Waktu

Nama
No. Feb Sept Okt Nov Des Jan Februari
kegiatan
3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Pengajuan
1
judul
Pembuatan
2 proposal
penelitian
Seminar
3
proposal
4 Penelitian
5 Seminar hasil
Sidang akhir
6 (ujian
pendadaran)

Waktu
Nama Okt Nov Des Jan
No. Mar-
kegiatan
Sept
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Pembuatan
1 proposal
penelitian

Seminar
2
proposal
Tahap
analisis
meliputi
Pengumpulan
data
Preliminary
design
3
Analisis
beban

Analisis
struktur

Waktu
Nama
No.
kegiatan
Nama Okt Nov Des Jan
No. Mar-
kegiatan
Sept
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Kontrol
kapasitas
penampang

4 Seminar hasil

Sidang akhir
5 (ujian
pendadaran)

Waktu
Nama
No. Mar- Okt Nov Des Jan
kegiatan
Sept 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Proposal
1
penelitian
Seminar
2
proposal

Tahap analisis
perencanaan
meliputi:

a. Pengumpula
n data
- Data
sekunder: data
tanah
- Literatur
- Pustaka
b. Preliminary
design
- Denah 2D
(AutoCAD)
dan 3D
(SkethUp)
3
c. Analisis
beban berupa
beban mati,
beban hidup,
beban angin,
dan beban
gempa
d. Analisis
struktur
meliputi:
- Manual
(Pelat)

- SAP2000
(Rangka
atap,balok,
kolom, tangga
dan ramp,
serta pondasi)

e. Kontrol
kapasitas
penampang
dan
kesimpulan
saran

4 Seminar hasil
Sidang akhir
5 (ujian
pendadaran)
Tabel 4.1 Panjang Batang Kuda-Kuda
Nama batang Panjang (m)
F1 = 1.40
F2 = 1.40
F3 = 1.40
F4 = 1.40
F5 = 1.40
F6 = 1.40
F7 = 1.40
F8 = 1.40
F9 = 1.40
F10 = 1.40
F11 = 1.52
F12 = 1.52
F13 = 1.52
F14 = 1.00
F15 = 1.52
F16 = 1.52
F17 = 1.52
F18 = 1.52
F19 = 1.00
F20 = 1.52
F21 = 1.52
F22 = 1.52
F23 = 0.58
F24 = 1.82
F25 = 1.16
F26 = 2.23
F27 = 1.74
F28 = 2.23
F29 = 1.74
F30 = 2.23
F31 = 1.74
F32 = 2.23
F33 = 1.74
F34 = 2.23
F35 = 1.74
F36 = 2.23
F37 = 1.16
F38 = 1.82
F39 = 0.58
F40 = 1.40
F41 = 1.40
F42 = 1.40
F43 = 1.40
F44 = 1.72
F45 = 1.00
F46 = 1.72
F47 = 1.00
F48 = 1.72
F49 = 1.00
F50 = 1.72
F51 = 1.40
F52 = 1.40
F53 = 1.40
F54 = 1.40
F55 = 0.58
F56 = 1.82
F57 = 1.16
F58 = 1.82
F59 = 0.58
Jumlah panjang batang = 87.40