Track Name: Primavera Basic and Advanced Levels (Level I – II)

Requirements:
 Project Management Basic Knowledge (Relations, duration calculation, AON and Project Network ...
etc.).
 Basic background in Project Management Required.

Content:

By using Primavera:
 Primavera Types and Versions.
 Setup Primavera.
 Program Icons Introduction.
 Create EPS and usages.
 Adding Project.
 Creating Project Calendars.
 Project WBS Meaning and creating.
 Creating Project Activities and relations.
 Project Resources.
 Profiles and Spreadsheets.
 Monitoring and Controlling
 Project Controlling Reports Example
 Layout and Printing.
 Advanced Orders.
 How to make combinations between projects.
 Extracting Project Start Dates from Contract.
 Time Schedules Types (Tender Plan, Baseline, Recovery, Revised).
 Creating Project Calendar (Ordinary Calendar & Procurement Calendar).
 Creating WBS and WPc using Primavera.
 Adding activities.
 Calculating Durations and assigning durations.
 Make Relations according site phases.
 Grouping and sort techniques and usage.
 Assigning Activity codes and real usages (Engineers, project phases, types or milestones).
 Activity Types (Milestones, LOE, WBS Summery, Resource dependent).
 Preparing Program for adding resources (Currency, Rate Type, units of measures).
 Estimating project resources.
 Creating and assign resources.
 Activities Profiles, Spreadsheets and Resources Profiles, Spreadsheets.
 Making Baseline or more than one.
 Updating using Primavera (Time and Cost Updates).
 Earned Value using primavera and performance evaluation.
 Time, Cost Evaluation from primavera.
 Indications of EV numbers from primavera and solutions.
 Filtering usages and techniques (Activities, Codes, Look Ahead …. Etc.).
 Export data from primavera to or from primavera, Excel.
 Basic Reports from Primavera.
 Printing Project and printing techniques.
 Construction Project Case study from A: Z from contract phase till closing phase.
 Starting by Small Project Using Basic Primavera Tools.
 Narrative Report for Projects.
 How to Revise Time Schedule (Revision Points of view).
 Global Change Usages.
 Resource Curve usages.
 Updating Types (Physical, Duration, Units).
 Updating Methods (Status, Progress spot light …. Others).
 Import Updating from Excel to Primavera.
 Importing External Baseline for Progress.
 Periodic Site Progress and adding to primavera.
 Leveling, Crashing Usage in Primavera.
 User defined columns.
 User defined and global change columns for showing costs types.
 Using contractual milestones.
 Project Constraints Types.
 Cash flow and estimating project ending costs.
 MEP Activities in Projects and sequencing.
 Infrastructure Activities and Time schedule structure.
 Residential Project from A: Z Using Primavera.
 Non-Residential Project from A: Z.
 Updating and projects Case studies.
 Main Points Required at Report (Contractor, Owner, Consultant).