Professional Documents
Culture Documents
ISo, 200
250 r Bo»
v200
Pecast corce flaor units
fhaov units
Supported n
stee she
Dogo00oag
mgks welded
v bolted to
sttel bem
ends of thar unts
notthed to fit uder veinfovced concede phecast concete
top flange of bewm beam caet in-situ flor unif
Phecost concee flor unts SUppor ted Pecaat concwte flav uníts bearíng
by shetf mgles a d steel beam Cn einforced conwete beam
2390
1200 \engmso 24.o
V
Increments
He vod n
slot in slab Pecnat conceke fiawe to frame joint
Fig. 117
shd md plae
Conechon
PHcast conwete
Wall unN
snchuval
topping
tie vod n
siot in slab
pecast
venfovced
ConNele
flaov slab
Precst concek
fleor dab
end of precast
concee he slab
nothed fov coluwn
steel box Caat
end of beam
In
bEArS on angle cowmn tie bav throngh koe
I colum E cast ito topp íng
airfovcement lwpPS
vetnforement lopPs
ard he venforemert*
he seel
beween slabs
vebated precnst
horizontal anfovced
jOnt. cocee
flaor slab
eitonement
laops and He
shd in vehcal
Joint
vevHcnl joint
m packed with cenue
wwsthk se
between Cow ot
Coluw And P e t carokde
clodding unNt- Wall fvame
t
peCAst carcee
codding Unit
hit
UNtS -
-Hr slab beare
n tos ot beam
Gie eccued with
lomm dowele
Prec
52 lgktweigst
concrele blacks
KDIECOs
uny
dep-in
x c o coluve
a 1 8 Centves
sCveedd
4 eparded polyehye
baot sechon
Pecaet bA
K270 X
Precagt veforced
cladding units
cenerete wall tvames md preeret conwete
Fig.1115
108