Professional Documents
Culture Documents
IN
9 - ASCC MUST ONLY FOLLOW THE SLEEVE LOCATIONS AND SIZES
PROVIDED BY UNIPODS AND THEY WILL ONLY BE PROVIDED AFTER
DRAWINGS FINAL APPROVAL.
10 - ANY TILES' SIZES DEVIATIONS WILL BE COMPENSATED WITH
ADJUSTING THE TILES' GROUT THICKNESSES.
JB
AP-01 AP-02
MANIFOLDS MOVED
BECAUSE PIPES ARE BLOCKING
AS BUILT
THE ACCESS PANEL
CWM-04
G1
HWM-02 RC-02
IN IN
J256-ASCC-PODS-SD-003 WALLS TYPOLOGY
LC
CWS-01 EG-01 CWS-02 EG-01
HWS-01 PEX-H CWS-03 CWS-04 PEX-C HWS-02 DRG. NO. DESCRIPTION
REFERENCES
REVISIONS
CLIENT:
CENTRAL DUBAI PROJECT LLC
CLIENT REPRESENTATIVE:
https://north25.ae
PO Box 112288, Dubai, UAE
CONCEPT ARCHITECT:
WOODS BAGOT,DUBAI
TEL : 04 404 1600
P.O.BOX : 58041
RC-02 WWW.WOODSBAGOT.COM
IN IN
IN
85
100
AP-02
AL SAHEL
Khalifa Juma Al Nabooda & Khalid Khalifa Al Nabooda & Company
450
679.5
Tel: 9714 2857324 Fax: 9714 2851609 P.O. Box: 3815 Dubai
600
AP-01
100 600
1359
1540
WALL FINISH
15mm SHADOW GAP LINE FCL +2400
250
494 735
DA-04
430
327
250
MAINTENANCE OF RESIDENTIAL BUILDING
296
DA-05 + DA-06
250mm SLEEVE CUT-OUT TO BE
IN
P01 (MAID)
MEP
SCALE DATE DRAWN BY CHECKED BY APPROVED BY
NTS 03-11-20211 JM JM JM