Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Extension of Flood

Control Structure along Siocon River (Upstream)


SIOCON, ZAMBOANGA DEL NORTE
CONTRACT ID. NO.: 18J00044
EFFECTIVITY OF CONTRACT: JULY 26, 2018
EXPIRY DATE: FEBRUARY 15, 2018
CONTRACT DURATION: 204 CD
CONTRACT COST: Php 101,233,141.10 WORK FLOW SCHEDULE

A.1.1(11) 10
174 CD 174189

A.1.2(5) 11
174 CD 174189

B.7 12
174 CD 174189

1710(5) 13
153 189
MOBILIZATION 69 CD
0 (B.9) 1 B.4(1) 2 1702(1) 3 1716(16) 4 1716(12) 6 508(1) 16 DEMOB (B.9) 17
0 0 15 CD 15 15 6 CD 21 21 9 CD 30 30 1 CD 31 31 53 CD 84 84
105 CD 189 189 15 CD 204 204

1716(6) 5 404(1)a 7 404(1)b 8 404(1)b3 9 1713(1)


11 CD 42 84 15 CD 99 143 7 CD 106 150 30 CD 136 180 9 CD

A.1.1(3) 14
15 CD 30 189

B.5 15
16 189
1 CD

LEGEND:

EVENT NUMBER
0
EARLY START 0 0 LATE START / FINISH

- CRITICAL PATH

- ACTIVITY

- DUMMY / FLOAT

SHEET CONTENT: PREPARED BY: CHECKED BY: SUBMITTED TO: SHEET NO.:

WORK FLOW SCHEDULE


BRB Design & Construction
Company
BEA RUTH B. BAQUIRAN ENGR. RAIZA B. CAMMA 2
PROJECT ENGINEER INSTRUCTOR
3

You might also like