ENGINEERING DEPARTMENT

PREVENTIVE MAINTENANCE PROGRAM


Periode Year : 2015
Januari Februari Maret April Mei Juni Juli Agustus September Oktober Nopember Desember
No EQUIPMENT Location
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
1 BOOSTER PUMP 1 Roof Top
2 BOOSTER PUMP 2 Roof Top
3 BOOSTER PUMP 3 Roof Top
4 BOOSTER PUMP 4 Roof Top
5 BOILER PUMP 1 Basement
6 BOILER PUMP 2 Basement
7 TRANSFER PUMP 1 Basement
8 TRANSFER PUMP 2 Basement
9 DEEPWEEL PUMP Ground Floor
10 JOCKEY PUMP Basement
11 ELECT. FIRE PUMP Basement
12 DIESEL PUMP Basement
13 HYDRANT BOX All Floor/Area
14 APAR All Floor/Area
15 WTP PUMP 1 Basement
16 WTP PUMP 2 Basement
17 SUMPIT PUMP 1 Basement
18 SUMPIT PUMP 2 Basement
19 SUMPIT PUMP 3 Basement
20 SUMPIT PUMP 4 Basement
21 SUMPIT PUMP 5 Basement
22 SUMPIT PUMP 6 Basement
23 WATER FAL PUMP Ground Floor
24 BBM PUMP 1 Basement
25 BBM PUMP 2 Basement
26 PREASURE FAN 1 Roof Top
27 PREASURE FAN 2 Roof Top
28 Boiler Fan Basemant
29 Fresh Air Bs Basemant
30 Exhaust Bs Basemant
31 Fresh Air 1 Kitchen
32 Exhaust 1.1 Toilet lobby
33 Exhaust 1. 2 Kitchen
34 Exhaust 2. 1 Toilet 2nd floor
35 Exhaust 2. 2 Pre Fungtion
36 Exhaust 2. 3 Lounge bar
37 Exhaust 3. 1 Male Loker
38 Exhaust 3. 2 Female Loker
39 Exhaust Rest Room 1 Roof Top
40 Exhaust Rest Room 2 Roof Top
41 PANEL MDP Basement
42 PP. BS Basement
43 PP. AC BS Basement
44 PP. LAUNDRY Basement
45 PP. TRANSFER PUMP Basement
46 PP. SUMPIT Basement
47 PP. DEP WELL Basement
Januari Februari Maret April Mei Juni Juli Agustus September Oktober Nopember Desember
No EQUIPMENT Location
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
48 PP. WTP Basement
49 PP. BBM PUMP Basement
50 PP. HYDRANT Basement
51 PP. KITCHEN 1st floor
52 PP. 1 1st floor
53 PP. AC1 1st floor
54 PP. 2 2nd floor
55 PP. AC-2 2nd floor
56 PP- 2 2nd floor
57 PP. AC 2 3 th floor
58 PP 3 3 th floor
59 PP. AC 3 3 th floor
60 PP. 5 5 th floor
61 PP. 6 6 th floor
62 PP. 7 7 th floor
63 PP. 8 8 th floor
64 PP.9 9 th floor
65 PP.AC 9 9 th floor
66 PP. ROOF TOP Roof Top
67 Room Control Panel 9 th floor
68 TAMBLER 1 Basement
69 TAMBLER 2 Basement
70 TAMBLER 3 Basement
71 MANGLER 1 Basement
72 MANGLER 2 Basement
73 WASHING 1 Basement
74 WASHING 2 Basement
75 WASHING 3 Basement
76 WASHING 4 Basement
77 Walk in Chiller 1 st Floor
78 Walk in Frezeer 1 st Floor
79 Upridge Chiller 1 1 st Floor
80 Upridge Chiller 2 1 st Floor
81 Upridge Chiller 3 1 st Floor
82 Kuali Ring 1 st Floor
83 Food Warmer 1 st Floor
84 Washing Steamer 1 st Floor
85 Fryer 1 st Floor
86 Bio Master Ground Floor
87 Grease trap Basemant
88 Raw Tank 1 st Floor
89 Clean water Tank 1 1 st Floor
90 Clean water Tank 2 1 st Floor
91 Clean water Tank 3 1 st Floor
92 Roof Tank Roof Top
93 Audio Video 1 st Floor
94 Paging System 1 st Floor
95 MCFA Basement
96 CCTV Basement
97 MATV 1 st Floor
Januari Februari Maret April Mei Juni Juli Agustus September Oktober Nopember Desember
No EQUIPMENT Location
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
98 PABX System 1 st Floor
99 Genset Basemant
100 Boiler 1 Basemant
101 Boiler 2 Basemant
102 GUEST LIFT 1
103 GUEST LIFT 2
104 SERVICE LIFT
105 PRIVATE LIFT

Prepared by, Approved by,

Chief Engineer General Manager


ENGINEERING DEPARTMENT
PREVENTIVE MAINTENANCE PROG
Periode Year :
Januari Februari Maret April Mei Juni Juli Agustus September Oktober Nopember Desember
No EQUIPMENT Location
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 AC SPLIT Bs 1 EDR
2 AC SPLIT Bs 2 EDR
3 AC SPLIT Bs 3 HK
4 AC SPLIT Bs 4 HRD
5 AC SPLIT Bs 5 PURCHASING
6 AC SPLIT Bs 6 ENG
7 AC SPLIT Bs 7 PANEL
8 AC SPLIT Bs 8 SECURITY
9 AC SPLIT Bs 9 EAM
10 AC SPLIT 1.1 OPERATOR
11 AC SPLIT 1.2 FOM
12 AC SPLIT 1.3 RUBISH
13 AC SPLIT 1.3 MARKETING

Prepared by, Approved by,

Chief Engineering General Manager


Desember
51 52 53
ENGINEERING DEPARTMENT
PROJECT MAINTENANCE PROGRAM
Periode Year :
MONTH
NO JOBS LOATION REMARK
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

1 Perbaikan puvling block lantai parkir area Sekeliling Hotel Done


2 Ganti Oli, filter oli, filter racor, filter air Basement Done
3 Ganti Battery Genset Basement
4 Pembelian alat test air accu
5 Perbaikan sensor pintu guest lift No. 1 Done
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26