The 4th Industrial Revolution (“4IR”) | Building the Power Utility of the Future, Today
1. Background information
2. Demand Profile and Revenue Impact
3. Impact on Municipalities
4. New Roles for Municipalities
5. Recommendations
6. Considerations
7. Technology Requirements
2007/2008 2014-2019 1
2016/2017 Current
• First Spells of load • March 2014 • 90 260 verified installed PV • IRP (draft) – 200MW Embedded
shedding in Nov- • 2015 – Jan to Sep roof top systems Generation
Jan to increased • 2016 More bouts of • Represents 180MWp • 2 May 19 - 1MW to 10MW,
energy demand. load shedding • R 2.7 billion with a limit of 500MW annually
• 2018 – June, Nov, • (PQRS info) – PV Performer applicable for own use
Dec Platform, quality assurance generation
• 2019 – Feb, March platform. Comfort – End users• Feb 19 – DBSA received $100m
and Investors by the Green Climate Fund for
embedded Generation
Opportunity for Transformation – investment Programme.
Microgrids seen as the mobile phone in the • Develop model to fund
embedded generation projects
Electricity Industry
27th AMEU Technical Convention 2019
The 4th Industrial Revolution (“4IR”)
Building the Power Utility of the Future, Today
Demand Profile and Revenue Impact
Residential
customers represent
18% of consumers,
during peak this can
increase to 35%.
Munics supply
electricity at winter
peak at a loss.
Recoup During Peak
and Off Peak
Source: D De Vos, A solution to SA’s Power Crisis https://techcentral.co.za/a-solution-to-sas-power-crisis/58482/
40% of Revenue
TOU Tariff Flat Rate
Elec Dx Impact
Customers
Look for
Death Munics sell
less power
Free Rider
Alternatives
Spiral Same Fixed
Costs
Effect
Stakeholder
Engagement Agility
Speed is key to ensure
resiliency and efficiency
Future is DER
Integration
Other Loads
Utility Meter 6 x PV Plants Genset Other Loads
Fuel Cell
54kV 1.3MW 400kW
Natural Gas Waste Water Treatment
27kV
Plant, Animal Shelter, Fire
13kV
Safety and Training, Fleet
21kV
garage
1.4MW
24kW
Remote monitoring & Monitoring Power / Energy and other KPI for
forecasting each DER using a web access
Off grid mode Control DER for anticipating on future off grid
preparation events
Generation
Cut-off non-priority loads when the
Load shedding
Management production can not reach the consumption