Estimate Details

Work Estimate KHSDRP/2021-22/BD/WORK_INDENT3590


Number

Work Information

Work Category : Buildings Name of the Providing SS False Ceiling, epoxy flooring and other alliged works for proposed
Work : modular Eye OT at District Hospital Tumkur

Geographical Information

Geographical Informations are not defined

Schedule B

Sl Item
Item Name Unit Quantity
No Code
1 6.4.7 Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner Mtr 50
sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip
thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 - 3.5 core 50
sqmm ---- ----- Complete with all lead and lift loading & unloading charges etc., work should be
carried out as per the Specification and direction of Engineer in Charge of the work
2 6.5.7 Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe/ stoneware pipe Mtr 50
/on wall / on pole as required. In existing trench/duct. On wall/Structure - 25 sqmm to 75
sqmm ---- ----- Complete with all lead and lift loading & unloading charges etc., work should be
carried out as per the Specification and direction of Engineer in Charge of the work
3 Data Providing and fixing 50 mm thick prefabricated walkable stainless steel panels ceiling The panel Sqm 45.9
rate should have a composite construction of two skins, one side stainless steel 304 grade 0.8 mm
thick and other side sheet is PPGI sheet of 0.6 mm thick. And these two sheets are held
together with aluminum ‘w’ section of 48mm x 10.2mm for frame work &
inner space between two sheets is filled with Puff insulation with density of 40KG per Cubic
meter. The panel size should be 1.20Mts x 3.00 Mtrs. The stainless steel surface should be
brush / MAT finish with antiglare property. The false ceiling panels are designed in such way
that to fit within each other. There shall be minimum joints. If joints are necessary the panels
will be jointed each other by using aluminum ‘H ‘ section 29 mm x 42 mm for
interlock system. And all panel joints will be sealed by using compressible food grade silicon
sealent to ensure air tight vapor tight construction. The false ceiling shall be walkable with
provision of service panel. The false ceiling should be fixed to the concrete slab by using 8mm
treaded tension bars with adjustable turn buckles, fastener, nuts, bolts etc., complete to the
concrete slab. Coving: Providing corner joint coving for wall to wall used to provide smooth and
seamless corner coving buffed aluminium extruded profile R75 ‘C’ cap, L
section profile, ‘Z’ section profile.The required size cut outs for fixing of lights
& also for any other services shall be made. The cost includes the cost of all materials, labour
charges for fixing, transportation, lead, lift and etc., complete. The works shall be carried out as
per the directions of the Engineer in charge. ( Note: The panel should be free from scratches &
dents ) MODULAR OT area -6 mtr X6 mtr apprxt. Say 36.00 Sqm ( Approved RATE In
Pavagada MCH Estimate ) ---- ----- Complete with all lead and lift loading & unloading charges
etc., work should be carried out as per the Specification and direction of Engineer in Charge of
the work
4 Data Antistatic Epoxy Flooring : Providing and laying 4mm thick anti-static, anti-fungal and anti- Sqm 45.9
rate bacterial epoxy flooring after preparing the floor surface by removing all loose particles, dirt by
using coir brush and vacuum cleaner. Applying one coat of Moisture barrier primer and then
applying self-leveling 2mm thick moisture barrier layer to capture the moisture of the existing
flooring. Then the anti static grid is laid with conductive granules and copper strips. Then apply
one coat of epoxy based primer and allow for dry 6- 8 hours. Then apply epoxy putty and allow
for dry 6 – 8 hours. And then apply 2 mm thick self-leveling epoxy flooring of approved
make, colour and shade. The Epoxy flooring should be impact resistance, chemical resistance
including abrasion and fumigation with R75mm coving wall to wall, wall to flooring etc., The cost
includes cost of material, labour, transportation etc., complete. The works shall be carried out
as per the directions of the Engineer in charge.(Approved Rate in Hiriyur TLH Estimate ) ----
----- Complete with all lead and lift loading & unloading charges etc., work should be carried out
as per the Specification and direction of Engineer in Charge of the work
5 Data SS 304 Double Door ( Scientific ) SS 304 Double Scientific Door with Puff insulation size 1500 x No 1
rate 2100 Door Shutter Details Doors are designed to fit flush into the wall systems on both sides
and are supplied in different dimensions. Doors are fabricated from SS 304 Grade with PUFF
INFILL ONLY. Door type: Scientific SS 304 Metal Doors Shutter Thickness 0.8 mm Double Leaf
Door ( with PUFF INFILL ONLY) SS Ball Baring Butt Hinges – 102 x 75 x 3 mm

1 of 2 07-01-2022, 17:32
eProcurement https://eproc.karnataka.gov.in/eprocurement/common/public_view_ten...

Sl Item
Item Name Unit Quantity
No Code
number of hinges will vary base on the door size Both Side Key Operated Lock & Key D-Handle
19 x 254 mm SS 304 – BOTH SIDES DOOR Closure with Standard Arm Clear Float
Glass of size based on the door size Concealed Flush Bolt – 300 mm Length(
Approved RATE In Oncology Tumkur Estimate ) ---- ----- Complete with all lead and lift loading
& unloading charges etc., work should be carried out as per the Specification and direction of
Engineer in Charge of the work
6 Data PERIPHERAL LED LIGHT2 x 2 LED CLEAN ROOM LIGHT FITTINGS WITH SS 304 Bottom, 40 No 10
rate watt ( Suitable for Class 1000 application) ( Approved RATE In Oncology Tumkur Estimate )
---- ----- Complete with all lead and lift loading & unloading charges etc., work should be carried
out as per the Specification and direction of Engineer in Charge of the work
7 Data Static Pass Box SS.304Supply of 18 GG SS.304 construction Static passbox with following Nos 2
rate specifications:- a)Double walled construction with double doors on both sides. b)Coving at
internal corners. c)Both side flushed clear polycarbonate sheet/ Toughened Glass in doors. d)
Matt Buffed Finish. e)Puff filled double skin Doors. h)Electromagnetic door interlocking. "Pass
box Inner Dimension: 610mm L x 610 mm D x 610 H " ( Approved RATE In Oncology Tumkur
Estimate ) ---- ----- Complete with all lead and lift loading & unloading charges etc., work should
be carried out as per the Specification and direction of Engineer in Charge of the work
8 Data Flushed X-ray View Box TWO Plate dimmable X-Ray viewing screen designed to provide a high Nos 1
rate level of control luminance without flicker. Flushed with Wall with Metal border flushing (
Approved RATE In Oncology Tumkur Estimate ) ---- ----- Complete with all lead and lift loading
& unloading charges etc., work should be carried out as per the Specification and direction of
Engineer in Charge of the work
9 Data SS SCRUB : Stainless Steel Scrub Sink with automatic and manual Foot or knee operator / Nos 1
rate sensor with 2 Bays: Compact Surgical Scrub sink should be designed for use in Operation
theatre complex providing surgeons with a convenient sink for pre op scrub up. Each fixture
should be fabricated from heavy gauge type 304 stainless steel of 1.6mm thickness & should
be seamless welded construction polished to a satin finish. The scrub sink should be provided
with a front access panel, which should be easily removed for access to the water control valve,
waste connections, stopper strainer. Hands free Operation should include infrared sensor and
foot operator with built in range of adjustment. Thermostatic Mixing Valve control should be
located behind the access panel & maintain constant water tempreture. The timing should be
adjustable to meet individual application requirement, provided with infrared sensor
thermostatic controlled taps with fail- safe temperature controls. All units should have reduced
anti splash fronts It should have knee/foot operated switch.( Approved Rate in Renovation of
OT at Chitradurga District Hospital Estimate ) ---- ----- Complete with all lead and lift loading &
unloading charges etc., work should be carried out as per the Specification and direction of
Engineer in Charge of the work