You are on page 1of 6

LINE NO.

#: BUILDING GB2

PILOT INITIAL LAY-OUT Pilot


Output per Output per
(Style No. : GWP Dandelion Floral Script Print Mini Cosmetic Case picture Finished SEPT ,2021 Hour Day
C9880G) Date:

Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name :

picture picture picture picture picture picture picture picture picture picture picture picture

High Head

1 1 1 1 1 2 2
4 5 7 9
1 5 6 7 9 1 3
2
CLEANI QUALITY PACKING
NG INSPECTION AREA

1 1 1 1 1 2 2
1 3 6 8 3
s
0 2 4 8 0 2
D
Y

High
High Pole High Pole High Pole High Head High Head High Head High Pole High Head Head

Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name : Process Name :

picture picture picture picture picture picture picture picture picture picture picture picture

PREPARED BY PILOT IE: REVIEW PILOT TECHNICIAN: APPROVED BY PRODUCTION MANAGER


STANDART LAY-OUT ASSEMBLY
BUILDING GA2 (Style No. : LG FLAP PHONE WRISTLET picture Finished Date: 13/12/2021 Output per Hour 35 pcs Output per Day 280 pcs summary

JOIN CARD JOIN ZIPPER


POCKET WITH WITH OUTSIDE & Assembly 22
INT COLLAR INSIDE BODY

JOIN CARD JOIN INT JOIN INSIDE


POCKET WITH 22 LINING POCKET 36 DOUBLE TAPE DOUBLE TAPE 45 POCKET WITH 75 Painting 9
SPINNER CARD WITH FLAP FACING ZIPPER OUTSIDE BODY
LINING BODY

ATTACH MYLAR ATTACH ATTACH LABEL JOIN TOP FLAP PRESS EDGE
WITH CARD DOUBLE TAPE GLUING 31 ONLINING 16 DOUBLE TAPE 65 DOUBLE TAPE 16 GLUING 11 WITH FLAP 21 BODY BOFOR 65 Bonding 17
POCKET ON POCKET SPINNER BODY BODY END ZIPPER OUTSIDE BODY FACING GO TO
CARD PAINTING

FOLDING EGDE GLUING INT JOIN FLAP JOIN END GLUING FLAP
GLUING CC OF POCKET GLUING INT 21 LEFT POCKET & 11 FACING WITH 24 ZIPPER WITH 12 GLUING INSIDE 11 FACING AND 45 CUT THREAD 21 HAMMERING
85 Assembly 3
CARD POCKET LEFT COLLAR BODY AFTER SEWING EDGE OF BODY linning
CARD POCKET CARD BODY ZIPPER TOP FLAP

TOTAL MP 51

TO
FROM CPX FROM CPX PAINTING

CM

QUALITY INSPECTION

PACKING AREA
1 4 6 7 14 15 17 20
9 12 20

2 3 5 8 10 11 13 16 18 19 21
High Head High Head
s
D
Y

CM

FROM CPX

TRIMMING
SEWING CARD AFTER SEWING TRIMMING SEWING LEFT
SEWING WITH INT LEFT CARD WITH INT SEWING INT AFTER SEWING POCKET SEWING ZIPPER SEWING PATCH SEWING INSIDE FINAL
MIDDLE POCKET AND LEFT POCKET LEFT POCKET 66 INT LEFT 81 (GUSSET) WITH 16 WITH OUTSIDE 64 HANDLE 12 WITH BODY 91 CLEANING 84
HANDLE SNAP CARD AND POCKET MAIN BODY BODY (UPPER)
SNAP
DOUBLE TAPE TRIMMING
CUT THREAD SEWING EDGE AND FOLDING SEWING AFTER SEWING SEWING END SEWING ZIPPER SEWING INSIDE SEWING INSTALL
AFTER OF POCKET INT LEFT SPINNER WITH TACKING ZIPPER 61 WITH INSIDE 10 WITH OUTSIDE 38 AROUND FLAP 14 PULLER
CARD POCKET POCKET CARD HANDLE POCKET BODY (DOW)

SEWING CC SEWING SEWING ZIPPER CUT THREAD CUT THREAD CUT THREAD
TACKING 16
CARD POCKET WITH BODY AFTER SEWING AFTER SEWING AFTER SEWING
HANDLE

CUT THREAD
AFTER

PREPARED BY REVIEW BY APPROVED BY APPROVED BY APPROVED BY APPROVED BY


IE PRODUCTION IE COORDINATOR PRODUCTION TECHNICIAN PRODUCTION MANAGER FACTORY MANAGER PRODUCTION DIRECTOR
SUMMARY
MODULE MP
Assembly A 21
Assembly
2
Lining
Painting 10
Bonding 8
Recut 1
Skiving 1
TOTAL MP 43
PILOT INITIAL LAY-OUT
Pilot Finished
(Style No. :LG ZIP PKT BACKPACK picture Date: #REF! Output per Hour #REF! Output per Day #REF!
(JAYCEE) 35S2S8TB7B )

239 240 242 246 245 248 249 252 253 256 257 262 266 267 268 272 273 274 275
258

TABLE WORK TABLE WORK TABLE WORK TABLE WORK TABLE WORK

Press Logo High Head High Pole High Pole High Pole High Pole High Pole

DY
s
CM

1 1 1 1 1 2 2 2 2
1 3 6 8 9 1 3 5 QU
8 9 2 3 5 7
ALI
TY
PAC
INS KING
1 1 2 PEC ARE
1 1 1 2 2 2 2
2 4 5 7 6 7 4 TIO A
0 2 4 0 1 6 8 N
High Head High Pole High Pole High Pole High Pole High Head
DY

s
CM

MODULE MP
Assembly 26
TABLE WORK TABLE WORK TABLE WORK TABLE WORK TABLE WORK TABLE WORK TABLE WORK

241 243 255 244 247 250 251 254 259 260 263 264 265 269 270 271 274 275 276
261

TOTAL TIME 2783

PREPARED BY REVIEW BY APPROVED BY APPROVED BY Skiving Bonding Re-cutting Painting


PILOT IE PILOT MANAGER FACTORY MANAGER FACTORY MANAGER

You might also like