REQUEST FOR EXPRESSION OF INTEREST FOR THE CONSULTANCY SERVICES TO UNDERTAKE CONSTRUCTION SUPERVISION OF THE INTERIM INTERVENTION/
REHABILITATION OF THE KAMPALA – MALABA METER GAUGE RAILWAY LINE – CONSULTING FIRMS . PROC.REF.No. URC/CONS/2021-22/00148
1. Introduction: 2.9 Approve and/or issue working drawings, approve the setting out of the purpose of this tender procedure. All members of the Consortium, a). A certified copy of the Joint Venture, Association or Consortium
Uganda Railways Corporation (URC) is a body corporate established works and give appropriate instructions to the Contractor Joint Venture or Association shall be jointly and severally liable to the agreement which is legally binding on all parties/partners, showing:
by the Uganda Railways Corporation Act, Cap 331 to Construct, Procuring and Disposing Entity. The participation of an ineligible party i. All parties/partners, Associates shall be jointly and severally liable for
Operate and Maintain Railway, Marine and Road services both inside 2.10
Prepare Engineers Instructions (EI) and Variation Orders (VO) will result in automatic disqualification the execution of the contract in accordance with the Contract terms;
and outside Uganda for the carriage of passengers and goods. as recommended or necessary, complete with the associated ii. One of the parties, partners or Associates will be nominated as being in
measurement and payment instructions, 6. Number of Applicants charge, authorised to incur liabilities, and receive instructions for and
The Uganda Railways Corporation has allocated funds to be used for No more than one application can be submitted by a party or firm on behalf of any and all partners of the joint venture, association or
the Procurement of Consultancy Services to undertake Construction 2.11 Make and maintain continuous accurate records and measurement whatever the form of application (as an individual firm or member of consortium; and
Supervision of the Interim Intervention/Rehabilitation of the Kampala throughout the duration of the project to facilitate agreements on the a Consortium, Joint Venture, Association). In the event that a party iii. The execution of the entire Contract, including payment, shall be done
– Malaba Railway Line. URC now invites sealed expressions of Contractor”s final account. submits more than one application, applications in which that person exclusively with the party, partner or associate in charge.
interest from eligible Consulting firms for the provision of the above 2.12 Prepare and submit the Final Completion Report (FCR) has participated will be excluded. iv. A Power of Attorney from each of the parties to the JV/Association
Consultancy Services. authorising the formation and/or entering into the JV
3. Performance Period: 7. Code of Ethical Conduct. b). Power of Attorney (notarized/certified if copy) of the signatory(ies) of
The overall objective of the assignment is for the consultant to The exercise shall be undertaken in a period not exceeding sixteen (16) As part of the application, applicants must submit a signed Code of the bid authorising signature of the bid on behalf of the Joint Venture,
supervise and monitor the physical progress and financial status of months comprising a construction/rehabilitation period of ten (10) Ethical Conduct for Bidders issued as per Guideline 4/2014 of the PPDA. Consortium or Association.
the construction/rehabilitation works on behalf of Uganda Railways months and a defects liability period of 6 months. This can be accessed from the PPDA Website at www.ppda.go.ug
Corporation with the objective of ensuring that the works are completed 2. Technical Capacity.
on time, within budget while meeting engineering and safety standards. The Consultant shall possess the required staff with qualifications and
4. The Consultant’s staffing, qualifications and Experience: 8. Number of applicants to be shortlisted.
experience as defined in 4 above.
The Consultant shall be shortlisted in accordance with the Public The key staff positions listed below are considered essential and will The shortlist shall to the extent possible, have six (6) Consultants.
Procurement and Disposal of Public Assets Regulations, 2014, and be the basis for the evaluation of the consultant’s proposed staffing. If more than six eligible Consultants meet the above criteria, the relative
the selection criteria set out in this notice. Experience of the firm in at least two assignments of a similar nature in 9. Selection Criteria. strength and weaknesses of their application shall be re-examined to
the last 10years, fluency in the English language and registration with The following Criteria will be applied. identify the best six applications for the tender procedure. The factors
2. Scope of the Assignment: the relevant professional bodies (for the key staff) will be considered (1). Eligibility of the Consultant. which will be considered during this re-examination are:
The Assignment shall comprise but not necessarily be limited to the essential This is to be evidenced by submission of the following documents as part The number of similar assignments shall be evidenced by copies of
following tasks: of the application. reference letters or recommendations from Clients related to specific
i) Resident Engineer/Team Leader (Registered) – Relevant Bachelor’s • A Notarized or certified copy of the Trading Licence for 2021 or its assignments.
2.1 Check and establish that the contractor mobilizes and supplies to site Degree in Engineering with 15 years experience in leading and equivalent.
all plant, equipment and machinery that has been committed in the 10. Submission of Applications
managing roads/Railway construction projects and 10 years’ • A Notarized or certified copy of the Certificate of Registration of the
tender and ensure that all such terms of plant remain on the contract Applications should be in English, clearly marked “Expression of
until their release has been authorised demonstratable experience in contract management specifically in Consultant or its equivalent.
Interest to Provide Consultancy Services for the Interim Intervention/
measurement and claims management • A signed statement indicating that the Consultant does not have a
Rehabilitation of the Kampala – Malaba Railway Line,’’ indicating
2.2 Evaluate and approve the Contractors work programme, method conflict of interest in the subject of the procurement. the procurement reference number and the name of the applicant and
statement and material sources ii) Materials Engineer (Registered) – with a relevant Bachelor’s Degree • A copy of the Consultant’s annual Tax Clearance Certificate for the be submitted at the address below by Friday 12th, November 2021 at
or equivalent. 15 years relevant experience in leading material previous financial year, or a transaction Tax Clearance for the year 3:00pm.
2.3 Prepare quality assurance plan and make arrangements to check testing and investigations on roads and/or rail projects and ten years 2021 addressed to Uganda Railways Corporation for the purpose of Interested Consulting Firms may obtain further information at the address
the quality of materials brought to site, ensure that the quality of
experience in preparation of quality management/assurance plans and this procurement. below:
construction is consistent with the specifications and maintain test
undertaking quality audits • A Power of Attorney of the authorised signatory to the proposal The Head, Procurement and Disposal Unit
records
registered with the Uganda Registration services Bureau. Uganda Railways Corporation
2.4 Assist the Contractor to establish a Quality Management System. The Following Non Key Staff shall be required; Firms that are registered with PPDA on the register of providers 1st Floor, Room No.10, URC Headquarters Building,
shall not be required to submit a Trading Licence or Certificate of Plot 57, Nasser Road, P.O Box 7150, Kampala.
2.5 Check that all project documents are complete and accurate before Registration, but shall be required to provide evidence of registration 11. The Planned procurement schedule (subject to changes) is as follows;-
being issued to the contractor (a). Survey Assistants (2No) – Diploma in Survey (minimum) and 6 years
experience in roads construction and/or rehabilitation projects by PPDA for the year 2021. Activity Date

2.6 Support the Client to prepare for and facilitate a pre-construction (b). Laboratory Technicians (2No) – Higher Diploma in Civl Engineering Publication of Notice of 28.10. 2021
Where the business of a Consultant is not registered in Uganda and a
meeting with the works contractor. Cary out quality audits of materials and 6 years specific experience in laboratory material testing and field Expression of Interest
document required to evidence eligibility is not available in the country of
and works at regular intervals material investigations and testing the Consultant, the Consultant shall submit an alternative document or a Closing Date for receipt of 12.11. 2021 at 3:00pm
(c). Works Inspectors (2No) with a higher Diploma in Civil statement affirming that the document is not available in the country of the expression of interest
2.7 Develop Key performance Indicators and a work plan to monitor all Engineering(minimum) and 6 years experience in the supervision of Evaluation of Expression of Interest November 15th to 30th, 2021
Consultant.
aspects of the quality of the works as well as environment and social Invitation for submission Within 5 working days from
Railway maintenance or rehabilitation works
management plan to be reported on a monthly basis of proposals approval of short list by
5. Candidature For a Joint venture, Consortium, or Association, the documents to
Only Consulting firms, Consortiums, Joint ventures or Associations of evidence eligibility, shall be required for each member of the Joint Venture, Contracts Committee.
2.8 Be responsible for all administration work related to the project
firms may apply. The Consortium, Joint venture or Association may be Consortium or Association and the following additional documents shall be
supervision requirements including proper conduct, attendance and ACCOUNTING OFFICER
permanent or a temporary grouping, legally established for the specific required:
performance of duties of the staff