2. Determine the flow of water through the new cast iron pipe shown in
figure below. What is the pressure head at B which is 30m from the
reservoir A. Sketch the energy and the hydraulic gradient lines.
For AC line length =60m, diam. =30cm.
For CD line length =30m, diam.=15cm
Head loss at point C is 15cm, k=0.03cm, 0.01poise.
1.0m
(A) 1.5m
(B)
(C)
(D)
1/1
3. For the system shown in figure below, when the flow from reservoir A
to main C is 0.1424 m3 /s, the pressure at C is 1.38 bar. The flow to C
should be increased to 0.186 m3/s, with a pressure of 2.76 bar. What is the
size of a pipe 1524 m long, which should be laid from B to C (shown
dotted) parallel to the existing 305 mm to accomplish this result. Sketch
the total energy line in both cases neglecting the secondary losses.
ℓ=2438m
D=407mm
(A) F=0 03 ℓ=1524m
(B) D=305mm
Q=0.1424m3/s F=0 003
(C)
ℓ=1524m
D=???
F=0 04
4.For the pipe system of four pipes, bend,
one Turbine and two tanks
the secondary losses are Considered.
4
(? ?) K2=1000 3
Q2=0.03m3/s
K1=13000
Q1=? ? K3=3000
(A)
Q3=? ?
Turbine (T)
(Head=20m)
1 2