You are on page 1of 2

KITCHEN CABINET PLAN

NOTE 1:
Tile works covers the entire kitchen
counter. From splashboard, countertop,
sidewalls and interior walls of the cabinet

NOTE 2:
LABOR COST
Php 1,000.00 for kitchen counter cabinet.

NOTE 3:
CABINET PARTITION IS EQUAL.
VERIFY ACTUAL LENGTH ON SITE ( L/3 )
CEILING GROUND FLOOR
NOTE:
CEILING PLAN FOR GROUND FLOOR
COVERAGE
 LIVING AREA CEILING
 DINING AREA CEILING
DINING AREA DINING AREA  T&B (CR) CEILING
T&B T&B
NOTE:
PARTITION WORKS FOR GROUND FLOOR
 STAIRCASE PARTITION
Ceiling width – to verify on site  STAIR STEP COVER

LIVING AREA LIVING AREA

STAIR PARTITION

CEILING PLAN REFLECTIVE CEILING PLAN


LIVING AREA
DINING AREA

DINING AREA

LIVING AREA

You might also like