You are on page 1of 1

KETERANGAN

11,70 11,70
1,70 10,00 1,70 1,00 1,00 2,00 2,00 2,00 2,00

KM/WC

KM/WC

2,50
K.17 K.16 K.15 K.14
3,15

3,15
6,30

6,30
KORIDOR

1,30
NK TR

REVISI / Revisions
3,15

3,15
No. TGL Revisi Paraf
K.13 K.12 K.11 K.10 K.09

2,50
DAPUR

1,70 2,00 2,00 2,00 2,00 2,00 PROYEK / Project

DENAH ATAP / ROOF TOP DENAH LT. ATAS


SKALA 1 : 100 SKALA 1 : 100

PEMILIK / Owner
MENYETUJUI / Approve
PEMILIK / Owner

11,70
1,70 1,00 1,00 2,00 2,00 2,00 2,00

PERENCANA
DISETUJUI / Approved

KM/WC

KM/WC

2,50
3,15 K.08 K.07 K.06 K.05

Mulyana
Arsitek
6,30

6,30

KORIDOR

1,30
NK
JUDUL GAMBAR / DrawingTi l e
3,15

K.04 K.03 K.02 K.01

2,50
DENAH EXISTING
DAN PERUBAHAN
PARKIR MOTOR

11,70 3,70 2,00 2,00 2,00 2,00 DIGAMBAR MULYANA

DENAH AWAL (EXISTING) DENAH LT. BAWAH (PERUBAHAN) TANGGAL / Date

SKALA 1 : 100 SKALA 1 : 100 No. GBR / Drawing no. NTS

SKALA / Scale 1 : 100 A3

You might also like