1. BALANCE SHEET
financial statements that company has given the collateral guarantee for
the loan taken by its associate company directors loans advances granted
amounting to Rs. 380.39 Lakhs (as on 31/03/2021) to group companies
associated companies in which directors are interested; the company is
yet to comply within the provisions of section 186 of the Companies Act,
2013.
The total revenue for the FY-2021 is Rs 20546573 which is less than the
PY 2020, with the decrease in total expenses too due to Covid-19.
PAT is increased to Rs 4815467 in FY 2021 and the NET PROFIT also
increases for the year 2021 that is Rs 3143543.
Total cash and cash equivalents for the year 2021 is Rs 3175457 which
shows a substantial increase from the PY 2020. It also shows a increase in
Operating profit , it shows that the sales for the year 2021 has been
increased along with managing the costs.
4. SERVICES PROVIDED BY THE COMPANY-
Consultancy
Generation
Hydro Power
EPCC-M
O&M
PROJECTS –
The Project “Daman Ganga SHP – I is located 30 kms away from Vapi in
Distt Valsad, Gujarat and envisages uitilisation of water from the reservoir of
the Madhuban Dam built across river Daman Ganga with total catchment
area of approx. 1300 sqkm shared by Maharashtra, Gujarat and Dadra &
Nagar Haveli (UT). The capacity of the Project is
3 MW (1.5 MW X 2 Units).
Two openings have been provided in the body of
the Dam which have been further connected with
the main Power House Building through 2 nos.
Steel Penstocks with 1.5 M dia , 12 mm thick and
9.5 M long coupled with Butter Fly Valves of 1.6
m dia. The Power House Building (22.5 m x 10
m ) is a unique structure of about 24 m height
from the deepest foundation level, fully compact
and water tight, designed as to submerge in the
water during high flood levels. The approach to the Power House is from the
top (EL. 61.26 m) and descends at Generator Floor Level at (EL. 44.5 m)
housing 2 Generating Units (Vertical Kaplan) of 1.5 MW each (Austrian
make) attached with compatible Hydro Generator from France and linked
with state of the art Control Pannels procured locally through reputed
manufacturers . To facilitate handling of equipment, 1 no. EOT of 20 tons
capacity has been provided at the top of the Power House. The top is fully
covered with specially designed remote Sliding Roof .
The functioning of the generating units is controlled by the Digital Turbine
Control (DTC) and the complete Project can be monitored through
sophisticated Digital Control System (DCS) at merely a click of the button,
anywhere in the world through designated global positioning link.
The metering system and relays are installed inside a common Sub / Control
Station at a short distance of 500 mtrs from the Power House and the power
produced is stepped up at 3.3 / 66 kV Switch yard and will further be
evacuated through dedicated 66 kV ( 23.5 kms) Double Circuit Transmission
Line laid by the Company till receiving Sub Station at Mota Panda – Govt.
of Gujarat.
The debt. funded by the Bank of India, Chennai Corporate Banking Branch,
Chennai, the prestigious project has recently been commissioned and the
Power being generated is being supplied to the state grid of Gujarat.
Zimbabwe T&D
The Project “Daman Ganga SHP – I is located 30 kms away from Vapi in
Distt Valsad, Gujarat and envisages uitilisation of water from the reservoir of
the Madhuban Dam built across river Daman Ganga with total catchment
area of approx. 1300 sqkm shared by Maharashtra, Gujarat and Dadra &
Nagar Haveli (UT). The capacity of the Project is 3 MW (1.5 MW X 2
Units).
Two openings have been provided in
the body of the Dam which have
been further connected with the
main Power House Building through
2 nos. Steel Penstocks with 1.5 M
dia , 12 mm thick and 9.5 M long
coupled with Butter Fly Valves of
1.6 m dia. The Power House
Building (22.5 m x 10 m ) is a
unique structure of about 24 m height from the deepest foundation level,
fully compact and water tight, designed as to submerge in the water during
high flood levels. The approach to the Power House is from the top (EL.
61.26 m) and descends at Generator Floor Level at (EL. 44.5 m) housing 2
Generating Units (Vertical Kaplan) of 1.5 MW each (Austrian make)
attached with compatible Hydro Generator from France and linked with state
of the art Control Pannels procured locally through reputed manufacturers .
To facilitate handling of equipment, 1 no. EOT of 20 tons capacity has been
provided at the top of the Power House. The top is fully covered with
specially designed remote Sliding Roof .
The functioning of the generating units is controlled by the Digital Turbine
Control (DTC) and the complete Project can be monitored through
sophisticated Digital Control System (DCS) at merely a click of the button,
anywhere in the world through designated global positioning link.
The metering system and relays are installed inside a common Sub / Control
Station at a short distance of 500 mtrs from the Power House and the power
produced is stepped up at 3.3 / 66 kV Switch yard and will further be
evacuated through dedicated 66 kV ( 23.5 kms) Double Circuit Transmission
Line laid by the Company till receiving Sub Station at Mota Panda – Govt.
of Gujarat.
The debt. funded by the Bank of India, Chennai Corporate Banking Branch,
Chennai, the prestigious project has recently been commissioned and the
Power being generated is being supplied to the state grid of Gujarat.
5. LOANS-
The regulator carried out investigation between June 2014 and August
2014 into the IPO of equity shares issued by Tarini International and its
subsequent activities related to the trading of shares.
Of the total fine levied by Sebi, Rs 5.05 crore have been imposed on the
firm, while its managing director Vakamulla Chandra Shekhar and
whole-time director Vakamulla Anu Naidu face a fine of Rs 5 crore each
for violating various market norms.
At current total retail loan corporate loans and other loan includes the