Professional Documents
Culture Documents
PROFESSIONAL EXPERIENCE
Sep 2015 Dec 2016
Driver Group Canada
Position: Senior Consultant
Projects with Waterfront Toronto:
The replacement of the suspended spans of Macdonald Bridge
The Region of Waterloo Stage 1 Light Rail Project
. Burgoyne Bridge Replacement
Burgoyne Bridge Replacement
North York General Hospital Acute Building and Ambulatory Building
York Region Environmental Center at Elgin Mills
Summary:
Updating construction schedules and monitoring/reporting
Developing and maintaining project schedules with project team members
Prepare the Master Schedule for North York General Hospital Acute Building and Ambulatory Building
Prepare Master schedule for the Furniture and Equipment for Etobicoke Hospital
Summary:
Establish Detailed breakdown estimate for Substations Milton ,Bruce a and B
Prepare Detailed Man hours for Labors ,materials quantity, equipments hours for lines and substation
Researches and evaluates subcontractors based on price, quality, selection, service, support, etc. Solicits bid
proposals.
Established and setup schedule control activities & provided detailed schedule analysis
Use WBS in schedule to Communicate with SAP system in Bruce X Milton project
Monitored and updated the project schedule monitored progress and generated progress reports at all
levels of summary.
Export and import Data between SAP and Primavera
Performed cost estimating, cost budgeting/cost baseline, resource planning, cash flow & data analysis and
control activities and/or schedule development, maintenance. Monitoring activities & ensure work is
completed as scheduled & meets established milestones
Based on definition and scope of project, developed work breakdown structure to determine internal and
external deliverables, responsibilities and milestones to successfully implement the project
Supported project organizational and administrative activities when be delegated.
Updated forecasts (EV/SPI/CPI/EAC/ETC) & identified cost trends for management attention.
Worked with other organizations / subcontractors to coordinate work sequences with the project schedule,
cost management plan & total project plan.
Analyzed schedule progress and performance and identified developing problem areas.
Coordinated schedule variances, identified schedule impacts, forecast change process and provided
recommendations for performance improvement and/or corrective action to project management.
Contact with project and technical staff, to review of estimates, schedules and cost variance analyses.
Interfaced with all levels of project management, project controls staff and corporate counterparts for
schedule control issues & interfaced with client staff to provide schedule deliverables.
Interfaced with organization and client management for specific scheduling presentations
March 2005 August 2006 (part-time, evenings)
Hi-Tech Institute, Toronto
Position: Course Instructor for M/S Project and Primavera
Summary:
Worked as Part time Instructor for Primavera p3-1 and instructor for M/S Project
March 2003 December 2004
Gulf Consult in joint venture with Worley Parsons
Position: Project Planner & Estimator
Summary:
Maintained the cost proposal information
High-level Claims Analysis and Resolution
Budget Creation, Management and Cost Control
Responsible for applying Cost Control and Scheduling by using Primavera Software & M/S Project for
different types of projects in Kuwait, including hospitals (GMS Hospital, KOC Hospital); 42 floor
commercial building (Al-Babtian Tower), etc
Associated Engineering Partnership & Bennie Partnership Overseas Limited (England, Kuwait)
Position: Construction Manager
Summary:
Construction for two lift stations and renovation for sewer in Kuwait City
My project responsibilities included:
Project Construction for New Sanitary system in Kuwait City Area, Kuwait
Cost of Project $72 M
Coordinate with City for Investigation of existing utilities
Supervision Construction of 5 Km Micro station for sanitary pipe. ranging fro 2000 mm to 500 mm
Supervision the construction for open cut & prepare shop draw. total length for open cut (45 KM)
Prepare profile and section for open cut area
Coordinate equipment list for different crews
Make preliminary survey for existing utilities
Liaison with different city department for approvals
Construction for Library Building at Shuwaikh Campus - Kuwait
Following external work, which include paving, interlock tiles, curbstones, storm and sanitary
water supply.
LEED Canada Accredited Professional (LEEDAP) Canada Green Building Council 2009
PEng. Professional Engineer of Ontario 2006
PMP Certificate Project Management Institute PMI - 2005
B.Sc. Degree in Civil, Engineering, Zagazig University, Egypt, 1989
(EAE) Egyptian Association Engineers (Civil) Egypt - 1989
Kuwaiti Engineers Society, Kuwait - 1992
References: available upon request