DATE OF TIME OF
CONTRACTOR
7 OBSERVERS
NAME:
BADGE / IQAMA: COMPANY
NAME:
BI NUMBER:
INCIDENT
(1/1/2016)
INCIDENT
(12:00)
10-01996 &
6 Sabre Alam 447589 Azmeel 02027 10/21/21 8:24AM
10-01996 &
7 Sabre Alam 447589 Azmeel 02028 11/03/21 15PM
awaiyah Infra & Support Division- TCF1 GCPD INCIDENT REGISTRY-Azmeel TCF- 1
MATERIAL
PTW (PERMIT WORK ELEVATED
Year PERSONS PPE
(choose X if TO WORK) PROCEDURE AREAS
applicable)
Doing
X Not followed
unsafe act
Doing
unsafe act Not followed
HOT TRENCHIN
CONFINED
HEAVY WORK/ G& BARRICAD
ELECTRICAL TOOL VEHICLE SPACE
EQUIPMENT WELDING & EXCAVATI E
ENTRY
CUTTING ON
Use of
cellphone
Use of
mech.
Equip near
utilities
Inadequat
e Not
pedestrian provided
access
ENVIRONMENTAL
GROUND LEVEL OBSERVATION AREA Describe What Happened?
& HEALTH ISSUE
RECOMMENDED
ANALYSIS -Why did it happen? IMMEDIATE ACTION TAKEN FUTURE CORRECTIVE
ACTION
Foreman Amar was not aware of Mr Amar was bared from using vehicle until Safety Talks on road
the fact that because of heavy clearance and fresh driving test conducted by Site safety by HSE
spray of water in the morning Safety Department. All wet patches on site raods Manager on regular
made the road slippery. was spread with dry soil for soaking water. intervals.
Future transportation
of manhole shall have
proper securing of
wedges nailed on one
wooden plank so that
rolling force can be
The both wooden wedges were adressed & avoid
placed to work independently to falling of manhole .
stop the rolling movement of All the manhole transportation to TCFs are halted till Safety Talks on
manhole rather wedges secured manufacturing of requisite size and shape wedges handling/unloading
on one piece of wood plank to are not available. of material from
work against rolling force on trailers.
either side. Safety Officer
presence is
mandatory before
loading for ensuring
implementation of
SOPs
SAPMT Safety
Advisor propmt
action and mind Azmeel 02/19/18
alertness avoided
the accident
SAPMT Safety
Advisor propmt
action and mind Azmeel 02/19/19
alertness avoided
the accident
03/06/19
03/07/19
Permit was
available at the Sabre alam (safety
site and workers officer) 447589 Azmeel 10/23/21 12:00 AM
were in full PPEs.
Permit receiver
was available at
Sabre alam (safety
site and all crew officer) 447589 Azmeel
were given safety
orientation
INCIDENT
PREVENTIO
CONFIRMATION OF
N
CORRECTIVE ACTION
BULLETIN
IMPLEMENTATION
(IPB)
DEVELOP
yes
yes
Total: 5 Division Name: Haradh & Hawaiyah Infra & Support Division- T
Final
PIR
Date of Incident Time of Incident Final within Report
Incident ID Week Month Reported
(1/1/2014) (12:00) 72hrs? Rec'd by
with 24Hrs?
Dept
Azmeel Veolia MODERATE (ON-JOB First Aid Injury Offjob Azmeel Labour
FATAL, DAMAGE) Camp Haradh
Azmeel Hexagon LESS THAN MINOR First Aid Injury Onjob Azmeel
(FAI, MTC, DAMAGE) Laydown TCF-1
Hazardous
Body Part Accident Types Sources of Injuries Recommended Corrective Action
Condition
209 IMPROPER
325 Right, Lower 0704 REACTION
SLIPS LOSS OF 1001 OTHER ARRANGEMENT Report to SAPMT and send him to First Aid Clinic
Extremities , BALANCE (NOT SOURCES PROCEDURE- and then after transfer to the King Fahad
Ankle FALLS) INADEQUATE Hospital Hufof for his further assesment
HOUSEKEEPING
697 OTHER NO
266 General 1298 ACCIDENT N/A HAZARDOUS
TYPE - OTHER
CONDITION
698 OTHER
1298 ACCIDENT HAZARDOUS
266 General TYPE - OTHER CONDITION-
OTHER
Incident Prevention
Actions
Root Cause Bulletin
Corrected
(IPB) Develop?
Closed
Closed
Closed NO