You are on page 1of 2

Keys to Successful Mixed-Use

and Infill Development

The Urban Land Institute (ULI) has stud- having development conditions imposed Finding Solutions
ied hundreds of real-world examples that that are not economically feasible.
illustrate how communities and developers How do communities overcome these
• Parking. Costs for structured or under- challenges? Mixed-use and infill develop-
have successfully used mixed-use develop-
ground parking frequently result in proj- ment offer many advantages and ways to
ment to create vibrant places that enhance
ects that are not economically viable. respond to changing attitudes, demo-
the quality of life. According to the re-
search, such success relies on communities • Resizing infrastructure. A single high- graphic shifts, economic/energy impera-
building new skills and knowledge of the density infill project may overburden tives and greater demands from residents
planning and economic solutions associ- the water and sewer system and parks for a quality community. Here are some
ated with infill development. and roads serving the area. Having a specifics of how successful communities
single project bear the entire cost of approach the challenges.
resizing the infrastructure can make the First, engage the community. Success-
Identifying the project an economic non-starter. ful mixed-use development starts with
Challenges • Financing challenges. When the retail community understanding and commit-
component takes much longer to sell ment. This means involving residents,
Understanding potential constraints at the
or lease than the residential compo- developers, businesses, environmentalists
outset so that they can be addressed dur-
nent, the project will face difficulty in — in other words, all stakeholders — in
ing the planning and entitlement process
obtaining financing. In addition, it can a dialogue about how mixed-use devel-
is a key factor in successful projects. Mak-
be difficult to close sales on condo- opment can offer the means to achieve
ing such development happen is difficult
minium projects because the federal community goals.
because of its economic and physical com-
plexity. The primary challenges include: agencies that guarantee residential Address the project economics dur-
mortgages require a significant percent- ing community planning. A successful
• Community acceptance. Residents age of committed pre-sales before they planning process goes beyond land use
sometimes oppose higher density will fund loans for closing. and addresses economics, the market and
development due to concerns that it
• Conflicts among uses. Parking-related infrastructure funding. For example, effec-
breeds crime and congestion and fun-
conflicts between residential and other tive planning recognizes the critical impor-
damentally changes the character
uses are common, as are residents’ com- tance of phasing in the infrastructure and
of the community.
plaints about noise from bars and odors amenities in completed segments as the
• Entitlement risk. Controversy can from restaurants. development proceeds, taking into ac-
extend the time for developers to count market cycles and the time it takes
complete the entitlement process and • Too much density. Some developers to complete a larger mixed-use project. It
thus increase their financial risks, which try to achieve densities that are higher also addresses the issue of the appropriate
include losing their investment — either than optimal for the location or than density in terms of market support.
in land or costly studies — and poten- the market can support, resulting in
community opposition and projects Set high development standards. As
tially ending with no entitlement or
that don’t make economic sense. part of the final plan, communities

James W. Andrew is a land-use attorney at the San Francisco office of Buchalter Nemer and can be reached at <jandrew@buchalter.com>.
Charles A. Long is a San Francisco Bay Area-based mixed-use infill developer and a former California city manager; he can be reached at
<charlesalong@gmail.com>. Andrew and Long are co-chairs of the Urban Land Institute San Francisco District Council Sustainability
Committee.
10 League of California Cities www.cacities.org
should not be afraid to impose high
development standards even if they cost
more; in the long term, higher develop-
ment costs result in adjustments to land infrastructure among the properties that
prices and create long-term value. If the benefit from it. In some cases, public
costs of development are clear before a co-investment in theaters, plazas or
developer buys the land, the developer parking catalyzes a project’s economic
can build those costs into the project vitality. And in other situations,
budget (called a pro-forma). High qual- using tax-increment financing can
ity development will ultimately pay for address economic “gap” issues, in-
itself with an improved quality of life and cluding the long lead time needed to
greater long-term community value. lease or fill retail space. Understand-
ing the market in the community, the
Simplify the process for developers. fundamentals of real estate econom-
Infill areas evolve best on a foundation ics and how to responsibly deploy
of thoughtful, upfront planning that public-sector tools can help an agency
includes parks, schools, employment and determine when using public resources
commercial elements. Long-term, con- is justified by the net public benefits that
sistent plans make it easier for mixed-use are created.
development to occur than making each
project fight its way individually through
the development review process. Accord- Putting It All Together
ing to the Greenbelt Alliance, a San Fran-
cisco Bay Area advocacy group for open Mixed-use development is harder to
space and vibrant places, “By streamlining execute successfully because it is inher-
permitting and construction processes, ently more complicated physically and About the Urban
economically than the type of develop-
getting departments to work together to
ment many communities have histori- Land Institute
promote infill and ensuring that require-
ments are consistent, cities can smooth cally experienced. But ULI’s research on
The Urban Land Institute (ULI) is
the way for good development.” successful projects shows that mixed-
an international research orga-
use development, in the context of a
nization dedicated to providing
Prepare for public-private partnerships community-based plan that addresses
leadership in the responsible
where appropriate. The scope of mixed- the economic, financial and infrastruc-
use of land and in creating and
use development may require public- ture issues, makes communities more
sustaining thriving communities
private partnerships that leverage private desirable places to live and responds to
worldwide. For more information
investment to create community benefits. the environmental, social and economic
visit www.uli.org.
Many communities have used land- challenges facing cities today. n
secured financing, such as community
facilities districts or assessment bonds, © 2010 League of California Cities.
All rights reserved. Reprinted with
to create a fair spread of the cost of new
permission from the March 2010 issue
of Western City magazine, the monthly
publication of the League of California Cities.
www.westerncity.com For more information, visit www.westerncity.com. 11

You might also like