Engineering Work Progress

Inspection Requests Progress Chart

Replied with Replied with Replied with Replied with


Total Number Submitted Not Replied
Code A Code B Code C Code D
347 187 54 73 0 33
100% 54% 16% 21% 0% 9.51%

Inspection Requests Progress Chart


33; 9%
0; 0%
Replied with Code A
Replied with Code B 73; 21%
Replied with Code C 187; 54%
Replied with Code D
Not Replied
54; 16%

Documents Progress Chart

Replied with Replied with Replied with Replied with


Total Number Submitted Not Replied
Code A Code B Code C Code D
84 12 41 21 2 8
100% 14% 49% 25% 2% 10%

DocumentsProgress
Documents ProgressChart
Chart
8; 10% 0; 0%
73; 23% 12; 14%
2; 2%
Replied with Code A
Replied with Code A
Replied with Code B
Replied with Code B
Replied with Code C
Replied with Code C 54; 17%
Replied with Code D 21; 25% 187; 60%
Replied with Code D
Not Replied
41; 49%
Engineering Work Progress

Materials Submittals Progress Chart

Replied with Replied with Replied with Replied with


Total Number Submitted Not Replied
Code A Code B Code C Code D
22 9 0 1 12 0
100% 41% 0% 5% 55% 0%

Materials
Documents
Submittals
Materials Progress
Progress
Submittals Chart
ChartChart
Progress
0; 0%
0; 0%
73; 23%

Replied with Code A


9; 41%
Replied with Code B
Replied with Code C 54; 17%
12; 55%
187; 60%
Replied with Code D

1; 4% 0; 0%

Shopdrawings Progress Chart

Replied with Replied with Replied with Replied with


Total Number Submitted Not Replied
Code A Code B Code C Code D
192 3 72 64 0 53
100% 2% 38% 33% 0% 28%

Shopdrawings
Materials
Documents Progress
Submittals
Progress Chart
Progress
Chart
Chart
3; 2%
0; 0%
73; 23%

Replied with
Replied with Code
Code AA 53; 28% 72; 37%
Replied with
Replied with Code
Code BB
Replied with
Replied with Code
Code CC 54; 17%
187; 60%
Replied with
with Code
Code DD 0; 0%
Replied
64; 33%