAL documents and facilitate
the approval process;

Name of consulting services: Approximate value of the contract


DED, Model Test and Design Certification of (in current US$):
Kusan Dam at Tanah Bumbu Regency (Multy US$ 1.020.388,73
Years 2017, 2018, 2019)
Country: Indonesia Duration of the consulting services
Location within country: Tanah Bumbu (months):
Regency 24 months
Name of the Employer: Approximate value of the services provided by
Pemerintah Kabupaten Tanah Bumbu Dinas your firm under the contract (in current US$):
Pekerjaan Umum dan Penataan Ruang US$ 1.020.388,73
Address and Telephone No.: Number of man-months provided by
Dharma Praja Gunung Tinggi street, Batulicin associated Consultants:
Tanah Bumbu Regency Telp/Fax (0518) 247 M/M
6070169 POS code 72171 South Kalimantan
Start date : 29/3/2017 Name of senior professional staff of your firm
Completion date : 27/11/2019 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 24 months Project Coordinate, Team Leader):
Certificate of Minutes of Work Handover: Project Manager: Gagah Guntur Ariwibowo, ST
614/002/BAST.DEDB/DPUPR-AIR/2019
Name of associated Consultants, if any: Role of
the contract
PT. Indra Karya
Narrative description of Project:

TECH 2-12
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

DED, Model Test and Design Certification of Kusan Dam is located in Tanah Bumbu Regency,
South Kalimantan. The main objective of this project is to control floods, generate power and
source bulk water. The project will be implemented on 2017, 2018, 2019
Description of actual services provided by your staff within the consulting services:
 Making detailed engineering design for Kusan Dam
 Assess existing information/data and determine information gaps that need to be collected;
 Carry out necessary topographic and other surveys as may be required;
 Undertake hydrometric and hydrological surveys;
 Update/confirm water balance/allocation model as needed to assess sustainable yield in the
sub basin
 Carry out geological and geotechnical investigations;
 Carry out simulations of dam operations;
 Update/prepare the detailed engineering designs (DED) (complete in all respect including,
but not limited to, all drawings, technical specifications, bills of quantities (BOQs) and
method of measurement, and other documents, etc.);
 Assess land requirements and prepare the land acquisition and resettlement (LARAP)
documents;
 Carry out environment impact assessment and prepare AMDAL documents and facilitate
the approval process;
 Testing the model and certificating the design of Kusan Dam.

Name of consulting services: Approximate value of the contract


Urgent Disaster Reduction Project for Mount (in current US$):
Merapi and Lower Progo River Area (II), IP- US$ 963.332,75
566
Country: Indonesia Duration of the consulting services
Location within country: Yogyakarta (months):
61 months
Name of the Employer: Approximate value of the services provided by
SNVT Pelaksanaan Jaringan Sumber Air your firm under the contract (in current US$):
Serayu Opak US$ 63.303,37
Address and Telephone No.: Number of man-months provided by
Solo street Km. 6 Yogyakarta 55281 Telp. (0274) associated Consultants:
4462838, 489172 Fax. (0274) 4462838, 489552 259 M/M

Start date : 18/1/2016 Name of senior professional staff of your firm


Completion date : 3/3/2021 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 61 months Project Coordinate, Team Leader):
Certificate of Minutes of Work Handover: Co-Team Leader: Joko Cahyono
15/BAST/Aq.3.3.4/2021
Name of associated Consultants, if any: Role of
the contract
Leading – PT. Inakko Internasional
Konsulindo (64%)
Partner – PT. Virama Karya (12%)
Partner – PT. Tricon Jaya (11%)
Partner – PT. Indra Karya (8%)
Partner – PT. Barunadri Engineering
Consultant (5%)
Narrative description of Project:

TECH 2-13
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

The objective of the Urgent Disaster Reduction Project for Mount Merapi and Lower Progo
River Area (II), IP-566 is to urgently protect Mt. Merapi and the lower Progo River areas against
volcanic sediment flows which occurred much massively and frequently after the 2010 eruption
by providing both hard and soft urgent countermeasures including construction of diversion
channel and sand pocket.
Description of actual services provided by your staff within the consulting services:
 Preparation
 Preliminary Planning Inventory
 Topographic Situation Measurement
 Conducting Geological Engineering Investigations and Soil Mechanics
 Performing Hydrological Analysis
 Preparation of System Planning
 Conducting Social, Economic and Environmental Conservation Studies
 Calculation of Bill of Quantity (BOQ) and Engineer Estimate (EE)
 Preparation of Technical Specifications and Implementation Method

Name of consulting services: Approximate value of the contract


Detail Design of Ciawi Dam and Sukamahi (in current US$):
Dam US$ 464.001,69
Country: Indonesia Duration of the consulting services
Location within country: West Java (months):
7,5 months
Name of the Employer: Approximate value of the services provided by
Satuan Kerja Balai Besar Wilayah Sungai your firm under the contract (in current US$):
Ciliwung Cisadane US$ 464.001,69
Address and Telephone No.: Number of man-months provided by
Inspeksi Saluran Tarum Barat street, Number. associated Consultants:
58 Telp. (021) 8196945 Fax. (021) 8196945 East 164 M/M
Jakarta
Start date : 12/5/2015 Name of senior professional staff of your firm
Completion date : 30/12/15 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 7,5 months Project Coordinate, Team Leader):
Certificate of Minutes of Work Handover: Project Manager: Gagah Guntur Ariwibowo, ST
HK.01.48/PPKPP/BAST/BBWSCC/1315.1
Name of associated Consultants, if any: Role of
the contract
PT. Indra Karya
Narrative description of Project:
Detail Design of Ciawi Dam and Sukamahi Dam is located in West Java. The main objective of
this project is to make Detailed Design of the Dams to control floods, generate power and source
bulk water.
Description of actual services provided by your staff within the consulting services:
 Making detailed engineering design for Ciawi Dam and Sukamahi Dam
 Assess existing information/data and determine information gaps that need to be
collected;
 Carry out necessary topographic and other surveys as may be required;
 Undertake hydrometric and hydrological surveys;
 Update/confirm water balance/allocation model as needed to assess sustainable yield in the
sub basin
 Carry out geological and geotechnical investigations;

TECH 2-14
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

 Carry out simulations of dam operations;


 Update/prepare the detailed engineering designs (DED) (complete in all respect including,
but not limited to, all drawings, technical specifications, bills of quantities (BOQs) and
method of measurement, and other documents, etc.);
 Assess land requirements and prepare the land acquisition and resettlement (LARAP)
documents;
 Carry out environment impact assessment and prepare AMDAL documents and facilitate
the approval process;
 Preparation of Technical Specifications and Implementation Method

Name of consulting services: Approximate value of the contract


Feasibility Study for Dam Construction at (in current US$):
Tanah Bumbu Regency US$ 335.563,38
Country: Indonesia Duration of the consulting services
Location within country: Tanah Bumbu (months):
Regency 9 months
Name of the Employer: Approximate value of the services provided by
Pemerintah Kabupaten Tanah Bumbu Dinas your firm under the contract (in current US$):
Pekerjaan Umum US$ 335.563,38
Address and Telephone No.: Number of man-months provided by
Dharma Praja Gunung Tinggi street, Batulicin associated Consultants:
72171 Tanah Bumbu Regency South 144 M/M
Kalimantan
Start date : 2/3/2016 Name of senior professional staff of your firm
Completion date : 2/12/2016 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 9 months Project Coordinate, Team Leader):
Certificate of Minutes of Work Handover: Project Manager: Gagah Guntur Ariwibowo, ST
614/002/BASTP.FSPB/DPU-AIR/2016
Name of associated Consultants, if any: Role of
the contract
PT. Indra Karya
Narrative description of Project:
The main objective of Feasibility Study for Dam Construction at Tanah Bumbu Regency is
planning the basic design of the Dam that equipped with a budget plan and a technical feasibility
study, economical and environmental to support the availability of water. This Dam is located at
Tanah Bumbu Regency, South Kalimantan.
Description of actual services provided by your staff within the consulting services:
 Preparation work and data collection
 Topographic Surveys and Investigations,
 Geological Survey and Geotechnical Investigation,
 Hydrological Survey and Analysis
 Socio-Economic, Cultural and Environmental Survey
 Alternative Formulation and Final Selection
 Basic Design Planning
 Community Consultation Meeting (PKM)
 Economic analysis, Calculation of the Budget Plan
 Compilation of Reports, and Photo Albums
 Estimated Document Preparation Techniques

TECH 2-15
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

B.1.3 JV Partner: PT. Aditya Engineering Consultant

Name of consulting services: Approximate value of the contract


Technical Planning for Flood Control (in current US$): USD 189.338
Construction
Country: Indonesia Duration of the consulting services
Location within country: Aceh (months): 6 Month
Name of the Employer: Approximate value of the services provided by
Kuasa Pengguna Anggaran Teknik dan your firm under the contract (in current US$): USD
Konstruksi Dinas Pengairan Aceh, Indonesia 189.338
Address and Telephone No.: Number of man-months provided by
Jl. Ir. H. Mohd. Thaher No. 18 Lueng Bata – associated Consultants:
Banda Aceh 23247 16 M/M
Phone (0651) 21982, Fax. (0651) 23686
Start date (month/year): 29th July 2019 Name of senior professional staff of your firm
Completion date (month/year): 27th December involved and functions performed (indicate most
2019 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 6 Month Project Coordinate: Taufiq, SE.
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Preparation of the Preliminary report & CQP; Collecting
secondary data and maps and previous studies; Field Survey: Topography, Hydrology /
Hydrometry, Soil Mechanics, Socio-Economic and Agriculture and Environment; Field data
analysis; Community Consultation Meeting and related Institutions; Planning and design and
portrayal; Technical Discussion and Reporting.
Description of actual services provided by your staff within the consulting services:
 Preparation
 Field Survey: Topographical Survey, Geological Survey and Engineering Geology,
hydrological survey, Social Economic Survey
 Laboratory testing for soil samples
 hydrological data analysis
 Situation map depiction
 Flood control design planning and drawing
 Reporting: Final Report, Bill of Quantity, Implementation Cost Budget Plan,
Implementation Method, Tender Document.

Name of consulting services: Approximate value of the contract


Masterplan of Southern Flood Control in (in current US$): USD 197.960
Sidoarjo District
Country: Indonesia Duration of the consulting services
Location within country: East Java (months): 7 Month

TECH 2-16
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of the Employer: Approximate value of the services provided by


Satuan Kerja PPK BAPPEDA Kabupaten your firm under the contract (in current US$): USD
Sidoarjo 197.960
Address and Telephone No.: Number of man-months provided by
Jl. Sultan Agung No. 13 Sidoarjo. Phone (031) associated Consultants:
8961437, Fax. (031) 8956819 61 M/M
Start date (month/year): 09th June 2017 Name of senior professional staff of your firm
Completion date (month/year): 31st December involved and functions performed (indicate most
2017 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 7 Month Project Coordinate: Taufiq, SE.
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Carry out technical, economic and social studies, on flood
conditions, analyze data and present concepts of master plans for flood control and reporting
documents.
Description of actual services provided by your staff within the consulting services:
Study desk:
 Collecting secondary data, flood discharge, rainfall data, climate data,
 Collection of situation maps and flood problems
 Field Survey: Topography, Geology, socio-economic
 Analysis: Flood Data, Hydrological Data, Topography and Regional Geological
Conditions.
 Formulation of Flood Control Model.
 Preparation of Program Priority Scale
 Detailed Engineering Design of Flood Control Model
 Reporting.

Name of consulting services: Approximate value of the contract


Detail Design of Lava Control for Mount (in current US$): USD 271.646
Sinabung in Karo District
Country: Indonesia Duration of the consulting services
Location within country: North Sumatera (months): 8 Month
Name of the Employer: Approximate value of the services provided by
CMO Planning and Program, Satker BWS your firm under the contract (in current US$): USD
Sumatera II 271.646
Address and Telephone No.: Number of man-months provided by
Jl. Jend. Besar DR. A.H. Nasution No.30 associated Consultants:
Medan 39 M/M
Phone 061-7861533
Start date (month/year): 29th April 2015 Name of senior professional staff of your firm
Completion date (month/year): 28th December involved and functions performed (indicate most
2015 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 8 Month Project Coordinate: Taufiq, SE.

TECH 2-17
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of associated Consultants, if any: Role of


the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Topographic field surveys, Lava flow studies, planning and
description of design and reporting details.
Description of actual services provided by your staff within the consulting services:
 Preliminary Study: Secondary data collection Recent conditions; Base Map Collection.
 Field survey: Terrestrial measurement Lava flow area survey, Walktrough survey and
Plotting point with GPS
 Survey results mapping
 Planning detail design Lava flow control
 Reporting

Name of consulting services: Approximate value of the contract


Construction Supervision of Flood Control (in current US$): USD 399.133
Facilities / Infrastructures and Sediment
Batang Kuranji Middle Segment in the City of
Padang
Country: Indonesia Duration of the consulting services
Location within country: West Sumatera (months): 28 Month
Name of the Employer: Approximate value of the services provided by
CMO Irrigation and Swamp I, SNVT PJPA your firm under the contract (in current US$): USD
Sumatera V, BWS Sumatera V Provinsi 399.133
Sumatera Barat
Address and Telephone No.: Number of man-months provided by
Jln. Banjir Kanal No.1 Parak Kopi Padang associated Consultants:
Phone (0751) 34684 56 M/M
Start date (month/year): 29th September 2015 Name of senior professional staff of your firm
Completion date (month/year): 30th April 2018 involved and functions performed (indicate most
Duration of the consulting services significant profiles such as Project Manager,
(months): 28 Month Project Coordinate, Team Leader):
Project Coordinate: Taufiq, SE.
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
Leading - PT. Binatama Wirawredha
Konsultan (60%), Partner - PT. Aditya
Engineering Consultant (40%)
Narrative description of Project: Carry out Supervision, Monitoring and evaluation of Development
of Rehabilitation Irrigation Network (Channel and Building).
Description of actual services provided by your staff within the consulting services:
 Collecting preliminary drawings for the implementation of the Construction work to be
carried out.
 Joint inspection for 0% condition (MC-0%).
 Make CCO (Contract Change Order) if needed
 Carrying out Supervision of the Implementation of Construction Works
 Assist the Owner in approving the material to be used
 Make reports on the progress of work: Daily, Weekly and Monthly.
 Check the drawing as build Drawing after the job is done.
 Reporting

TECH 2-18
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of consulting services: Approximate value of the contract


SID of Potential Landslides in the Leuwikeris (in current US$): USD 291.406
Dam Inundation Area
Country: Indonesia Duration of the consulting services
Location within country: West Java (months): 10 Month
Name of the Employer: Approximate value of the services provided by
CMO Planning and Program, Satuan Kerja your firm under the contract (in current US$): USD
Balai Besar Wilayah Sungai Citanduy 291.406
Address and Telephone No.: Number of man-months provided by
Jl. Prof. Dr. Ir. H. Sutami No. 1 Banjar Jawa associated Consultants:
Barat. Phone (0265) 741686 33 M/M
Start date (month/year): 19th March 2020 Name of senior professional staff of your firm
Completion date (month/year): 28th December involved and functions performed (indicate most
2020 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 10 Month Project Coordinate: Taufiq, SE.
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Carry out detailed surveys in terms of topography, soil mechanics,
social and economics, to obtain planning drawings for dam construction details
Description of actual services provided by your staff within the consulting services:
 Preliminary Study: Collection of topographic data, geological data, hydrological data, and
socio-economic data
 Field Survey: a) Topographical Measurement: along the inundation area, long and cross
section; b) Geological mapping and geotechnical investigations (core drill, sondir, and
hand drill, testpit, followed by laboratory testing for soil samples; c) socio-economic
survey.
 Data analysis: a) analysis of soil laboratory test results; b) Hydrological data analysis; c)
Plotting and Topographic Drawing; d) Study of socio-economic and social conditions
 Design: a) Detailed design for river bank retaining; b) Reporting

Name of consulting services: Approximate value of the contract


Detail Design and LARAP of Digoel Dam (in current US$): USD 478.500
Construction in Boven Digoel District Papua
Country: Indonesia Duration of the consulting services
Location within country: Merauke Papua (months): 7 Month
Name of the Employer: Approximate value of the services provided by
CMO Planning and Program, Satker Balai your firm under the contract (in current US$): USD
Wilayah Sungai Papua Merauke 478.500
Address and Telephone No.: Number of man-months provided by
Jl. Prajurit No. 17 Merauke – Papua associated Consultants:
Phone/Fax. (0971) 321036 51 M/M
Start date (month/year): 24th May 2018 Name of senior professional staff of your firm
Completion date (month/year): 20th December involved and functions performed (indicate most
2018 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 7 Month Project Coordinate: Budi Anton Mulyono, ST.

TECH 2-19
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of associated Consultants, if any: Role of


the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Presenting Detailed Dam Design Images, Complete with
Documents and drawing plans for Land Acquisition
Description of actual services provided by your staff within the consulting services:
 Preliminary Study: Collection of topographic data, geological data, hydrological data, and
socio-economic data
 Field Survey: a) Topographical Measurement: Situation measurement along the
inundation area, long and cross section; b) Geological mapping and geotechnical
investigations (core drill, sondir, and hand drill, testpit, followed by laboratory testing for
soil samples; c) socio-economic survey.
 Data analysis: a) analysis of soil laboratory test results; b) Hydrological data analysis; c)
Plotting and Topographic Drawing; d) Study of socio-economic and social conditions
 Design: a) Detailed dam design; b) depiction and Reporting
 Study Larp: - Land Ownership Inventory, Land Acquisition Boundary Survey, Socio-
Economic Survey and Tree Stands, Calculation of land acquisition costs.

Name of consulting services: Approximate value of the contract


Feasibility Study of Digoel Dam Construction (in current US$): USD 495.414
Country: Indonesia Duration of the consulting services
Location within country: Merauke Papua (months): 7 Month
Name of the Employer: Approximate value of the services provided by
CMO Planning and Program, Satker Balai your firm under the contract (in current US$): USD
Wilayah Sungai Papua Merauke 495.414
Address and Telephone No.: Number of man-months provided by
Jln. Prajurit No. 17 Merauke – Papua. associated Consultants:
Phone/Fax. (0971) 321036 51 M/M
Start date (month/year): 30th May 2017 Name of senior professional staff of your firm
Completion date (month/year): 26th December involved and functions performed (indicate most
2017 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 7 Month Project Coordinate: Budi Anton Mulyono, ST.
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Conduct Topographic, Social and Economic Field Surveys, Carry
out technical and economic and social Feasibility Studies for Dam Development.
Description of actual services provided by your staff within the consulting services:
 Preliminary Study: Collection of topographic data, geological data, hydrological data, and
socio-economic data
 Field Survey: a) Topographical Measurement: Situation measurement along inundation
area, long and cross section; b) Geological mapping and geotechnical investigations (core
drill, sondir, and hand drill, testpit, followed by laboratory testing for soil samples; c)
socio-economic survey.
 Data analysis: a) analysis of soil laboratory test results; b) Hydrological data analysis; c)
Plotting and Topographic Drawing; d) Study of socio-economic and social conditions
 Pre-Design: a) Selection of various alternative dam locations, dam design concept; b)
economic feasibility analysis, c) depiction and Reporting
 Pre-Design: a) Pre design dam; b) depiction and Reporting

TECH 2-20
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of consulting services: Approximate value of the contract


SID - Irrigation Area Authority District 2 (in current US$): USD 421.621
(IPDMIP)
Country: Indonesia Duration of the consulting services
Location within country: South Sulawesi (months): 12 Month
Name of the Employer: Approximate value of the services provided by
CMO Planning and Program, Satuan Kerja your firm under the contract (in current US$): USD
Balai Besar Wilayah Sungai Pompengan 421.621
Jeneberang
Address and Telephone No.: Number of man-months provided by
Jl. Sekolah Guru Perawat No. 3 Makassar associated Consultants:
Phone/Fax. : (0411) 868792 – 868781 62 M/M
Start date (month/year): 30th November 2018 Name of senior professional staff of your firm
Completion date (month/year): 24th November involved and functions performed (indicate most
2019 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 12 Month Project Coordinate: Budi Anton Mulyono, ST.
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Preliminary Survey and Secondary data collection; Topographic,
Hydrological, Geological, Socio-Economic Survey; Analysis and Calculation of Hydrological
Data, Geological Laboratory Tests, Socio Economic Analysis; Planning and Depicting Main
Buildings (Weirs and Main System Networks and Complementary Buildings); Reporting: BOQ,
Technical Specifications.
Description of actual services provided by your staff within the consulting services:
 Preliminary Study: Collection of topographic data, geological data, hydrological data, and
socio-economic data
 Field Survey: a) Topographical Measurement: Mapping the situation of Irrigated areas;
b) Geological mapping and geotechnical investigations (core drill, sondir, and hand drill,
testpit, followed by laboratory testing for soil samples; c) socio-economic survey.
 Depiction of the situation map
 Irrigation system layout planning
 Planning of Weir
 Main system and drainage canal planning
 Describing the Results of Weir Planning, Main Canal system
 Preparation of work volume and implementation cost budget plan
 Final report discussion and reporting

Name of consulting services: Approximate value of the contract


SID-Irrigation Area/ Swamp Provincial (in current US$): USD 569.556
Authority (IPDMIP) Musi Rawas, OKU
Selatan, and Musi Banyuasin District
Country: Indonesia Duration of the consulting services
Location within country: South Sumatera (months): 15 Month

TECH 2-21
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of the Employer: Approximate value of the services provided by


CMO Planning and Program, Satuan Kerja your firm under the contract (in current US$): USD
Balai Besar Wilayah Sungai Sumatera VIII 569.556
Address and Telephone No.: Number of man-months provided by
Jl. Soekarno Hatta No. 869 Rt. 12 Kel. Talang associated Consultants:
Kelapa Kec. Alang-Alang Lebar Palembang 90 M/M
Phone/Fax. (0711) 414019
Start date (month/year): 30th November 2018 Name of senior professional staff of your firm
Completion date (month/year): 24th February involved and functions performed (indicate most
2020 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 15 Month Project Coordinate: Taufiq, SE.
Name of associated Consultants, if any: Role of
the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Preliminary Survey and Secondary data collection; Topographic,
Hydrological, Geological, Socio-Economic Survey; Analysis and Calculation of Hydrological
Data, Geological Laboratory Tests, Socio Economic Analysis; Planning and Depicting Main
Buildings (Weirs and Main System Networks and Complementary Buildings); Reporting: BOQ,
Technical Specifications.
Description of actual services provided by your staff within the consulting services:
 Preliminary Study: Collection of topographic data, geological data, hydrological data, and
socio-economic data
 Field Survey: a) Topographical Measurement: Mapping the situation of Irrigated areas;
b) Geological mapping and geotechnical investigations (core drill, sondir, and hand drill,
testpit, followed by laboratory testing for soil samples; c) socio-economic survey.
 Depiction of the situation map
 Irrigation system layout planning
 Planning of Weir
 Main system and drainage canal planning
 Describing the Results of Weir Planning, Main Canal system
 Preparation of work volume and implementation cost budget plan
 Final report discussion and reporting

Name of consulting services: Approximate value of the contract


Preparation of Water Resources Pattern Plans (in current US$): USD 322.380
in Kamundan Sebyar River Basin Phase II
Country: Indonesia Duration of the consulting services
Location within country: West Papua (months): 8 Month
Name of the Employer: Approximate value of the services provided by
CMO Planning and Program, Satker Balai your firm under the contract (in current US$): USD
Wilayah Sungai Papua Barat 322.380
Address and Telephone No.: Number of man-months provided by
Jl. Pasirindo, Kelurahan Manokwari Timur, associated Consultants:
Po. Box 235, Manokwari 98311 Papua Barat 65 M/M
Start date (month/year): 21st March 2018 Name of senior professional staff of your firm
Completion date (month/year): 15th November involved and functions performed (indicate most
2018 significant profiles such as Project Manager,
Duration of the consulting services Project Coordinate, Team Leader):
(months): 8 Month Project Coordinate: Budi Anton Mulyono, ST.

TECH 2-22
Bangka Island Flood Management in
Bangka Belitung Province
TECH-2 Loan Agreement Number: Loan EDCF INA-22

Name of associated Consultants, if any: Role of


the contract (leading or just partner)
PT. Aditya Engineering Consultant
Narrative description of Project: Analysis of Raw Water and Irrigation Needs Assessment,
Compilation of Water Resources Management, Socialization and Workshop
Description of actual services provided by your staff within the consulting services:
 Preparation: Secondary data collection, Central Statistics Agency, Base Map, Spatial
utilization map, Land use map, Hydrological data, Climate data,
 Inventory: Data collection of current river utilization.
 Drafting the concept of river water utilization plan.
 Drawing, Reporting, discussion

TECH 2-23