Professional Documents
Culture Documents
UPDATE : 09 JANUAR
H-Beam (HB)
NO MATERIAL BERAT/unit BERAT/M¹ LUAS/M² KET : M2/TON
1 HB 100 100 5 7 - 12 M 178.00 14.83 0.60 40.45
2 HB 100 100 6 8 - 12 M 206.40 17.20 0.60 34.88
3 HB 125 125 6.5 9 - 12 M 285.60 23.80 0.75 31.51
4 HB 150 150 7 10 - 12 M 378.00 31.50 0.90 28.57
5 HB 175 175 7.5 11 - 12 M 482.40 40.20 1.05 26.12
6 HB 200 200 8 12 - 12 M 598.80 49.90 1.20 24.05
7 HB 250 250 9 14 - 12 M 868.80 72.40 1.50 20.72
8 HB 300 300 10 15 - 12 M 1,128.00 94.00 1.80 19.15
9 HB 350 350 12 19 - 12 M 1,644.00 137.00 2.10 15.33
10 HB 400 400 13 21 - 12 M 2,064.00 172.00 2.40 13.95
11 HB 152 152 6,1 6,83 - 12 M ( 6" ) 277.00 23.08 0.91 39.51
12 HB 203 203 7,32 8,36 - 12 M ( 8" ) 556.00 46.33 1.22 26.29
13 HB 204 206 8 12,52 - 12 M ( 8" ) 625.00 52.08 1.20 23.04
14 HB 254 254 8,64 14,17 - 12 M ( 10" ) 875.00 72.92 1.52 20.90
15 HB 299 306 11,07 11,07 - 12 M ( 12" ) 947.00 78.92 1.50 19.03
16 HB 346 370 12,8 12,85 - 12 M ( 14" ) 1,303.00 108.58 3.83 35.24
17 HB 308 305 9,91 15,39- 12 M ( 12" ) 1,161.00 96.75 1.84 19.04
KET
KET
KET
KET
KET
KET
Rumus
زx0,006165
Estimasi pengajuan
harga pekerjaan besi
dengan vol.kecil
vol.kotor x 2
KET
KET
KET
KET
KET
KET
KET
KET
KET
Rumus
t x 7,8475
4"x8"
1219,2x2438,4 / 1 jt
2,979 m²
KET
KET
rumus
t x lb x 0,078
KET
KET
KET
ukuran :
2,1 x 5,4 m = 11,34 m²
Lebar efekif :
1,8x5,1 m = 9,18 m²
KET
KET
1 Kg Cat = 5 m²
1 Kg Cat : 2 Kg Thinner
1,219.20 x
Grating 1.00 m² 45.5 Kg 4" x
p
Merk : (mm) x
Krakatau Steel 1219.20
Gunung garuda
Lautan Steel b²
1 Kg Cat = 5 m² 4
( a x a
1 Kg Cat : 2 Kg Thinner ( 4 x 4
16
4
Bata ringan 1 m³ 150 pcs
100x200x600 1 Truck 900 pcs 0.00
1 Pallet 150 Pcs
1 m² 8.3333 pcs
1 pcs 0.12 m²
1 Truck 10.8 m³
1 m³ 650 kg
5.946
a² = c²
- 2 =
) - ( b x b ) = 41.035990582
) - ( 2 x 2 ) =
- 4
12.00
3.4641016151
Keterangan :
* SNI Menetapkan standar toleransi 0.01 Hingga 0.02 mm (milimeter)
Selebihnya maka disebut "besi beton banci".
* Nilai Koefisien = 0.006165
* SNI 07-2052-2002
BjTP = Baja tulangan polos
Keterangan :
* SNI Menetapkan standar toleransi 0.01 Hingga 0.02 mm (milimeter)
Selebihnya maka disebut "besi beton banci".
* Nilai Koefisien = 0.006165
* SNI 07-2052-2002
BjTP = Baja tulangan polos
BjTD = Baja tulangan beton sirip
Volume = (0.25x3.14xز)xPxBJ Input Manual
Keterangan :
Ø = Diameter besi beton
P = Panjang besi beton
BJ = Berat jenis besi beton (7.850 kg/m³)
RUMUS = ز x 0.006165
= 0 x 0.006165
= ( 0 x 0 ) x 0.006165
= 0 x 0.006165
= 0.00 Kg/Meter
= 0.00 x 12 m
= 0.00 Kg/Batang
CALC.
PANJANG KG
0.00
KG BTG
#DIV/0!
LUAS PLAT
P L LUAS
4" 8"
1,219.20 2,438.40
1.22 2.44 2.973 m²
BERAT HOLLOW
B
P = PANJANG
A C
DIMENSI
SISI L P Luas (m²) t Koef. Kg/Btg Kg/m¹
A
B
C
D
0 0 4 7.845 - #DIV/0!
STRAUSS / PONDASI BOR PILE
DIAMETER = 0.5 m
PANJANG = 7m
Ø TU = 16 mm
JUMLAH TU = 6 Bh
Ø TB/Sengkang = 8 mm
JARAK TB = 0.15 m
Selimut Beton = 0.05 m
JUMLAH SECTION = 10 Section
Kebutuhan
1 Section Strauss Pile
Tulangan Utama
TU = ز x 0.006165
= 16 x 0.006165
= 256 x 0.006165
= 1.578 Kg/m x 12 m = 18.93888 Kg/btg
Panjang = 7.00 m
Overlap = 0.640 m 40 D
Panjang Lewatan = 0.800 m 50 D
Tekukan ujung = 0.384 m 12 Dx2 (atas bawah)
1 Bh TU = 8.82 m x 6 Bh
= 52.944 m
Total Pjg Per Titik = 53.00 m 4.416667
Total Batang = 4.42
= 5.00 Batang
Total Kg = 83.6467
= 83.65 Kg/Titik
1 Section
Strauss Pile
Tulangan Utama = 16 mm
= 5.00 btg x 10 Section = 50 Btg
= 946.944 Kg
Tulangan Pembagi = 8 mm
/sengkang = 0.86 btg x 10 Section = 9 Btg
= 40.9406 Kg
Persyaratan pembesian :
* Overlape = 40D
* Panjang lewatan ujung atas = 50D
* Tekukan Ujung Atas 90° = 12D
Kebutuhan Bata Ringan :
Dimensi Calc.konversi kebutuhan bata ring
Dimensi (m) Luas Vol
Banyaknya
Ukuran Per Buah Per Buah
P L T
(m²) (m³)
CATATAN :
1 M2 = 8,33 BH
1 M3 = 83,33 BH
1 RIT = RATA-RATA 10,8 M3
Note :
untuk estimasi lapangan,tinggal mengubah untuk kebutuhan mortar dalam
satuan Kg/m².
.konversi kebutuhan bata ringan
Bata ringan 1 m³
Sat. Vol. Sat. Vol. Sat.
100x200x600 1 Truck
Bh 0.0 m³ 0.00 m² 1 Pallet
m³ 0.0 Bh 0.00 m² 1 m²
m² 0.0 Bh 0.00 m³ 1 pcs
1 Truck
1 m³
150 pcs
900 pcs
150 Pcs
8.3333333 pcs
0.12 m²
10.8 m³
650 kg
SKECTH
PILECAPE/FOOTPLATE/POER Sambungan Lewatan
Berdasarkan SNI-03-2847-2002 dan ACI 318
Sambungan lewatan dilakukan untuk elemen
struktur yang panjang dan menerus sehingga
tulangan yang dipasang memerlukan
penyambungan -- di samping ada pula
sambungan mekanis, namun sambungan
lewatan adalah jenis sambungan yang paling
umum
dilakukan dalam pelaksanaan di lapangan
A = Panjang
B = Lebar
C = Tinggi
HARGA UPAH
Acian 1.00
Bekesting (sloof,ring balok,Kp) 1.00
Bekesting anak tangga 1.00
Bekesting Pondasi - 4 sisi 1.00
Bekesting tangga 1.00
Beli Besi Di mandor sudah di fabrikasi,incl material 1.00
Benangan 1.00
Bobok beton Hanya upah,tidak incld Alat 1.00
Bongkar bekesting 1.00
Bor strouse Ø300 mm - mandor Lihat kondisi tanah 1.00
Borong kerja & Mat'l Rumah 5x6 m 1.00
Borong Kerja Cat Tembok Incld Mat'l (ex.Dulux/Catilax,Mowilex,Propan) 1.00
Cat pintu(fabrikan) Incld Mat'l + pasang kembali 1.00
cat Tembok Eksterior Hanya upah,tidak incld Alat 1.00
cat Tembok interior Hanya upah,tidak incld Alat 1.00
Galian Tanah Manual Lihat Volume galian + situasi 1.00
Handrail Tangga(Typ.Teralis) Incld Mat'l + pasang + painting 1.00
HOTDIP 1.00
Instalasi air (Pvc) 1.00
Instalasi pipa Hydrant Per inch Ø x Upah 1.00
Join geomembran Lembaran Estimasi,t : 1,5 mm 1.00
Join pipa drat Jasa - Alat - consumable + incl.fit-up 1.00
Join Pipa HDPE Per inch Ø x Upah 1.00
Join Pipa tekanan Jasa - Alat - consumable + incl.fit-up 1.00
Join pipa tekanan >20" Jasa - Alat - consumable + incl.fit-up 1.00
Join Pipa tidak bertekanan Jasa - Alat - consumable + incl.fit-up 1.00
Join pipe to flange 2xHarga Join las Tergantung dari jenis flange + incl.fit-up
Kanopi GRC ,Lb= 60 cm Incld Mat'l + pasang 1.00
Lantai Kerja Lihat volume pekerjaan 1.00
Lantai Kerja Lihat volume pekerjaan 1.00
Lisplank GRC ,Lb= 55 cm Incld Mat'l + pasang 1.00
List plafon Incld Mat'l + pasang 1.00
Meja dapur 1.00
Partisi (Gypsum,GRC Board) Incld Mat'l + pasang + Rangka (2 sisi) 1.00
Pasang Atap Asbes Alat 1.00
Pasang Bata merah 1.00
Pasang Bata ringan - lt 1 = 2 m 1.00
Pasang Bata ringan - lt 2 = 3-4 m 1.00
Pasang Closed,Wastafel 1.00
Pasang Granit 1.00
Pasang keramik 1.00
Pasang Keramik Tangga,KM/WC 1.00
Pasang lis keramik 1.00
Pasang rangka atap galvalume Alat 1.00
Pembesian tulangan- mandor 1.00
Pemetaan Lahan Denah,Situasi,Cut & fill,Crassing,As-built 1.00
Pengecoran (Sloof,Rb,Kp,Lt.kerja) 1.00
Pengecoran Ready Mix 1.00
Pengecoran Set mix 1.00
Plafon (gypsum) Incld Mat'l + pasang + Rangka 1.00
Plesteran 1.00
Setting Daun Pintu (Kayu) 1.00
Snei Pipa (mesin bubut),Maks 1" Jasa - Bengkel - banten 1.00
Snei Pipa (mesin Snei),Maks 1" Jasa - Bengkel - banten 1.00
Upah pembesian Mandor 1.00
Urugan Tanah Kembali 1.00
Urugan Tanah sirtu 1.00
PEK.
m² Rp 20,000
NO
m¹ Rp 35,000
ttk Rp 25,000 1
m² Rp 55,000 2
m² Rp 55,000
Kg Rp 9,500 15% Rp 10,925 2020
m² Rp 15,000 3
m³ Rp 700,000 15% Rp 805,000 2020 4
m² Rp 15,000 5
m¹ Rp 50,000 6
unit Rp 300,000,000 15% Rp 345,000,000 2020
m² Rp 47,000 15% Rp 54,050 2020
unit Rp 450,000
m² Rp 15,000 15% Rp 17,250 2020
m² Rp 12,000 15% Rp 13,800 2020 PE
m³ Rp 85,000
NO
m¹ Rp 550,000
kg Rp 7,500 1
m¹ Rp 25,000
Inch Rp 35,000 15% Rp 40,250 2020
m² Rp 20,000 15% Rp 23,000 2020
inJoint Rp 15,000
Inch Rp 60,000 15% Rp 69,000 2020
inJoint Rp 85,000
inJoint Rp 45,000
inJoint Rp 85,000
m¹ Rp 240,000
m³ Rp 300,000 2
m¹ Rp 25,000
m¹ Rp 220,000
m¹ Rp 19,000 3
m² Rp 55,000 4
m² Rp 180,000 5
m² Rp 27,000
m² Rp 45,000 15% Rp 51,750 2020
m² Rp 35,000
m² Rp 45,000
unit Rp 200,000
m² Rp 50,000
m² Rp 45,000
m² Rp 45,000
m¹ Rp 17,000
m² Rp 25,000
kg Rp 3,500
Ha Rp 2,500,000 15% Rp 2,875,000 2020
m¹ Rp 25,000
m³ Rp 100,000
m³ Rp 150,000
m² Rp 120,000
m² Rp 30,000
Unit Rp 125,000
Joint Rp 75,000
Joint Rp 25,000
kg Rp 3,000 15% Rp 3,450 2020
m³ Rp 75,000
m³ Rp 45,000
PEK. INSTALASI - AC
HARGA PER UNIT (RP)
ITEM PEKERJAAN UNIT
MATERIAL JASA
Pipa tembaga + insulasi
1/4" mtr Rp 45,300.00 Rp 8,000.00
3/8" mtr Rp 60,400.00 Rp 10,600.00
1/2" mtr Rp 79,300.00 Rp 14,000.00
5/8" mtr Rp 109,500.00 Rp 19,000.00
3/4" mtr Rp 143,500.00 Rp 25,300.00
1/8" mtr Rp 117,500.00 Rp 31,000.00
1-1/8" mtr Rp 264,400.00 Rp 46,600.00
1-3/8" mtr Rp 370,000.00 Rp 66,000.00
1-5/8" mtr Rp 400,000.00 Rp 74,000.00
1/4" + 1/2" mtr Rp 90,000.00 Rp 16,000.00
Pipa drain + insulasi
3/4" mtr Rp 22,600.00 Rp 4,000.00
1" mtr Rp 37,700.00 Rp 6,600.00
Support outdoor 15- 2 PK set Rp 41,500.00 Rp 7,300.00
Kabel u/ wire controller mtr Rp 22,600.00 Rp 4,000.00
Jasa pemasangan unit AC
Wall mounted unit 0,5 - 1,5 PK unit Rp 350,000.00
Wall mounted unit 2 - 3 PK unit Rp 400,000.00
PER UNIT (RP)
TOTAL
Rp 277,700.00
Rp 325,900.00
Rp 50,400.00
Rp 28,200.00
Rp 60,400.00
Rp 365,900.00
Rp 53,300.00
Rp 71,000.00
Rp 93,300.00
Rp 128,500.00
Rp 168,800.00
Rp 148,500.00
Rp 311,000.00
Rp 436,000.00
Rp 474,000.00
Rp 106,000.00
Rp 26,600.00
Rp 44,300.00
Rp 48,800.00
Rp 26,600.00
Rp 350,000.00
Rp 400,000.00
HARGA MATERIAL
HARGA
URAIAN QTY
SATUAN
Adibond 1 Kg Rp 58,000
Alat snei pipa 1/2" - 1 1/4" 1 set Rp 385,000
Angkur 16 x 40 + 2 Mur + Ring 1 set Rp 34,000
Angkur 16 x 50 + 2 Mur +1 Ring 1 set Rp 37,500
Angkur 16 x 60 + 2 Mur +1 Ring 1 set Rp 40,000
Angkur 19 x 50 + 2 Mur + Ring 1 set Rp 47,500
Angkur 3/4" X 500 + 2 Nut 1 set Rp 58,300
Angkur 7/8" X 500 + 2 Nut 1 set Rp 63,300
Angkur M16-300 1 Btg Rp 17,000
Apar 6 Kg 1 unit Rp 550,000
AS Tembaga 5/8" - 2m 1 Btg Rp 750,000
Atap Bluescope AZ100 tbl 0,4 -L 700 1 Lbr Rp 286,700
Atap Bluescope AZ100 tbl 0,4 -L 750 1 Lbr Rp 239,700
Atap D750 ,tbl 0,4 mm 1 m¹ Rp 52,500
Atap Zincalume AZ150 L1000,Spandek 0,4 mm 1 m¹ Rp 73,000
B/N 1/2" x 1 1/2" + Ring 1 Set Rp 2,125
B/N 1/2" x 1 3/4" + Ring 1 Set Rp 2,040
B/N 1/2" x 1" + Ring 1 Set Rp 1,500
B/N 1/2" x 2" + Ring 1 Set Rp 2,232
B/N 1/2" x 3" + Ring 1 Set Rp 2,650
B/N 3/4" x 2 1/2" 1 Set Rp 7,550
B/N 3/4" x 21/2" A325 1 Set Rp 12,700
B/N 3/8" x 1" + Ring 1 Set Rp 850
B/N 5/8" x 2" + Ring 1 Set Rp 4,200
B/N 5/8" x 2" A325 1 Set Rp 7,500
B/N M12 x 25 1 Set Rp 1,700
B/N M12 x 40 1 Set Rp 1,950
B/N M16 x 50 1 Set Rp 3,975
B/N M19 x 60 1 Set Rp 6,600
B/N Ø12 x 25 A325 1 Set Rp 2,625
B/N Ø12 x 40 A325 1 Set Rp 4,000
B/N Ø16 x 50 A325 1 Set Rp 7,900
B/N Ø22 x 65 A325 1 Set Rp 21,300
Ban Gerobak sorong - Mati 1 set Rp 125,000
Barricade Tape 75mm-200 m 1 Pcs Rp 72,000
Bata Merah 1 Pcs Rp 450
Batu gerinda WD 4"x1.2 1 pack Rp 100,000
Baut M6 x 40 mm 1 set Rp 2,000
Baut roofing ,driling 2 cm 1 pcs Rp 250
BBM (pertalite) ecer 1 ltr Rp 10,000
Besi beton D10 mm-12 m SNI 1 Btg Rp 62,000
Besi beton D16 mm-12 m SNI 1 Btg Rp 187,500
Besi beton D19 mm-12 m SNI 1 Btg Rp 218,000
Besi beton dia 8 mm-12 m SNI 1 Btg Rp 52,500
Besi beton dia10 mm-12 m SNI 1 Btg Rp 93,772
Besi beton dia12 mm-12 m SNI 1 Btg Rp 99,000
Betel 1 pcs Rp 17,000
Bodem 5 Kg 1 pcs Rp 80,000
Bulu rolset 4" 1 Pcs Rp 9,000
Cat Bodelac 2 in 1 anti karat tint base pastel BS 1 kg Rp 77,000
Cat Emco Doft 1 Kg Rp 56,980
Cat Nippon Paint 1 Kg Rp 55,000
Cat Nippon Paint-Bodelac anti karat,Prime top 1 Pail Rp 732,160
Cat Nippon Paint-Zinchromate 1 Pail Rp 498,960
Catok 4 inch RRT / ragum (Murahan) 1 unit Rp 320,000
Catut 1 pcs Rp 27,000
Chainblock 1 ton Rantai 10 mtr 1 unit Rp 2,100,000
Clading spandek 0,4 1 m¹ Rp 73,000
CNP125.50.20 ,t : 2,3 mm-6 m 1 Btg Rp 225,000
CNP150.50.20 ,t : 2,3 mm-6 m 1 Btg Rp 275,000
Dinabolt 10 x 100 1 Pcs Rp 3,000
Dinabolt 12 x 100 1 Pcs Rp 4,460
Dinabolt 16 x 100 1 Pcs Rp 8,175
Dinabolt 16 x 150 1 Pcs Rp 12,400
Dinabolt M10x100 mm 1 Pcs Rp 4,000
Dop /Plug 3/4" Galvanis 1 Pcs Rp 8,000
Dorang / gagang 1 pcs Rp 15,000
Double naple 1" GG,Galvanis 1 pcs Rp 14,000
Double naple 1/2" galv. 1 pcs Rp 9,500
Double naple 3/4" Galvanis 1 pcs Rp 11,000
Drilling 1 cm 1 pcs Rp 400
Drilling screw 2 cm 1 Pcs Rp 275
Drilling screw 2,5 cm 1 Pcs Rp 350
Drilling screw 5 cm 1 Pcs Rp 600
Earplug - Silicon with case 1 set Rp 11,400
Elbow 1" CS 1 Pcs Rp 15,000
Elbow stainless 6" sch 10 seamless 1 pcs Rp 920,000
Ember cor 1 Pcs Rp 10,000
Ember orange 1 Pcs Rp 7,000
Fall arrester 1 pcs Rp 725,000
Fiber Nok tbl 1,2 mmL50cm 1 Lbr Rp 130,000
Flashing Galvalume AZ150,400 mm 1 m¹ Rp 25,500
Full drat 16 x 1 mtr 1 btg Rp 37,500
Galvalume 0,4 L120 cmx58 cm AZ 100 1 m¹ Rp 71,000
Gancu 1 pcs Rp 85,000
Gergaji Bata ringan 1 pcs Rp 45,000
Gergaji besi + Stang 1 set Rp 45,000
Gergaji Kayu 1 pcs Rp 40,000
HB200.200.8.12 - 12 m ,SNI 1 Btg Rp 7,008,300
HB300.300.10.15 - 12 m ,SNI 1 Btg Rp 15,566,400
Helm Proyek - kuning 1 Pcs Rp 28,000
Helmet Proyek - blue - Krisbow 1 Pcs Rp 75,200
Hollow 100.50 tbl 2 mm-6 m 1 Btg Rp 340,000
Hollow 100.50.2 mm-6 m 1 Btg Rp 296,000
Hollow 40.40.2,9 mm-6 m 1 Btg Rp 198,000
Hollow 40.80 tbl 2 mm-6 m 1 Btg Rp 255,000
Hollow 40x20x1 mm x 6 m 1 Btg Rp 56,000
Hollow 40x40x1 mm x 6 m 1 Btg Rp 98,500
Hollow 40x40x1,2 mm x 6 m 1 Btg Rp 138,000
Hollow 40x40x2 mm x 6 m 1 Btg Rp 204,000
Hollow 40x60x1,2 mm x 6 m 1 Btg Rp 235,000
Hollow 50.100 tbl 2 mm-6 m 1 Btg Rp 320,000
Hollow 50.50.3,2 mm-6 m 1 Btg Rp 275,000
Hollow 80.40 tbl 2,3 mm-6 m 1 Btg Rp 290,000
Hollow Galvanis 20.40 tbl 0,3 mm 1 Btg Rp 20,000
Isi tabung Acitylene - Samator 1 unit Rp 198,000
Isi tabung LPG - Gotty 1 unit Rp 150,000
Isi tabung oksigen - samator 1 unit Rp 65,000
Isoflek 1,2x40mx4 mm 1 roll Rp 1,104,000
Jarum keras 1/2" 1 Pcs Rp 25,000
Jarum keras M12 1 Pcs Rp 25,000
Jarum keras M16 1 Pcs Rp 55,000
Jarum keras M20 1 Pcs Rp 65,000
Jurigen 15 ltr 1 Pcs Rp 30,000
Jurigen 5 ltr 1 pcs Rp 10,000
Kabel 4 x 4 mm - 3 phase Hitam 1 mtr Rp 31,000
kabel ties 120 mm 1 pack Rp 22,000
Kaca mata debu - Goggle Chemical Heavy Duty 1 Pcs Rp 93,500
Kain Majun 1 kg Rp 8,000
Kapi 1 pcs Rp 10,000
Kawat Ayak 1 m Rp 17,000
Kawat Bindrat ,1 roll = 5 kg 1 roll Rp 100,000
Kawat Las AWS 6013 2,5mm-Golden bridge 1 Kg Rp 17,000
Kawat Las AWS 6013 3,2mm-Golden bridge 1 Kg Rp 16,000
Kawat Las LB-52 Familiarc 1 Pack Rp 188,000
Kawat Las Mig 1,2mm Antech steel flug cored wire E71T 1 roll Rp 345,000
kawat putih 1 kg Rp 30,000
Kayu 6 x 12 1 Btg Rp 160,000
Kayu usuk 4 x 6 ,1 pack = 6 btg - MC 1 pack Rp 250,000
Keramik putih polos uk.30x30 cm - asia tile 1 m² Rp 45,000
Kikir Gergaji 1 pcs Rp 20,000
Klemp pipa 4" 1 pcs Rp 7,500
Knee 1" Galv. 1 Pcs Rp 15,000
knee 3/4" Galv. 1 Pcs Rp 10,000
Knee PVC 4"- 45 1 Pcs Rp 27,500
Kotak P3K 1 set Rp 270,000
Kuas Eterna 1" s/d 2 1/2" 1 Pcs Rp 12,000
Kunci Pipa 14" 1 pcs Rp 94,000
Kunci Sock tekiro 18 mm 1 Pcs Rp 25,000
Lem kayu rajawali 1 pcs Rp 17,000
Lem PVC , 1kg 1 klg Rp 45,000
Linggis 3/4" 1 pcs Rp 45,000
Linggis 5/8" 1 pcs Rp 40,000
LNP 100x100x10 - 6 m ,SNI 1 Btg Rp 1,025,000
LNP 50x50x5 - 6 m ,SNI 1 Btg Rp 78,000
Mata Bor 12 mm for stainless 1 Pcs Rp 238,000
Mata Bor 6 mm for stainless 1 Pcs Rp 74,800
Mata Bor beton 14 mm 1 Pcs Rp 25,000
Mata Bor M12 1 pcs Rp 30,000
Mata bor SDS 14 mm ex.bosh 1 Pcs Rp 62,000
Mata bor stainless Ryu 10 mm 1 Pcs Rp 92,000
Mata Gerinda- cutting i-prix 4" ,1 dus = 20 pcs 1 dus Rp 56,100
Mata Gerinda- Grinding disk i-prix 4" ,1 dus = 25 pcs 1 dus Rp 112,000
Mata gerinda potong 4" 1 pcs Rp 7,000
Mata gerinda potong keramik/beton ui.4" 1 pcs Rp 55,000
Meja Kerja - Knockdown 1 unit Rp 350,000
Mesin Hand Bor Ryu 10 mm - 12 mm 1 unit Rp 270,000
Meteran 30 Mtr 1 Pcs Rp 75,000
Meteran 5 Mtr 1 Pcs Rp 30,000
Multiplek 9 mm - sengon 1 Lbr Rp 110,000
Mur 1/2" 1 Pcs Rp 750
Mur 10 1 Pcs Rp 600
Mur 12 1 Pcs Rp 750
Mur 16 1 Pcs Rp 1,500
Nat keramik - putih polos 1 pcs Rp 15,000
Nozzle Acetylene 1 unit Rp 70,000
Obeng 1 set Rp 70,000
Pacul 1 Pcs Rp 45,000
paku cor 1" 1 pack Rp 16,000
Paku Kayu 1/2",1,1 1/2"",3" 1 Kg Rp 11,000
Paku payung 1 Kg Rp 30,000
Paku rivet 550 1 Pcs Rp 200
Palu 1 Pcs Rp 49,000
Palu Karet 1 Pcs Rp 25,000
Pasir - Mjk 1 m³ Rp 310,000
pilox 1 Pcs Rp 30,000
Pipa CS 4" - Seamles,tbl 3,2 mm - 6 m (pipa Gas) 1 Btg Rp 840,000
Pipa galvanis 2" LGH 2,7-2,8 mm 1 Btg Rp 457,000
Pipa Galvanis 3" LGH tbl 3,2 mm 1 Btg Rp 750,000
Pipa Galvanis 4" Med SNI 4.1-4.2 1 Btg Rp 1,303,000
Pipa Hitam 1" CS x 6 m SNI 1 Btg Rp 213,000
Pipa Hitam 2" CS x 6 m SNI,t : 2 mm 1 Btg Rp 200,000
Pipa Hitam 2" CS x 6 m SNI,t : 2,3 mm 1 Btg Rp 239,000
Pipa Hitam 3" CS x 6 m SNI,t : 2,3 mm 1 Btg Rp 406,000
Pipa PVC 1 1/2" D - 4 m 1 btg Rp 34,000
Pipa PVC 3/4" AW - 4 m 1 btg Rp 30,000
Pipa PVC 4" AW vinillon - 4 m 1 btg Rp 270,000
Pipa PVC 4" D Maspion - 4 m 1 btg Rp 160,000
Pipa PVC 6" ,pjg = 1 mtr - Bekas 1 btg Rp 50,000
Plat 10 x4"x8"-SNI 1 Lbr Rp 2,029,710
Plat 12 x4"x8"-SNI 1 Lbr Rp 2,436,000
Plat 14 x4"x8"-SNI 1 Lbr Rp 2,818,200
Plat 15 x4"x8"-SNI 1 Lbr Rp 3,080,000
Plat 16 x4"x8"-SNI 1 Lbr Rp 3,245,100
Plat 2 x4"x8"-SNI 1 Lbr Rp 581,000
Plat 6 x4"x8"-SNI 1 Lbr Rp 1,302,000
Plat 8 x4"x8"-SNI 1 Lbr Rp 1,626,900
Plat bordes 5 mmx4"x8" 1 Lbr Rp 1,268,000
Plat strip 1 1/4x4x6 1 Lbr Rp 29,000
Pleser 6,8,10 mm - 40 cm 1 pcs Rp 21,000
PRCD typ.9474584 1 Unit Rp 9,753,700
Readymix K250 fc'21 NFA include PPN - Th 2019 1 M³ Rp 874,500
Regulator Acetylene 1 unit Rp 175,000
Rental Excavator -Mjkt Non incld BBM+UM 1 Jam Rp 130,000
Rental Mesin Genset- Mjkt 1 Hari Rp 150,000
Rental Mesin Jack hammer- Mjkt 1 Hari Rp 225,000
Rental Mesin Stamper- Mjkt 1 Hari Rp 275,000
Rental Mesin Vibrator - Mjkt 1 Hari Rp 250,000
Reng Galvalume - Baja Ringan - P: 6 m 1 Btg Rp 36,000
Ring 16 1 Pcs Rp 750
Ring plat 3/4" 1 Pcs Rp 550
Ring plat 5/8" 1 Pcs Rp 450
Rolset 4" (stang rol) 1 Pcs Rp 19,000
Rompi - Safety Vest Mesh All - Krisbow 1 pcs Rp 51,200
Rompi orange 8 pcs Rp 14,000
Sarung Tangan - Bintik 1 pack Rp 35,000
Sarung tangan - Glove Cotton 1 pack Rp 62,400
sarung tangan kombinasi 1 pair Rp 36,000
Sealent kaca 1 pcs Rp 37,000
Sealtape 1/2" 1 Pcs Rp 3,500
Sekop + gagang 1 pcs Rp 35,000
Selang Air 5/8" 1 mtr Rp 9,000
Selang jet shower closed 1 set Rp 35,000
Semen Gresik 50 Kg 1 Bag Rp 60,000
Semen perekat bata ringan eco mortar 1 Bag Rp 80,000
seng aluminium 0,3 x 1200 (B) 1 mtr Rp 60,000
Sepatu boot - with Safety shoes 1 set Rp 75,000
Sepatu boot biasa - kw 1 1 set Rp 60,000
serat fiber 1 lbr Rp 3,000
Sikat kawat Baja 1 Pcs Rp 7,500
Sikat kawat kuningan 1 Pcs Rp 8,000
Sock 1" galvanis 2 pcs Rp 12,000
Sock drat 3/4" Galv. 1 pcs Rp 9,000
Sock drat dalam 1" sdd 1 Pcs Rp 10,000
Socket drat 1/2" SS304 2 Pcs Rp 35,000
socket joint pin 5 x 32 A 1 Pcs Rp 45,000
Spandek transparan, P: 6 m L: 1 m 1 Lbr Rp 695,000
Spotcheck MGNFLX - Cleaner only 1 btl Rp 100,000
Spotcheck MGNFLX - Developer only 1 btl Rp 100,000
Spotcheck MGNFLX - Penetrant only 1 btl Rp 100,000
Stang blender - kecil 1 unit Rp 565,000
Stang sock only p= 320 mm 1 Pcs Rp 201,500
Steker 1 phase 1 Pcs Rp 13,000
Stop kontak industri - Plug 2x16 1 Pcs Rp 35,000
Talang Galv. 90cm , t 0,3 1 m¹ Rp 35,000
Talang L1200 t 0,4 1 m¹ Rp 72,000
Tang ex.tekiro 1 Pcs Rp 50,000
Tensla 1 m³ Rp 370,000
Terpal - uk 6x10 m 1 Lbr Rp 450,000
Terpal - uk6x10 m = 5 lbr A1 1 Lbr Rp 270,000
Terpal 3x4 m 1 Lbr Rp 55,500
Terpal 4x6 m 1 Lbr Rp 130,000
Thinner B impala 5 ltr 1 Gln Rp 109,000
Thinner Sakura 1 Gln Rp 60,000
Timba Cor 1 pcs Rp 10,000
Trafic cone 70 cm 2 unit Rp 248,000
Travo Las Stick DACH 180i 1 Unit Rp 2,810,000
Triplek 18 mm 1 Lbr Rp 200,000
Triplek 8 mm 1 Lbr Rp 100,000
Trowel 1 pcs Rp 21,000
U-Bolt 1/2 x 6" 1 pcs Rp 14,500
U-Bolt 3/8 x 4" 1 pcs Rp 8,500
U-bolt 5/16 x 1 1/2" 1 Pcs Rp 5,000
U-Bolt 5/16 x 2 " 1 pcs Rp 5,500
U-Bolt 5/16 x 2 1/2" 1 pcs Rp 6,000
U-Bolt 5/16x1" 1 Pcs Rp 3,500
U-bolt 8" 1 Pcs Rp 17,500
UNP 100x50x5mm - 6m ,SNI 1 Btg Rp 525,000
UNP 120x55x5,5 mmx6 m SNI 1 Btg Rp 609,000
UNP 150x75x6,5 mm - 6m ,SNI asli 1 Btg Rp 1,215,000
Usuk Galvalume - Baja Ringan - p: 6 m 1 Btg Rp 72,500
V tee galv.1" x 3/4" drat 1 Pcs Rp 30,000
V. sok 2x1" Galvanis 1 pcs Rp 29,000
V.Sock 1"x3/4" Galvanis 1 Pcs Rp 13,000
V.Sock 3/4"x1/2" Galvanis 1 Pcs Rp 11,000
Watermur 1 1/2" Galvanis 1 pcs Rp 60,000
Watermur 1" Galvanis 1 pcs Rp 32,000
Waterpas 1 Mtr - Biasa 1 pcs Rp 70,000
Weldbrite (ss pickling gel) 1 btl Rp 150,000
WF15075x5x7x12 m - SNI 1 Btg Rp 14,788,200
WF200x100x6x9 -12 m SNI 1 Btg Rp 4,260,000
WF250x125x6x9 -12 m SNI / LS 1 Btg Rp 4,191,360
WF350x175x7x12 m - GG 1 Btg Rp 16,844,160
WF350x175x7x12 m - SNI 1 Btg Rp 7,320,960
WF400x200x8x13 - 12 mtr GG 1 Btg Rp 11,167,200
WF450x200x9x14 - 12 mtr 1 Btg Rp 7,223,000
WF450x200x9x14 - 6 mtr 1 Btg Rp 7,223,000
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Rp 8,146
Rp 9,228
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
Des 20
11700/kg
13.800/kg
Des 20
Des 20
Des 20
Des 20
Rp 11,313
Des 20
Des 20
Des 20
Des 20
8.700/kg
8.700/kg
8.600/kg
8.800/kg
8.700/kg
9.300/kg
8.700/kg
Des 20
Des 20
Des 20
11.800/kg
11.800/kg
12.300/kg
13.750/kg
Online-2021
Online-2021
Online-2021
DAFTAR ANALISA PEKERJAAN MATERIAL
Kayu Seng Paku
PEKERJAAN
(m³) (lbr) (Kg)
PERSIAPAN
Pagar pengaman T: 2M m¹ 0.016 1.250 0.600
Bouwplank m¹ 0.010 0.060
Bouwplank ttk 0.019 0.010
Direksikeet 10 m² 0.040 0.400 0.200
Pembersihan Lapangan m²
BONGKARAN +PEMBERSIHAN
Dinding tembok m²
Lantai / tread m²
plesteran m²
penutup atap m²
Kayu Gedeg guling Paku
(btg) (m²) (Kg)
PE. TRUCUK
Bambu 8-12 m L= 250 cm bt 1.000
Gelam 8-12 m L= 250 cm bt 1.000
Perancak m² 8.000 1.150 0.300
Bambu Gedeg guling Kawat
(btg) (m²) (Kg)
KISDAM
Tinggi 1.00 m tbl 0,60 m m¹ 3.000 2.400 0.200
Tinggi 1.50 m tbl 0,60 m m¹ 4.000 3.300 0.300
Tinggi 2.00 m tbl 0,60 m m¹ 5.000 4.400 0.400
Tinggi 2.50 m tbl 0,60 m m¹ 6.000 5.500 0.500
TURAP BAMBU
Tinggi 2,75 m m¹ 1.000 3.000 0.200
Tinggi 1.50 m m¹ 1.000 1.635 0.109
Alat
Bantu
BOR TANAH
Dia 200 mm , L = 2,5 m Bh 1.000
ps/srt Kpr ps
Alat
tnh (³) (m³)
GALIAN / URUGAN
Galian Tanah Manual :
Tanah biasa m³
Tanah keras m³
lumpur m³
Tanah h>1 m per m tambah (untuk menaikkan tanah dari lubang galian)
Lumpur h>1 m per m tambah (untuk menaikkan tanah dari lubang galian)
Galian tanah alat berat : m³
Excavator jam 0.078
Dumptruck jam 0.074
Buangan tanah :
Jarak s/d 30 m m³
Truck / Km m³ Sewa truck = 0.250 Jam
Urugan :
Tanah Kembali (ged) m³
Tanah kembali (jembt) m³
Jarak s/d 30 m m³
Jarak 30 m s/d 100 m m³
Pasir / sirtu / tanah m³ 1.200
Pudel m³ 0.875 0.145
Pemadatan : m³
Stamper Hari 0.007
Wales Hari 0.003
Meratakan Tanah m²
mat'l umum Pc Pasir
(m³) (kg) (m³)
PASANGAN
Pasangan Batu -Belah Bt.belah
Aanstamping m³ 1.200 0.050
1 pc : 2 ps m³ 1.200 264.700 0.430
1 pc : 3 ps m³ 1.200 203.500 0.530
1 pc : 4 ps m³ 1.200 162.550 0.522
1 pc : 5 ps m³ 1.200 136.050 0.544
1 pc : 6 ps m³ 1.200 116.950 0.561
1 pc : 1/2 kp : 4 ps m³ 1.200 150.100 0.480
1 pc : 3 kp : 10 ps m³ 1.200 66.150 0.490
1 kp : 1 sm : 1 ps m³ 1.200 0.230
1 kp : 1 sm : 2 ps m³ 1.200 0.340
1 kp : 1 sm : 3 ps m³ 1.200 0.405
1 kp : 2 ps m³ 1.200 0.532
Pasangan Bata-merah Bata
1 pc : 2 ps m³ 450-600 206.000 0.330
1 pc : 3 ps m³ 157.500 0.380
1 pc : 4 ps m³ 126.450 0.410
1 pc : 5 ps m³ 105.800 0.423
1 pc : 6 ps m³ 90.950 0.436
1 pc : 1/2 kp : 4 ps m³ 117.000 0.380
1 pc : 3 kp : 10 ps m³ 51.300 0.382
1 kp : 1 sm : 1 ps m³ 0.178
1 kp : 1 sm : 2 ps m³ 0.260
1 kp : 1 sm : 3 ps m³ 0.315
1 kp : 2 ps m³ 0.368
Bata kosong m³
Batako 4" Batako
1 pc : 4 ps m² 13.750 6.150 0.025
Roster : m² 1,10 m² 0.970 0.168
Sal. Buis beton :
Dia 15 cm m¹ 1.000
Dia 25 cm m¹ 1.000
U 15 m¹ 1.000
U 25 m¹ 1.000
mat'l umum Pc Pasir
(m³) (kg) (m³)
PLESTERAN
Plesteran ,t : 15 mm
1 pc : 2 ps m² 13.350 0.0171
1 pc : 3 ps m² 10.200 0.0195
1 pc : 4 ps m² 8.100 0.0210
1 pc : 5 ps m² 6.940 0.0220
1 pc : 6 ps m² 6.180 0.0230
1 pc : 1/2 kp : 4 ps m² 5.100 0.0204
1 pc : 3 kp : 10 ps m² 2.440 0.0060
1 kp : 1 sm : 1 ps m² 0.0090
1 kp : 1 sm : 2 ps m² 0.0138
1 kp : 1 sm : 3 ps m² 0.0162
1 kp : 2 ps m²
Benangan /Kol-kolan m¹ 6.500 0.0090
Saputan semen m² 6.000
Siar/ strike m² 4.000 0.0100
Bt bobos/ampyang/Klinker m² 1.100 8.100 0.0210
mat'l umum Pc Pasir
(kg) (m³)
PEK. BETON
1 pc : 1 1/2 ps : 2 1/2 Kr m³ 415.000 0.480
1 Pc : 2 ps : 3 Kr m³ 340.000 0.540
1 pc : 2 ps : 4 Kr m³ 298.300 0.480
1 Pc : 3 Ps : 5 Kr m³ 232.000 0.560
1 Pc : 4 Ps : 6 Kr m³ 212.000 0.620
K-225 324.000 0.486
Grouting m³ 1,950 kg
Alat/m³ beton :
Pengaduk beton Jam 1.000
Penggetar beton jam 1.000
Pompa Air jam 0.330
Triplek Kayu Paku reng
(lbr) (M³) usuk (kg)
PEK. BEKESTING
Bekisting 1 x pakai m² 0.347 0.030 0.200
Analisa Beton :
Spesi beton m³
Besi beton kg
Bekisting m²
Steiger m²
Bongkar/Menyiram m³
mat'l umum Pc Pasir
(kg) (m³)
PEK. LANTAI
Tegel abu-abu m² 1,10 m² 1.000 0.032
Teraso (incl. poles) m² 1,10 m² 1.000 0.032
Keramik m² 1,05 m² 5.850 0.020
Plint Abu-abu m¹ 1,10 m¹ 0.250 0.002
Plint Teraso m² 1,10 m² 2.000 0.005
Vinyl (lem=0,50 kg) m² 1,10 m²
Paving Stone m² 1,10 m²
mat'l umum Paku Lem
(kg) (kg)
PEK. KAYU
Kaso 5/7 & reng 3/5 m² 0.013 0.250
Kosen pintu / jendela m³ 1.100
Rangka atap & gording m³ 1.100 10.000
Lisplank 3/30 m¹ 0.010 0.100
Pintu double tripleks Ea 0.028 0.100 1.000
Pintu / jendela panel m² 0.035 0.100
Partisi double triplek m² 0.024 0.500
Plafond 1mx1m Triplek + rk m² 0.012 0.220
Plafond 1 m x 1 m m² 0.012 0.220 Mat'l plafond : 1,05 m²
mat'l umum Paku Kayu
(kg) (m³)
PEK. ATAP
Asbes gelombang m² 1.100 4 ea
Nok Asbes m¹ 1.100 2 ea
lisplank asbes datar + rk m² 1.100 0,20 Kg 0.030
genteng m² 1.100
mat'l umum
PENGGANTUNG / PENGUNCI
Engsel set 1.000
Hak angin set 1.000
Kunci tanam bh 1.000
PAGAR
Pagar BRC m² 1.000
Tiang pagar PMG 2" t=1.5 m bt 1.000
Pintu swing ganda 1,2 x 3,0 m¹ 1.000
Pintu dorong 1,2 x 3,0 m¹ 1.000
MATERIAL TENAGA KERJA ANALISA ALAT BERAT
Triplek Tukang Pekerja Mandor) NO
(lbr) (Hari) (Hari) (Hari)
1
0.500 0.050
0.050 0.025 0.005
0.100 0.050 0.010
1.000 0.250 0.750 0.025
0.075 0.003
3
0.200 0.025 0.240 0.019
0.033 0.250 0.020
4
1.000 0.050
Tukang Pekerja Mandor)
(Hari) (Hari) (Hari)
0.750 0.050
0.915 0.010
1.085 0.014
0.150 0.008
0.250 0.010
5
0.226 0.007
0.330 0.010
Jam 0.250
0.188 0.006
0.375 0.013
0.330 0.010 6
0.630 0.010
0.300 0.010
0.145 1.500 0.150
0.025
0.025
0.250 0.013
Kapur Semen Merah Tukang Pekerja Mandor)
(m³) (m³) (Hari) (Hari) (Hari)
10
0.350 0.050
0.354 0.051
0.500 0.050
0.540 0.051
Kapur Semen Merah Tukang Pekerja Mandor)
(m³) (m³) (Hari) (Hari) (Hari)
0.120 12
0.150 0.050
0.100 0.300 0.010
0.200 0.400 0.020
Split Tukang Pekerja Mandor)
(m³) (Hari) (Hari) (Hari)
4.000
2.000
0.120 0.060
0.140 0.080
0.340 0.100
0.087 0.174
0.063 0.250
0.069 0.278
0.026 0.278
ANALISA ALAT BERAT
DESCRIPTION KOEF NO DESCRIPTION KOEF
Stripping & Disposing SURFACING OF UNPAVED
13
Material / m² AREA / M²
Dozer 0.0050 Jam Crushed stone 5/7 0.0300 m³
Wheel loader 0.0050 Jam Crushed stone 2/3 0.0300 m³
Dump truck 0.0100 Jam Crushed stone 1/2 m³
Wages 1.0000 m² Natural sand 0.0600 m³
Asphalt kg
Compactor 0.0100 jam
Wages 1.0000 m²
26 CONCRETE PIPE M¹
Dia 90 CM
Concrete pipe dia 90 cm 1.1000 m¹
Natural sand 0.0800 m³
PC 0.7500 zak
Support material 1.0000 ls
Wages 1.0000 m¹
27 CONCRETE PIPE M¹
Dia 100 CM
Concrete pipe dia 100 cm 1.1000 m¹
Natural sand 0.0950 m³
PC 0.8500 zak
Support material 1.0000 ls
Wages 1.0000 m¹
Pipe 1.1000 m¹
Accessories 1.0000 ls
Consumable 1.0000 ls
Wages 1.0000 m¹
Rp 37,500
Rp 37,500
Rp 3,750
Rp 78,750
NO DESCRIPTION KOEF NO DESCRIPTION
PRECAST MANHOLES / EA STEEL REBAR FABRICATION
29 41
/ KG
Precast manhole 1.0000 ea Steel rebar
Rebar 300.0000 kg Wire
Asphalt 10.0000 kg
Steel Grating cover 25.0000 kg
Steel wages 325.0000 kg
Erection 1.0000 ea
REINFORCED CONCRETE
35
SLAB / M³
Readymix concrete 1.0500 m³ CONBLOCK WALL T: 4"
48
Vibrator 0.2000 jam / M²
From material 0.0000 m³ Conblock 4"
Plywood 0.0000 lbr Natural sand
Nail 0.0000 kg PC
Rebar kg Wages
Wire kg
steel fabr.&install kg
from wages m²
Pouring wages 1.0000 m³
False work wages 0.0000 m¹ VENTILATION BLOCK / M²
49
PAVING BLOCK / M²
36
Roster
Paving block 1.0000 m² Colour PC
Natural sand 0.1200 m³ Wages
Wages 1.0000 m²
GUTTER BOARD / M¹
51
FORM WORK / M²
38
FOR HIDDEN SUFACE Wood
Material form 0.0120 m³ Nail
Plywood 0.1273 lbr Zink steel
Nail 0.2500 kg Wages
Form Wages 1.0000 m²
53 WALL PAINT / M²
40 FORM WORK / M²
FOR BEAM & SLAB > 6 M Wall paint
Material form 0.0180 m³ wall plamur
Plywood 0.1273 lbr Rought paper
False work 1.0000 m² Minor tools
Nail 0.2500 kg wages
Form wages 1.0000 m²
False work wages 1.0000 m²
54 WOOD PAINT / M²
Wood paint
Primer coat
Oil solvent
Rought paper
minor tool
wages
BAHAN MATERIAL
G OF 5 1.00 M²
Sewa finisher termasuk BBM
1.0000 m²
0.1000 ltr
1.0000 m²
13.7500 ea
0.0450 m³
0.2000 zak
1.0000 m²
BAHAN MATERIAL
9 MEMPRODUKSI 1 TON LATAS
Batu pecah 0,5/1
Pasir kasar
1.0500 m² tepung batu/liller
0.0200 m³ Aspal panas 60/70
0.0250 zak
0.2400 zak
1.0000 m² Biaya sewa peralatan :
A M P 30T
Shovel / loader
Dumptruck 3,5 T
G 1:4 Alat bantu
0.1800 Zak
0.0200 m³
1.0000 m²
BAHAN MATERIAL
17 1.00 TON
ATB / ATBL
Lapis resap pengikat
M² Menghampar dengan Finished
Menggilas dengan TANDEM
50.0000 ea Menggilas dengan PTR
0.1000 zak
1.0000 m²
M²
0.0149 m³
0.2500 kg
kg BAHAN MATERIAL
1.0000 ls
1.0000 m² 21 1.00 Ton
0.5000 lbr
1.2000 ea BAHAN MATERIAL
4.0000 ea
1.0000 m¹ 25 1.00 M¹
Batu belah
PC
Pasir pasang
0.2500 kg
0.2500 zak
0.2000 lbr
1.0000 ls
1.0000 m²
0.3333 kg
0.1667 kg
0.2500 ltr
0.2000 lbr
1.0000 ls
1.0000 m²
6.8000 m¹
1.6800 m²
0.4000 m²
3.3600 m²
4.6000 m¹
4.6000 m¹
4.6000 m¹
1.1200 m²
2.0000 ea
2.0000 ea
1.0000 ea
1.0000 unit
ANALISA JALAN ANALISA JALAN
BAHAN MATERIAL TENAGA KERJA BAHAN MATERIAL
MENGGILAS DGN PNEUMMATIK TIRE ROLLER 6 1.00 M² LAP. PERKERASAN 10-15 CM (PADAT)
nisher termasuk BBM 1.0000 Hr Maisnis 1.000 hr Batu belah 0.2000
Kenet 1.000 hr Batu pecah 0.0500
Pekerja 2.000 hr
UATAN STONE SHEET 14 1.00 LT LAPIS ASPAL RESAP PENGIKAT (PRIME COA
cah 0,5/1 13.0000 m³ Pekerja 6.000 hr Aspal cutback 635.00
asar 56.0000 m³ Tukang 2.000 hr Aspal Sprayer 5.0000
batu 9.0000 m³ Pengemudi 8.000 hr Compressor 5.0000
anas 8.4000 ton Mandor 1.000 hr
ewa peralatan :
30T 4.0000 jam
/ loader 4.0000 jam
uck 5 T 25.0000 jam
ntu 3.000 jam
jam
jam
jam
ls
ESAP PENGIKAT (PRIME COAT) 15 1.00 LT LAPIS ASPAL RESAP PENGIKAT (TAKE COAT)
kg Mandor 1.000 hr Aspal cutback 480.00 kg Mandor 1.000
jam Operator 2.000 hr Aspal Sprayer 5.0000 jam Operator 2.000
jam Pekerja 5.000 hr Pekerja 5.000
ton Pekerja 0.150 hr aspal hotmix/stone sheet 0.0690 ton Pekerja 0.150
ltr mandor 0.015 hr Lapis pengikat 0.4000 ltr mandor 0.015
m² Menghampar dengan Finished 1.0000 m²
m² Menggilas dengan TANDEM 1.0000 m²
m² Menggilas dengan PTR 1.0000 m²
TENAGA KERJA
ECARA OVERPAINT
UT TEBAL 0,5-1 CM)
kg Pemasak aspal 0.300 hr
m³ Pekerja 8.000 hr
m³ mandor 0.400 hr
bln
GA KERJA BAHAN MATERIAL TENAGA KERJA
15%
Rp 14,193
Rp 1,500
Rp 15,693
Rp 4,500
Rp 4,500
Rp 20,193
15%
Rp -
Rp -
Rp -
Rp -
Rp 50,000
Rp 19,500
Rp 69,500
Rp 15,000
Rp 26,000
Rp 3,120
Rp 1,950
Rp 46,070
Rp 115,570
Rp 70,000
Rp 19,500
Rp 89,500
Rp 15,000
Rp 26,000
Rp 3,120
Rp 1,950
Rp 46,070
Rp 135,570
Rp 19,920
Rp 8,400
Rp 23,400
Rp 51,720
Rp 15,000
Rp 26,000
Rp 3,120
Rp 1,950
Rp 46,070
Rp 97,790
Rp 144,000
Rp 144,000
Rp -
Rp 100,000
Rp 19,500
Rp 119,500
Rp 263,500
MIX DESAIN CONCRETE (SET MIX)
SNI - 7394
2,330.00 K-100
2,331.00 K-125
2,330.00 K-150
2,330.00 K-175
2,329.00 K-200
2,331.00 K-225
2,330.00 K-250
2,331.00 K-275
2,330.00 K-300
2,330.00 K-325
2,330.00 K-350
LUAS 1150 M²